Loading…
Loading…
5,161 results • Best match
Constt. Of Compound wall near lady bathroom near panchayat Ghar and chownk near h/o ex panch vijay kumar Pyt. chak jagtu Block Bishnah Year 2023 Scheme PRI Capex (block level)
REPAIR / MAINT TO PAVED AREA, COMPOUND WALL, SECURITY WALL, CONCERTINA COIL INCL CHAIN LINK FENCING IN STATION PARADE ROAD AND ADJOINING AREA UNDER AGE B/R-I OF GE (N) UDHAMPUR
Constt. of Compound wall with allied works at Radha Krishna Mandir w.no.1 at village kotli mian fateh. Pyt. Kotli Mian Fateh,Block Miran Sahib,Year 2026-27 under PRI Capex
Please Refer BOQ
REPAIR / MAINTENANCE OF SEWAGE LINE, MANHOLES, SEPTIC TANK, SOAKAGE WELL, RETAINING WALL, PATH / PLINTH PROTECTION, DRAINS BOUNDARY WALL AND OTHER CONNECTED WORKS AT AIR FORCE STATION NATHATOP UNDER GE (AF) UDHAPUR
Construction of boundary wall and allied works at Panchayat ghar in Sungal Lower C Panchayat Sungal Lower C, Block AKHNOOR under PRI Capex Budget for the year 2025-26 (Pyt. Level)
GE/BAS-21/2024-25 Repair to boundary wall, fencing, drain, path, culvert, gate , facia, chajja, plaster work, glass panes and misc work etc at Madhopur Mil station under GE Basoli
construction of boundary wall at GPS village and pyt kotli mian fateh, Pyt. Kotli Mian Fateh, Block Miran Sahib under PRI Distt. capex budget for the year 2024-25 Pyt level
Constt. Of boundary wall of shamshan ghat at chak changa constt. Of platform near well at chak changa and constt of cremation shed at chak changa Pyt. Pansar Block Marheen PRI
Construction of 2 No 10000 Gln GSR/Sump Tank 3 No 20000 Gln GSR, 2 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Patrara (JJM).
Construction of 7 No 10000 Gln GSR/Sump Tank 1 No 5000 Gln GSR, 2 No Pump Room and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Laroka (JJM).
Construction of Boundary Wall and sitting steps with other allied works at Shamshan Ghat Fatehpur Shekian Flora R.S.Pura (Plinth works only) (Under PRI Component District Capex Budget 2021-22) (2nd Call)
Construction of 7 No 10000 Gln GSR/Sump Tank, 5 No 5000 Gln GSR, 2 No Pump Room and 360mtr Boundary Wall, Rising Main and Distribution system under WSS Lam (JJM).
Constt. Of drain and boundary wall of peer Baba ward no.5 Gandu Chak Pyt Parladpur Mandal Phallian District Jammu under District Capex Budget (PRI) Plan for the year 2025-26
REPAIR/MAINT TO BOUNDARY WALL, PLASTERING AND MISC B R ITEMS FOR OTM AND MD ACCN AT SUB AREA AND ADJOINING AREA UNDER AGE B/R-I OF GE (N) UDHAMPUR
Construction of 3 No 10000 Gln GSR/Sump Tank, 3 No 5000 Gln GSR, 2 No Pump Room and 360mtr Boundary Wall, Rising Main and Distribution system under WSS Langer (JJM).
Construction of Boundary wall and repair of Godown at Lalyal Nandwal Multipurpose Co-operative Society, Distrct Jammu, Panchayat Khandwal, Block Mandal Phallian under Scheme (capex Budget) for the year 2022 -23
PROVN OF HARDSTANDING NEAR COMD HOSP BOUNDARY WALL UNDER AGE B/R-II AND REPAIR / REPLACEMENT OF BER CEILING FAN, WALL FAN AND GEYSER AT VARIOUS LOCATION UNDER GE (NORTH) UDHAMPUR.
Const of collection Tank at Source Banganga 02 Nos Chowkidar Quarter at Filtration Plant 98 Nos Anchor Blocks at Places and Boundary Wall under WSS Revamping of filtration plant at Katra
Construction of 5 No 10000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR 1 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Kampla (JJM).
Construction of Boundary Wall and sitting steps with other allied works at Shamshan Ghat Fatehpur Shekian Flora R.S.Pura (Plinth works only) (Under PRI Component District Capex Budget 2021-22) (3rd Call)
Construction of 6 No 10000 Gln GSR/Sump Tank, 2 No 5000 Gln GSR, 1 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Kalsian (JJM).
Construction of Boundary wall and filling, Play Ground at Lahori Chak ward no. 6 Pyt. Rathua Block Marh District Jammu under Scheme District Capex Budget DDC for Financial Year 2026-27
Construction of 3 No 10000 Gln GSR/Sump Tank, 3 No 5000 Gln GSR, 2 No Pump Room and 360mtr Boundary Wall, Rising Main and Distribution system under WSS Langer (JJM).
Construction of 7 No 10000 Gln GSR/Sump Tank 1 No 5000 Gln GSR, 2 No Pump Room and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Laroka (JJM).
Construction of 7 No 10000 Gln GSR/Sump Tank, 5 No 5000 Gln GSR, 2 No Pump Room and 360mtr Boundary Wall, Rising Main and Distribution system under WSS Lam (JJM).
Construction of 5 No 10000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR 1 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Kampla (JJM).
Construction of Boundary wall of Shamshanghat Mohalla from front side alongwith nallah at mohalla Padha at Diani Pyt. Diani Block Samba District Samba Under Scheme PRI for the year 2023-24
Improvement/Construction of Paloura Nallah in BSF Premises Paloura from Khajuria Mohalla BSF boundary wall to drainage siphon near Shamshan Ghat Paloura. Contract No SDJ/W/13/ 2022-23 (3rd Call)
Balance work for construction of New Type Primary Health centre Building at Panjnara including approach road, Boundary wall, Main Gate, Protection wall and providing and laying 80mm thick enter locking Tiles
REPAIR AND REPLACEMENT OF BOUNDARY WALL, DRAINAGE, SECURITY WALL AND HARDSTANDING OF 5071 ASC BN AND ADJOINING AREA OF JNE MD ACCN UNDER AGE B/R-II OF GE NORTH UDHAMPUR
CA NO GES U 23 2023 24 REPAIR TO BOUNDARY WALL DRAIN PATH CLEANING OF SEWAGE LINE AND OTHER MISC WORK AT HQNC COMPLEX UNDER AGE BR II GE SOUTH UDHAMPUR
Construction of Boundary wall/Gate and other allied works at Panchayat Ghar Ranjan Lower Panchayat Ranjan Lower Block Mathwar U/Head PRI CAPEX Budget for the year 2026-27. (PYT LEVEL)
C/o Boundary wall at Vanaushadhi Vatika, Chamba, New Tehri, Uttarakhand. (SH : Providing the services of computer operator and security services in the office of Executive Engineer-Garhwal, CPWD, Srinagar (Garhwal).
Construction of Boundary Wall of Ziyarat Sharief Khangah Pir Sain Baba Ward No.7 Pyt. Badder Pyt Badder Block Mahore Distt. Reasi under the Scheme PRI For the year 2026-27
REPAIR TO COMPOUND WALL, FOOTPATH, HARDSTANDING, INTERLOCKING, KERBSTONE ETC AND OTHER MISC WORK IN OTM, TECHNICAL AREA, NO.2 AREA AND SUPPLY OF RRS MATERIALS UNDER GE (AF) SRINAGAR.
REPAIRS TO LEAKAGE/ SEEPAGE ALONGWITH PERIODICAL SERVICES TO MD ACCN AT BHIM LINE AND CONVOY GROUND AND REPAIR TO DRAIN AND COMPOUND WALL IN ZONE I UNDER GE SAMBA
REPAIRS AND CLEANING OF SEWAGE LINES, REPAIRS TO DRAIN, COMPOUND WALL, FENCING, GATE, HARD STANDING AT MINNIEBAY AND SRINAGAR COLONY UNDER AGE B/R No II AT GE MINNIEBAY, PORT BLAIR(8815/E8)
Construction of 3 No 20000 Gln GSR ,2 Nos Pump Room, 02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Rani Badetar (JJM).
Repair of School building at PS Bhatta by way of Repair of CGI Sheets, Roof Ceiling including Paint of Building and Constt. of Compound Wall Pyt Paryote B Block Khellani (PRIs Grant)
Construction of compound wall and allied work at pyt ghar gajansoo pyt gajansoo Block MARH Distt Jammu Under the head of PRI CAPEX BUDGET for the year of 2024-25. (2nd Call)
CONSTRUCTION OF COMPOUND WALL AND ALIED WORK OF SHAMSHAN GHAT AT UPPER MATTOO W.NO. 2 IN PANCHAYAT MATTOO, BLOCK KHOUR UNDER THE SCHEME CAPEX BUDGET (PRI PLAN) FOR THE YEAR 2023-24
Additional works at Forest Resource Management Centre ICT Narwal, Jammu by way of Providing and Fixing of Aluminium partitions, Wire gauge shutters, Re-construction/ Repair of compound wall and other allied works.
Constt. of Culvert NHO Mohan lal w.no.4 and compound wall near Graveyard w.no.5 pyt Bhalwal Upper B Block Bhalwal scheme PRI Grants Distt. Capex Budget for the year 2023-24
Construction of GSRs 5000 Glns Three Number, 10000 Glns Three Number ,Pump Room one Number including compound wall, entrance gate, pipe network for Water supply scheme Kasab of Village Ari under JJM
Construction of GSRs 5000Glns (Two Numbers), 10000 Glns(One Number),Pump Room(Two Number), 20000Glns (One Number),including compound wall, entrance gate, pipe network for Water supply scheme Jugal Bhatidhar under JJM
Construction of Compound wall, repairing of bathrooms, tile work and shifting of gate near Shiv Temple at Panchayat Gigerial W.No.1 Block Khour district Jammu under CDF for the year 2025-26.
COMPREHENSIVE REPAIRS TO COMPOUND WALL, GATE AND GATE PILLARS, PATHWAYS, FENCING AND OTHER MISC WKS AT JCO/OR MD ACCN AND DEFENCE COLONY MD ACCN UNDER AGE B/R-I GE SATWARI
Construction of Balance Work of Primary Health Centre Bharath. By way of Truss work, Finishing works, steel gate, compound wall, septic tank, soakage pit, overhead tank and Sump tank (2nd time tender)
REPAIR TO RETAINING WALL FOOTPATH CULVERTS FENCING GATE AND COMPOUND WALL WITH DRAIN IN COE HQ CE 31 ZONE 216 TC AND R CENTER UNDER AGE BR III AT BB CANTT SRINAGAR