Loading…
Loading…
11,152 results • Best match
Providing PMC Services including Supervision, Quality control for Improvements to Roads, Drains and Asphalting works at JP Nagar Sub division, Jayanagar Division (G.O Order No UDD 474 MNY 2025(E), Bengaluru, Dated 03.11.2025)GO (Annexure5) Sl.No.04,05,06)
Comprehensive Development Works For Construction Of Drains And Culverts In Balance Portion Of Banashankari 6th Stage 7th Block from link Road to CA-1 (Area proposed land for Bescom) Upto park-1 Surrounding Area Of BDA Layout.
Construction of Balance RCC Drains & Road Works in Banashankari 6th Stage 3rd Block, 4th Block, 5th Block, 11th Block & Further Extension of Banashankari 6th Stage 4th H-B-T Blocks of BDA Layout in Bengaluru South Taluk
Improvements to road and drains at Yadalamnagar Colony, Vasanthapura Colony (Block 27/2), Bhuvaneshwari Nagar Colony, Vaddarapalya Colony, Srinivasa Colony, Uttarahalli Colony and Chikkallasandra Colony in SC/ST Beneficiary area and Connecting road in Uttarahalli Sub Division.
Improvement of Road and RCC Drain from Bajaj showroom to Govt PU college, Hiremath Forest house to renuka dhaba, Construction of Drain and road improvement near Basavaraj Yeli and vishvnath Lawyer house all cross roads in Kumreshwar nagar and ... RCC Drain and ... RCC drain and ...
Construction of retaining wall near Hanuman temple at Lingampalli, Improvements of road from Nala retaining wall to Bargal road at Lingampalli, Improvements of road from Rajola K road to Mudhol Hanadi, Constn of CC road at Gopanpalli, Impr of road ... near nala at ...
Comprehensive Development works to roads, drains, footpath, Repairs to Building and construction of culverts, Development of Bethany ground and B Mona and other Parks and Play grounds in BTM Layout Constituency and Improvements of drains in VGS Layout ST Bed, Ashwini Layout, 7th Block Koramanagala, Grape Garden, Nadugudde, Srinivagilu, Venkatapura, Jakkasandra, HSR 5th Sector, Teacher Colony and Resurfacing to 7th cross Ejipura Main road, and other Improvement works in Surrounding areas of Adugodi, BTM Layout and Koramanagala Sub Division in BTM Layout Constituency (No. of 7 Works) Package No 07
Package no.05 (1) Construction of Pipe drain, Chamber and covering slabs from Magamanamma house to Bavikatte Maramma temple at ward no.09 (2) Pipe drain in Bazar road at ward no.09 (3) Construction of CC road, pipe drain and chambers in Bramhanara ... pipe drain in ... pipe drain from ...
Cons of cc road and drain at Imadapur, Cons of cc rd and drain from Kumbar ashok house to water tank at Gopanpalli, Impro to rd from Javarnagar toll gate rd towards Madari rd at Javarnagar, Cons of rd from Rudrawar hala to sanna hanadi at Jakanpalli, ... and drain at ... and drain from ... and drain at
Construction of concrete road and rainwater drain near Gangappa house and Appayanna house in Neeleri village and installation of covering slab on the drain in ward no.10 Under TMC Devanahalli limits
Construction of RCC Drain by providing RCC NP3 pipe at Backside of R K hospital and Construction of RCC Drain near Retd teacher Ramchandrappa house at Ward No 02 in Devadurga Town
Construction of CD and drain near Islampur street gate and installation of slab on existing drain from Mustur munirsab house to Mirasab ukkund house in ward no 21 In RNR CMC Limit.
Constriction of drain at Ward No. 30 Vijayanagar 8th Cross CC Road Repair, Drain Covering Slab and Convency Joining Third Road of Devanur Layout, Vijayanagar 4th Cross in Tumkur city Corporation Limits
Construction of RCC Drain at SC Colony from Rajesh house to Anekal Main Road,Repairs to Drain from Chikka munireddy house to Kashappa house,Iggaluru village,Ward No 23,TMC Chandapura Limit
Construction of CC drain at the back of Karnataka Public School Government SB Horatti School and CC diversion drain of Government Boys Hostel in Yadahalli village of Mudhol taluk of Bagalkot district
Construction of CC Drain at Near Talavar Duggatti Chandrappa House in Kamalapura Village and Construction of CC Drain & Deck at Nagasanahalli Mallammana House to Nagasanahalli Sunkammana House in Lakkashettyhalli Village Harihara Taluk
Package-2 Construction of CC Road at Ward no.04, 06, 13, 19 and RCC Drain in Ward no 04 and Drain Covering Slab at Ward no 11 in CMC Chikkaballapur limits
Construction of CC Drain and 2 deck slab in at ward no 13 right and left side of munvar baig house and construction of cc drain and deck slab near hanumanthappa house
Construction of CC Road & Drain in Ward No.10 1)From Harjenahalli Rashid House to Muniraju House & In Ward No. 11 Purahalli Tokalagatta Main Road to RO Plant 2)Drain in Perjenahalli
cc drain at ward no 06 from om shanti building to sh road continued work and cc drain at khaleel house and construction of Arch at ward no 5 rajkumar layout cemetery
Improvements to Road and Drain Work
Cement Concrete Road and Reinforced Cement Concrete Drain
Construction of compound wall at south side and providing fencing with chain link on compound wall in SWM site ,Construction of drain and cc to newly constructed godam in SWM site
A) Construction of drain and installation of covering slab in front of Mauktikamba Temple in Ward No. 08 and installation of HDPE pipeline to provide water connection to main lines from borewell in Southegowdanahalli in Ward No. 21 and laying of soil (muram) on the road leading to borewell in Batamma Temple in Ward No. 23. Under TMC Devanahalli limits B) Supply of panel board, outdoor box, UG cable, pump motor and other necessary items in Ward No. 09 & 12
Construction of RCC drains in front of Plot Nos. 122A to 126 (both sides, and 63A, 74A, 47, 46 and 134) and road asphalting work in front of Plot Nos. 58B to 61 in Main Market Yard Naragunda
Improvements of UGD and RCC Drain at Burud Galli in Ward No.19 Belagavi
Improvements Of CC Road And Drain At Gandhanahalli village In K R Nagara Taluk
Development of Road and Drain
Construction of CC Road Drain
RCC Drain and Culvert Work
Wall to Wall Grading in Operational Area including the Construction of RCC drain on both sides of the basic strip of Runway at Kalaburagi Airport
RESERVED FOR ST CONSTRUCTION OF CC DRAIN AT WARD NO 06 SANADIYAVAR HOUSE
CLEANING OF SEWAGE LINE, MANHOLES AND SEPTIC TANKS AND MISC REPAIRS TO UPKEEP THE HYGIENIC CONDITIONS, AREA DRAINAGE, FOOTPATH, PLINTH PROTECTION, FENCING UNDER AFSOD/13 PARA SF AREA UNDER GE (NORTH) BANGALORE
PROVN OF AUGMENTATION OF DRAINAGE FACILITY FOR KLP PH I AT ADMC BATHING POINT NEAR P 46 AND HARD STANDING IN FRONT OF T 7 AT TB III UNDER GE NORTH BANGALORE
Providing and fixing new Electrical Starters and cabals for Sluice and Spillway gates and Providing and fixing HDPE pipes for pumps at Drainage Gallery of Hidkal Dam for the year 2025-26
Plumbing Work ,Drainage Repair (PUC Pipe ) (300L) And Electrical Repairs To Bcm Post Metric Boys Hostel At Devadurga Town (HIC 2719) In Devadurga Tq Of Raichur Dist. (RESERVED FOR CAT-II A)
Under Ground Drainage (UGD) at ward no 34 ambedkar kalyana mantapa beside road and siddeshwara Krupa to Aparna Nilaya, Rathnamma house to society, sharadamma house to Advacate nagabhushan house in Chitradurga city
BLRYRURAL PKG IV 1.Construction of CC Road and UnderGround and Open Drainage in Rupanagudi VIllage 2.Construction of CC Road in Yetthinabhudihal village in Ballari Taluk and Dist (Reserved for ST)
REPAIR TO SHED WITH IRON WORK DRAINAGE SYSTEM WITH MS GRILLS SECURITY WALL FENCING AND CERTAIN MISC ITEMS AT LRDE CAIR AND MES PREMISES UNDER GE I R AND D WEST BENGALURU
ROUTINE PREVENTIVE AND CORRECTIVE MAINTENANCE OF SEWAGE SYSTEM CLEANING OF SEPTIC TANKS SOAKAGE WELL SEWAGE DRAINAGE PERIODICALLY AND REPAIRS TO FOOTPATH HARDSTANDING ETC AGE BRII FOR CABS CEMILAC AND STIR AT BANGALORE
PROVISION OF 06 ATTACHED TOILETS TRAINING SHED TO PNR CORPS DRAINAGE TO T 38 CYCLE SHED TO T 58 59 AND SPECIAL REPAIRS TO BLDG NO T 44 UNDER GE NORTH BANGALORE
PROVISION OF AREA DRAINAGE AT CDO TRG AREA OF HQ JL WING AND AT CERTAIN OTHER PLACES AND REPLACEMENT OF OLD SEWAGE LINES OF HOSPITAL AREA OF MH BELGAUM UNDER GE BELGAUM
PROVISION OF DRAINAGE,PAVEMENT AT WT AREA AT MLIRC AND PROVN OF HARD STANDING NEAR BLGD NO 3 AT CDO WING OF JUNIOR LEADERS WING, THE INFANTRY SCHOOL, BELAGAVI UNDER GE BELGAUM.
Construction of CC road/drainage from B.T. Yallappa house to Kori Sanna Hussainappa house in Agasanur village in Siruguppa taluk Ballari dist. under 2515-KKRDB Micro projects for the year 2025-26
Renovation works of National Institute of Unani Medicine (NIUM) campus, Bengalulru. SH: 1) Recification /repair of drainage line in Hospital block. SH: 2) Providing open shed to park vechiles in Boys hostel.
Concreting of road required for drainage network in kinnimulki wetwell area and Reconcreting of old broken brick chamber near main road kinnimulki manjunatha garage and veerabhadra kala bhavan in Udupi cmc limit
Maintenance of 6 Nos of Generators, Substation, lighting system of Spillway, Street lights on dam top, LBED, RBED, Dyke, Highmast lights, drainage gallery, and electrical section of Narayanpur Dam for two years
Repairs to Slab, Drainage toilet & Window and Door to PHC at Chikbevanur Village in Indi Taluka of Vijayapur District. (H/Ac 2210-00-101-0-36 Health department Building Maintenance 2025-26)
Repair of the Roof, Drainage, Toilet, Plumbing Work and Painting of the Primary Health Center at Halasangi Village in Chadachan Taluk of Vijayapur District (H A/c 2210-00-101-0-36)
Installation of new pipes in the internal drainage pipeline from Rahim Kaka house of Ward No. 12 to channel and construction of manholes where necessary and installation of pipe line cmc ckm