Loading…
Loading…
10,015 results • Best match
P/L Drain and interlocking Paver in near laxicanschool,house no.26 ,house no, 27 ,front of uniform store of Shivalik city street ward no 17
P/f interlocking tiles and Const. of drain and Road gulleys from Yashpals House to Mewa Singhs house and two small adjoining streets in Bathindian mohalla
Repair Relaying of old interlock tiles C.C Flooring , Road gullies cover frame Junglae drain Man Hole cover in Diff. Mohalla In Ward No 1 to 5
Repair Relaying of old interlock tiles C.C Flooring , Road gullies cover frame Junglae drain Man Hole cover in Diff. Mohalla In Ward No 11 to 15
Repair to open drain, steel gate, boundary wall and chain link fencing at certain unit and Md Accn under AGE B/R-III at GE Gurdaspur.
Clearance of booty (Water Hyacinths), weed (Carpet Grass, elephant Grass), jala, Sarkanda (TripidiumBangalense), silt, obstructions from the bed of Bareta Drain in between R.D. 28730-103300
P/l Interlockin tiles Const. of drain in at Street Main Gali two house of master Rajeev Bhagat Namdev Colony ward No.10, at NP Ajnala.
Providing Laying Interlocking Tiles of Road Gully Chamber of Raising MH/Road Gully Chamber of Pullies/Drain Other Development Ward no 01 to 08 MC Jaitu
Repair and Construction of street near H/O Gurpuran Singh in front of H/o Raghubir and different of street Drain in ward No. 8 Mukerian
DNIT FOR CONSTRUCTION OF 10 MTR RCC BRIDGE ON LINK ROAD GOPALPUR TO DELHLON ROAD AT RANGIAN DRAIN (RD 21500) MC KILARAIPUR DISTRICT LUDHIANA. LDH2024-045
P/f interlocking tiles and const. of drain from house of Chohan sahib to gate of Charanjit Singh resi upto end of gali word no. 11
Construction of 6 M span culvert over season drain crossing Bahadugarh-Ghanour road to Ghanour via Chappar, Manjoli in KM no. 4.00 (ODR-37) distt. Patiala.
Reconstructing the damaged part of overhead box drain for sewer crossing at N-Choe at Sector dividing road Sector 81/82 near village Chilla, SAS Nagar
Estimate for Raising and strengthening of Right Side Bank from RD 164000-168000 to save abadies and field of Abulkhurana Drain in village Gurusar, Sham Khera
Removal of weed growth, shurbs, jungle, bushes etc. from slopes, dowels, embankments of SNHC and clearance of weed, jalla, silts etc. from side drain along SNHC.
Removal of weed growth, shurbs, jungle, bushes etc. from slopes, dowels, embankments of SNHC and clearance of weed, jalla, silts etc. from side drain along SNHC.
Repair of Flooring ,drain ,p.v.c pipe road gully chember and R.c.c. Pully in Various sites in ward no. 1 to 7 in N P Lohian khas
Construction Of street H/O Surjit to H/O Nitish Kumar near Bhatha Drain slab H/O Shadi lal to H/O Babu ward no-1
SEWAGE AND DRAIN CLEANING AND REPAIR TO SEWAGE LINE MANHOLES AND ALLIED SERVICES TO MD ACCN UNDER AGE B/R-II OF GE (E) JALANDHAR CANTT
Const of Drain and I/L Paver Block Jakhepal Road Firni to Street Manjit Singh and street Jeet Singh s/o Sadhu Singh Ward No. 7
Repair of Flooring ,drain ,p.v.c pipe road gully chember and R.c.c. Pully in Various sites in ward no. 8 to 13 in N P Lohian khas
Repair/Reconst. of street and drain Near H/o Darshan Singh and H/o Tara Singh to H/o Teja Singh in Ward No.3, Khamano.
Repair/Construction of CC Flooring , Construction of RCC Slab, Repair/ P/F of I/T and Drain of Different Area of W. No. 1 to 5
Laying I/L Tile, CC and Drain Type-II, Road Gully Chamber Govt. Boys School to H/o Chajju Singh Chakki , Jatinder Puri, Ward No. 3
Repair Relaying of old interlock tiles C.C Flooring , Road gullies cover frame Junglae drain Man Hole cover in Diff. Mohalla In Ward No 6 to 10
SPECIAL REPAIR OF DRAIN WITH RCC COVER ALONG THE ROAD NEAR SHORT RANGE OF 102 INF BN (TA) PUNJAB AT MIL STN KALKA UNDER GE JUTOGH
Rough Cost estimate of Cleaning and Desilting of Jacob drain from Kale Mooh di Bagichi to Sullar Pully. Est Cost Rs. 21.02 lacs dt 11/12.05.2026
Repair to open drain, steel gate boundary wall, path and chain link fencing and maint of runway at certain unit and Md Accn under GE Gurdaspur.
CERTAIN REPAIRS TO FENCING, COMPOUND WALL, DRAIN, CULVERTS HARDSTANDING AND PATHWAY IN B-1 AND B-3 AREA OF AGE BR-II UNDER (WEST) JALANDHAR CANTT
SEWAGE AND DRAIN CLEANING AND REPAIR TO SEWAGE LINE MANHOLES AND ALLIED SERVICES FOR MD ACCN UNDER AGE B/R-II OF GE (EAST) JALANDHAR CANTT
Const. of drain type 2 starting from H/o Raman to H/o Shinda and H/o Lal to H/o Balle Balle in W.no-2
Clearance of weed, Jala, Sarkanda booti , Obstructions etc from the bed of wet Kotli Budhobarkat Drain in Between RD 0-19000 in Teh. Dasuya, Distt Hoshiarpur
Work of Repair of Leakage in Washrooms ducts dismantling providing and fixing of balance gratings over basement drain of Purab Premium Apartments Sector 88 SAS Nagar
Providing/Laying I/L Tiles and Const. of Drain Type-1 Street H/o Sushil Kumar, Veenugopal and Chowk Kala Ram SDM Ward No 10 Sunam
REPAIR OF CONSTRUCTION P/L INTERLOCKING TILES, DRAIN TYPE 1 AND 2, CULVERTS ETC, AT VARIOUS PLACES IN THE STREET OF WARD NO.1 AND 2
Providing and laying Interlocking Tiles and 60mm Road Gully chamber in Street Raju Singh, Lovely Kumar and Rada Sumami street Drain closed Ward No 17 Barnala
Rough Cost for Providing and Laying Strom Sewer From Sukhram Colony Gali No. 5 to Bana Road Drain. Est cost Rs. 47.81 lacs dt 25/26.05.2026
Bracket for Wash Basin drain pipe holder to UBLS/SWR/C&W Drg. No. A3-236, Alt-1. Item No.1 to 5 in assembled condition.
Providing Laying CC and Construction of Side Drain on Link Road NANGAL GHIALA GURAH MIRTHAL ROAD Assembly Constituency MC and Distt. Pathankot Rangla Punjab Vikas Scheme
Cleaning, Sanitation and Disinfection Service - Outcome Based - VEGETATION AND DRAINAGE CLEARANCE SERVICES; Vegetation Cutting; Outdoor
As per tender documents
Repair of the street attle wale in front of Jagga Nambardar
ADRAMAN-2 Cluster-38
Constructing 20 Nos. RCC Structure in the area of village Chak Sukkar and Gubhaya.
Constructing E.C. Bags and Stone Crated Revetment along with Studs to save agricultural land and border fencing from floods in the area of BOP Joginder Complex.
Construction Stone Crated Reclamation Spur at RD 92500 of Advance Bandh RD 0-20200 U/S Harike Head Works.
Constructing 35 Nos. RCC Structure in the area of Village R. S. Bodla.
BASSINA/KAMALKE Cluster-39
Constructing 2 No. Stone Crated Studs in between RD 7200-7500 of Advance Bandh RD 0-20200 U/s Harike Head Works.
Constructing Series of E.C. Bags Studs with Revetment on U/S of existing EC Bags revetment to check erosion of berm and further advancement of loop formation between RD 43000-46000 of Gidder Pindi Bandh of River Satluj.