Loading…
Loading…
8,324 results • Best match
Restoration of path cum drain in Brahampuri Mohalla form House of Kapil towards puli Tihra Raoad Ph-II Ward No8
Pand L of Paver Tile along with drain from Shop of Kappo to Billa (Ajeet) house in ward no. 9
Construction of side drain from 103 Tunnel to Nabha RD 0 0 to 0 500 mtr in ward No 11
C/o Drain from h/o Virender Sharma to h/o Sh. Om Parkash in ward No. 7 Phase-II
Construction of RCC water channel drain and laying of GI pipline-150 mm dia at North Campus of IIT Mandi
CO V shape Drain and Steel Railing from BM Motors to Chawan Niwas in ward No 28 at Chhotta Shimla
P and L of paver tiles from H/O Trilok Chand to Main Chowk along with drain Ward No. 6
ReConstruction of Slab over the drain in govind Nagar from bharat medical store to Sh. Ramesh Seth House, MC Una.
Construction of U-Shape drain and Providing and laying Cement Concrete Pavement)
C/O Retaining walls, Breast walls and Cross Drainage works.
SH Clerance of Drains and maintenance of berms from 7/00 to 13/00
Repairs/erection/re- erection of retaining walls, drains and similar nature works with RCC
Hiring of JCB/Excavator for removal of slip, clearance of drains and shoulders etc.
Providing and fixing of sinks, drainage works, concrete platforms, Aluminium shutters for shelves and roller blinds in Geotechnical lab (A11.02.16 and A11.02.17) in A-11 building and P/F of Aluminum window in A11-02-26 room at North Campus of IIT
Job 5 Construction of link road to Harijan basti Malahat RD.0-0 to 2-200 Sub Head Providing and Laying 80mm thick interlocking paver block, pavement with 300mm dia plastic pipe for drainage RD.2-010 to 2-130 Under SCCP
Repair and Restoration of Rain Damages on link road Gagret Daulatpur road to Adarsh Colony Mohalla Lohara Kumharan Trali and Mohalla Gugga Panga in village Mawa Kohlan Km 000 to 2600 SH PL 300mm dia RCC Hume pipe with chamber for drainage of
A/R and M/O to GPRA at Longwood, Shimla during 2024-25. SH: Urgent repair of existing damaged fencing, repair of existing water supply and drainage line, finishing work including carrying out related repair items near CGO Complex Longwood Shimla (H.P.).
A/R and M/O GPRA, CPWD Colony at Prospect Hill, Summer Hill and Boileauganj under RP Niwas section Shimla (H.P.) during 2024-25. SH: Repair of existing ground area, drainage & M.S. grating in GPRA Colony Summer Hill under R.P. Niwas section Shimla.
C/O PCC Retaining wall at km 0/250 to 0/265
(SH- C/O R/wall at RD 1/230 to 1/250)
Preparation of sub grade, P/L GSB, WMM andP/L 30mm thick Bituminous concrete in approaches at RD 3/820 to 3/885, 3/893 to 4/300) ( Under SCSP
SH C o dredging works at various RDs RD 0 to 225 Mtrs Chinab River Phase I Job No I.
(SH- C/O R/wall at RD 3/860 to 3/880 and B/wall at RD 5/120 to 5/145)
CO RCC Sedimentation Tank 50K Ltr. Capacity,CO 3 Nos RCC Filter bed 120.57 Sqm 40.19 Sqm each CO RCC main storage tank dome type 150000 Ltr. Capacity, Providing Site Development, RWall and Fencing Around Water Treatment Plant
C/O PCC R/wall at RDD 3/680 to 3/694.70
SH Providing and placing of filter media and removal of slips
SH- Formation cutting and providing wire crate for dumping sites at Rd 0-300 to 0-320 and 0-090 to 1-110
C/O extension of slab culvert at RD 2/750, 3/330 , 5/615
C/O PCC R/wall at RD 0/165 to 0/188 and 0/265 to 0/270
C/O PCC R/Wall at Rd 2/700 to 2/175
ROFD between km 0/405 to 0/570) under PDNA 2023
(SH-C/O R/wall at RD 6/0 to 6/120 1 4 8 road surface)
C/O PCC R/Wall at Rd 0/512 to 0/524
Providing and fixing tile work, wood work, sanitary fitting, Distempering and painting etc
C/O PCC R/Wall at Rd 0/340 to0/350
Providing and laying 30 mm bituminous concrete including profile correction in K.M. 3/00 to 6/00
Construction of RCC weir and other allied structure
C/o 6.00 mtrs. Span R.C.C. Slab type culvert at RD. 0/155) Under Nabard)
SH C O B Wall at Rd. 4. 870 to 4.930
Providing and laying bituminous concrete in km 0/0 to 2/800) subsititution
(SH-C/O protection R/wall for bus stand at Kalgaon at RD 5/617 to 5/629 , 5/675 to 5/687 wing wall of culvert at RD 4/865)
(SH-C/O protection R/wall for bus stand at Kalgaon at RD 5/629 to 5/650.50)
C/O PCC Retaining Wall at Rd 1/200 to 1/220 1/700 to 1/720 and 3/740 to 3/755
SH Laying, Jointing and Testing HDPE pipe of 110 mm dia, Ptra cutting, R Wall, Crate work, Desilting Tank and CC Lining Job I
(SH-Providing renewal coat at R.D. 2/00 to 5/00 Providing and applying 2.5mm thick road marking strips (retro-reflective) (under PMGSY)
C/O 6.00 mtr. Span R.C.C slab culvert at RD 0/120
SH.CO approaches and wing wall)
(SH-C/O R/wall at RD 0/320 to 0/350 B/wall at RD 0/335 to 0/3656)
SH Widening of narrow reaches at Rd. 4.300 to 4.825 and 5.450 to 5.670
SH C O R.Wall at RD 0.360 to 0.690, 0.745 and 0.9.025 to 0.930