Loading…
Loading…
4,826 results • Best match
Complete repairing and rewinding of Delco Remy 6 pole self starter 50MT 24 V and alternator 140 Amps presto lite 24V and circuit rep Head and light with wiring changing of machine CK300 B0735 Hydraulic Shovel at DOCP Kusunda Area
Repairing/replacement of Digital Make supply card, CPU card, Display Card J/B card with unction box load cells, Jummbo Display, Mounting Sets and GI Flexible Conduit pipe wiring for Karipani 50T capacity Electronic Road Weigh Bridge installed at SDOC
Complete repairing and overhauling with wiring of 11KV HT OCB, GEC Make, 400AMP, KAD type, SL.No. M-2422 for controlling main power supply to 1000 KVA transformer installed at 35 No Pump House Substation of Bhimkanali Township under Block-II Area
Providing 16 A Switch Board with Service Wire connection at Guard Room of P.O. Office, changing weak insulation Service Wire of D.D. Mines Substation, Pit Office, P.O. Office, and repair of Internal Electric Wiring of Water Supply Section, w.r.t. Bok
Repairing of electrical wiring and damage service wire in qtr.No C-13 at Kalyani colony occupied by Sri karunay Anand MT(Excv) Qtr.No old staff quarter Kalyani allotted by Rashtriya Koyla Mazdoor Union office Kalyani and qtr.No 29 old staff quarter
Automotive electrical wiring of 03 nos. BD355 Dozer, Sl. No. 11615, 11906 and 11644 and 02 nos. BD155 Dozer, Sl. No. 13285 and 13604. And Rep. of RHS lift cyl. and tilt cyl., engine and trans. guard, etc. of Dozer 11906.
REPAIR MAINT OF STREET LIGHTS HIGH MAST LIGHTS AND CONNECTED WORKS AT TECHNICAL AND PERIMETER AREA AND REPAIR REPLACEMENT INTERNAL WIRING INCL BUILDING LIGHTS PAINTING OF POLES PANEL AND EARTHING AND CONNECTED WORKS AT SAG PAKUR AT AF STN SINGARSI
Wiring and power supply arrangement in two shelter kept at checkpost 11 at Golitand and the new checkpost room built between the middle portion of Black top road Masilaung for installation of the RFID system with installation of two number hexagonal
Repairing of HT Pannel, HT Pannel Box with mounting replacement / repairing of complete wiring harness and corresponding electrical device of CK300 Shovel Sl No. E-173 and repairing of Bottom Dump Bucket assly(both Side) along with attachment of Bore
REPAIR REPLACEMENT OF SUNKEN FLOOR SINITARY FITTINGS TOILET WALL AND FLOORS DAMAGED ROOF INCL ROOF TREATMENT PERIMETER WALL AND ALLIED WORKS AT MH NAMKUM AND NAMKUM AND REPAIR OF DAMAGED MCCBS MCB DB SUBMAIN WIRING OH CONDUCTOR STREET LIGHT GATE LIGH
Electrical repairing or rewiring changing of electrical items for Urdu Middle School at Jhirkey under Kathara Colliery
Electrical repairing and rewiring of 12 Nos. Officer and Staff Quarters of CCWO Colony of Washery Division
Solar Inverter with Solar Panels, Batteries, Wiring and Installation
SOLAR INVERTER INCLUDING SOLAR PANELS, BATTERIES, WIRING AND ISTALLATION
Hiring of skilled electrician wiremen of day to day maintenance for electrical installation of Govt Buildings
Facility Management Services - LumpSum Based - Government Office; False Ceiling 20ft x 17ft with Wiring & Panel Lighting ( 340SqFt ); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum ... with Wiring & ...
wiring of a sub-assembly room repair section at excavation shed of base workshop , sub assembly room auto section at excavation shed of base workshop , sub assembly dozer section at excavation shed of base workshop d,LMV supervisor s room at EnM shed
Custom Bid for Services - Total Lumpsum Amount Including Gst For Supply, Installation, Testing And Commissioning Of Ni-Cd Battery Banks Less Buyback Amount For Ip-04 As Per Tender Document, Custom Bid for Services - Total Lumpsum Amount Including Gst ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations
Custom Bid for Services - BOQ item No 1 Semi Skilled Electrician per shift of 08 hours 1575 Shifts, Custom Bid for Services - BOQ item No 2 Un Skilled Helper per shift of 08 hours 1575 Shifts, Custom Bid for Services - BOQ item No 3 Supply only ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations Operation ... Systems/ Electrical Installations
Repairing, overhauling and Rewiring of 4 nos. RSK Panel 6.6KV, 300A for Moonidih main pump Room. Sl.No.7948,7952,7956,7957
Custom Bid for Services - Maintenance contract for Water Coolers, Air Conditioners and Refrigerators under Jaduguda Mill Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Operation and Maintenance Of Electrical ... Systems/ Electrical Installations
For Electrical wiring of 05 Nos Quarters at Zero Seam(i)Qtr.No.152 Ramadhar Kumhar P.No.63025772 (ii)Qtr.No.156 Shiv Shankar Beldar(iii)NHS 63(iv)Ram Kumar Singh Qtr.No.35(v) Shyam Sundar Singh Qtr.No.1162 at Zero Seam Tetulmari Colliery under SA
Construction of 480 nos. type-II G plus 3 storeyed, 24 nos. type- III G plus 3 storeyed, 12 nos. type - IV G plus 3 storeyed and 04 nos. type-V Duplex Quarters including Internal Water supply, sanitary Installation, Drainage and internal electrical installation...
(A) COMPLETE REWINDING and REPAIRING OF 15(FIFTEEN) NOS.CELLING FAN (AKWMC HOSPITAL-05 NOS.) 4 NOS.ATTENDANCE ROOM 02 NOS,09 NOS.ATTENDANCE ROOM -02 NOS.AKWMC OFFICE-06 NOS.) OF AKWMC WITH MATERIAL and LABOUR COST. (B) WIRING IN THE QTR. OF SRI RAJU
Maintenance of overhead line two source of power supply for weighbridge, 3 phase 4wire Ckt with SPD at ASP Colliery Deco camp to Road WeighBridge No 4 i.e. ASP Colliery Weigh Bridge and Lightning arrestor arrangement with Internal wiring and light fi
Providing and fixing of Jumbo display and G.I flexible conduit pipe wiring one time and repairing - painting of 1000No. 20 kg C.I Test weight for a period of three year for Kathara Colliery 60 Te. Electronic Road Weighbridge installed at Kathara Coll
Repairing and maintenance of Electrical Wiring and provision of lighting accessories in Qtr.No.D/15, D/06 in Sangam Vihar Colony and Qtr. No.43R in 1BR Colony Occupied by PO, Ashok OCP, SO(PnP) and Sri Pappu Kumar Supervisor (Telecom) respectively (2
Fresh wiring of new allotment qtr. No. B/01 in B/V colony of Sri Awdhesh Pandey and Sri Ashrifa Oranw M/Ftr. And qtr. No. MQ- 144 in B/V colony of Sri Uresh Lohar, M/Ftr. Under CHP/CPP, Piparwar
For electrical re-wiring of (01) Harendar Bhar Tandel Jamadar Qtr. No. 655, P.No.- 63019494, (02) Nirmala Devi, Qtr. No. L1027, (03) Mobin Akhtar Qtr. No.- 166, P. No.- 03033214, (04) Fulchand Kahar, Qtr. No.- 368, P.No.- 92980068, (05) Law Kumar Sin
Renovation of electrical wiring along with associated running work complete job of old control room including battery rooms (old and new) sub-division office store rooms (main and small) PLCC room compressor room DG Set room bathroom etc at 220/132 k
Repairing maintenance of electrical wiring of Barrack at Ashok Vihar Colony infront of Sangam Vihar Colony respective employee Tetra Munda Security guard Qtr. No.8 block No.15 at IBR colony occupied by Mantu peon DAV School and servant Qtr. of DAV Pr
(A) 07 NOS. EXHUST FAN SIZE 18IN / 01 NO.CEILING FAN REWINDING/REPAIRING AT AREA OFFICE.(B) ELECTRICAL WIRING OF AGM CHAMBER,KATRAS CLUB,AREA OFFICE UNDER KATRAS AREA.(BASED ON CPWD 2012 SOR(ELEC) 01 NO.SINGLE PHASE DIESEL GENERATOR REPAIRING AT CISF
Repairing of exhaust system, feed chain, sprocket, RHS and LHS track roller and bolt of IDM-30 Drill Machine Sl. No. RDC-1321 and Dismantling, changing, assembling of self starter with change of parts including complete fresh wiring in RDC-1413 RECP-
Electrical wiring repairing in qtr no C/2 Dhori Staff quarter Occupied by Sri Sanjay Kumar Manager (Fin) Qtr No.B/17 Kalyani colony occupied by Sri R.K.Pratap Chief Pharmacist,Kalyani Dispensary and Qtr No B/19 Kalyani clolony Occupied by Sri Upendra
Complete repairing and rewinding of SM130 PE self starter 24V 02 numbers and 01 No. alternator 140 amp presto lite 24V as float and circuit repairing light assly changing with wiring changing for machine Sl. No. BE1000 G10123 Hyd. Shovel at ADIC Kus
Wiring with installation of hexagonal cross arm fabricated in steel tubular pole for lighting and fixing of led flood light in hexagonal cross arm in 13 metre steel tubular pole in 3 numbers of 100 MT road in-motion weighbridge room at Balumath
Wiring repairing of different places as Diesel pump room, first aid room, D.G. set room, CISF check post (all in Excv. workshop) and Qtr. no. LCH-1, B-9, TP B-27, TP B-30 and MQ/518 in r/o SDOCM.
Complete repairing and rewinding of Delco Remy 6 pole self staror 50MT 24V and Alternator 140 Amp. Presto lite 24V and circuit repairing head and black light with wiring changing for Hydraulic Shovel CK300 M/C Sl. NO. 744 at DOCP Kusunda Area
(A)Providing and fixing of finial type lightning conductor and providing and fixing of earth-pit at different locations of Turio colony in r/o SDOCM and Re- wiring/maintenance work at Lal Bahadur Shastri School at Turio colony under SDOCM (B) repairi
A)Changing of corksheet and brass stud and other elect.Work in 2MVA,11KV/6.6KV transformer Sl.No.Mur/08 A/Yule make to feeding power of Jarlahi face pump in SOCP,(B) repairing of electrical wiring of NHS Q.No.390 of Muraidih Colony, AMP Colliery
Following repairing is to be done in CAT 773E Dumper Sl. No. - D/1059, D/1047, D/1043, D/1061 and D/1014. Complete repairing of Self-starter assly. 24V and Alternator 24V and repairing of wiring system and bend platform, stair repairing.
Electrical wiring in 4 no.Quarter,05,06,07,08 Near MAP-3 Substation TMC (ii) Electric in Qtr of Raju Chouhan,Md Fayeem Ansari,Shambhu Orang,Pappu Nonia,Debashish Gouda and Md. Sakur A Type Qtr.No.NTD-138,177,193 and 252 NTT 533 and 823 at NPTS.
Repairing Recondition of damaged electrical wiring of Qtr. No. MQ/15 allotted to Sri Firoj Ansari, Dozer Operator, at Dakra OCP and Qtr. No. MQ16 allotted to M.D. Ali, S.B.A at Dakra Substation, located at Mahavir Nagar Dakra under Dakra Project, NK
Electrical re-wiring of D type Bungalow near Nehru Balika Vidyalaya at Tetulmari of Sri Ankit Kumar,Asst.Manager(Mining) (1)Rajendra Kumar Qtr.No.NTT/591(2)Nand Prasad NTD 529 (3)Goverdhan Beldar NTT 843 (4 )Jitendra Paswan Qtr.No.390 (5)Shivdhani Bh
Fresh Electrical wiring of different official buildings like A) 4, 5 and 6 incline (EnM Room, Lamp Room and cycle stand) B) 7 , 8 incline (Store office, bathroom, latrine room, guard room AC installation at survey office), C) PO office, finance offic
Repairing and maintenance of electrical wiring of Qtr. No. C-A/01 and Qtr. No. C-C/01 (In Ashok Block) at Vasant Vihar Colony, Bachra allotted to Shri Dhananjay Kankarwal, Assistant Manager (Mining) and Shri Ujjwal Kumar, Management Trainee (CD/CSR)
REPAIR / MAINTENANCE TO INTERNAL WIRING, FITTINGS AND FIXTURES IN HQ 163 MED REGT, 112 ENGR REGT, 636 SATA BTY, 623 EME BN, 323 FD HOSP AND 23 ARTY BDE HQ OF JCOS/ ORS MD ACCN UNDER AGE E/M AT DIPATOLI MIL STATION
Repl. of Service cable, Changover switch, Main Switch, Fan, Garden and Gate light, installation of Street light and Inverter, Wiring of Barrack extended room in the DGP Resid. F18 and Repl. of Garden, Gate light in F17 Sector-3 at Dhurwa, Ranchi.
Construction of C Type 1 unit including water supply and sanitary installation works and Electrical wiring of C Type E Type and F Type quarter along with Boundary wall of C Type quarter at 220 132 33 kV G S S Chorkari Chatra
Complete repairing and rewinding of Delco Remy self starter 24V 02 nos. and alternator 140 Amp 24V 02 nos. as float and circuit repairing with wiring changing and light assly changing for Tata 1200 sl no. 103 Hydraulic Shovel at ADIC Kusunda Area