Loading…
Loading…
1,786 results • Best match
Repairing of Damaged Road Kalindi Kunj Park to Rait Ka Tila from Km.0.000 to Km. 0.500 on Right Afflux Bund in U/S of Okhla Barrage in Delhi State.
Repairing of Damaged Road Kalindi Kunj Park to Rait Ka Tila from Km. 1.360 to Km. 1.800 on Right Afflux Bund in U/S of Okhla Barrage in Delhi State.
Repairing of Damaged Road Kalindi Kunj Park to Rait Ka Tila from Km. 1.000 to Km. 1.350 on Right Afflux Bund in U/S of Okhla Barrage in Delhi State.
Repairing of floor of Divide wall of Harewali Barrage.
Painting work on the superstructure of Ramganga Barrage, Harevali
Construction of Control Room at Rapti Barrage, Distt.-Shrawasti
Manufacturing /fabrication of under sluice gate of Rohin Barrage
Auction of boulder sized debris of damaged bridge/barrage.
Work No - 25 Installation of phyto beds and check dams for phyto remediation kadrabad drain
Construction of check dam Kusungur Checkdam Vill- Kusungur Block - Bahariya District - Prayagraj
Fabrication and Erection of Steel shed of Bhaurat Dam as per drawing
Construction of check dam Katiyahi Checkdam Vill- Katiyahi Block - Bahariya District - Prayagraj
Construction of check dam Paigambarpur Checkdam Vill- Paigambarpur Block - Bahariya District - Prayagraj
Construction of Anicut Near Dharmendra Patel ke khet ke pass
Construction of Anicut Near Jokhan ke khet on Devpura nala
Construction of Sesa check dam at villege Sesa , manjhanpur, kaushambi
CONSTRUCTION OF CHECK DAM IN VILLAGE virpur BLOCK marhara ETAH
Restoration of C.C. block, pervious floor and launching apron between barrage gate no 17 to 22 in downstream of okhla barrage in delhi state
Manufacturing / casting and providing roller of shutter assembly for Narora barrage
Supply, Installation, Testing, Commissioning, Training, Maintenance, Electrification and Automation with SCADA System Including Renovation and Furnishing of existing Barrage Control Room at Adwa Barrage, Mirzapur, Uttar Pradesh
Painting of old rusted steel surface of gates Up stream side and appurtenances of kachnauda Dam.
Replacing of brake lever mechanism, Plummer Block and winch machine cover on Ohan Dam Distt-Chitrakoot.
Repairing of winch Machine,guide pulley assembly and Installing new Main Roller Assembly,power Generator at Guntanala Dam, Chitrakoot
Epoxy painting after sand blasting of stoplog gate at Pahadi Dam in District Jhansi .
Construction of Fadilabad IInd check dam at village Fadilabad, Block Mooratganj, Distt.-Kaushambi
Painting of Superstructure and Chequered plate at Maudaha Dam located in district Hamirpur.
Construction of check dam Fadilabad-ii at village Bathui , Block Muratganj, Dist. Kaushambi.
Construction of check dam Bhadehri-i at village Bhadehri , Block Kada, Dist. Kaushambi.
Bed and Berm scrapping and Jungle Clearance of Pathrai Left Main Canal From KM. 0.000 to 9.400 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance work of Left Main Canal From KM. 0.000 to 9.400 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance work of Ghat Rajwara Minor From KM. 0.000 to 4.000 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance of Pathrai Right Main Canal From KM. 0.000 to 7.650 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance work of Chadraudhwari Main Canal From KM. 0.000 to 2.200 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance work of Ghat Rajwara Minor From KM. 0.000 to 4.000 at Pathrai Dam
Bed and Berm scrapping and Jungle Clearance work of Right Main Canal From KM. 0.000 to 15.400 at Pathrai Dam
Construction of check dam at village Chheetpur Lakhni , Block- Holagarh Distt.-Prayagraj
Rehabilitation and Improvement of JIRGO Dam (Mechanical Works) Under DRIP-II in Mirzapur District of Uttar Pradesh.
EPOXY PAINTING AFTER SAND BLASTING OF HYDROMECHANICAL EQUIPMENT OF GATES (DAWN STREAM) AT KACHNAUDHA DAM DISTRICT LALITPUR
Renovation construction of Arjun Dam Top Road in 2.565 Km. Length in Between Km 0.000 to 5.200
Rehabilitation and Improvement of Baghelkhand Dam by Replacing Head Regulator at Vishrampur and Sitlapur Under DRIP-II(Mechanical Work) in Balrampur District of Uttar Pradesh.
supplying and fixing of cable tray at Bhimgoda barrage , Haridwar
REPLACING STEEL WIRE ROPE OF GATES OF AFZALGARH BARRAGE, KALAGARH
Painting of super structure at Duni Barrage AND D.B. Feeder
Renewal work of Mandhana Ganga Barrage Shuklaganj Purva Mohanlalganj road
RENEWAL WORK OF SERVICE ROAD ON BARRAGE SITUATED AT KMC
(LOT-1) Painting work of hydromechanical equipment at Banbasa barrage.
Railing around control cabin and fountain of Ramganga Barrage Harewali
Repair work of rope pulley installed at Kho Barrage Sherkot.
Work of installing the central electrical panel at Bhimgoda Barrage
REPLACEMENT OF CABLE TRAY AND CABLE AT HINDON BARRAGE, GHAZIABAD