Loading…
Loading…
7,995 results • Best match
Sand Pit River Sand Filling, Vertical Rope, Chin Up Bar, Horizontal Hand Walk Bar, Punching Bag, Protective Shed, Tube Light with Copper wiring, Celling Fan, Brick Boundary Wall, Chain Link Fence, Entrace Gate
Wiring Harness Instrument Panel, Passenger Air Bag Single Stage, Instrumental Panel Air Bag CC, Front Seat Belt WELR TC4 and Exp LH, Front Seat Belt WELR TC4 and Exp RH, Clock Spring Assembly
AS DESCRIBED IN BILL OF QUANTITIES
AS DESCRIBED IN BILL OF QUANTITIES
Construction of New A Site RO with facilities like Sales Building Paver block driveway and other allied civil an electrical works for site between KM Stone 35 and KM Stone 40 on NH 25 BARMER JODHPUR ROAD SRMP 433 under JODHPUR DO of RSO
Construction of A Site RO with facilities like sales building Paver block driveway other allied civil and electrical works at location between KM Stone 39 to KM Stone 42 on NH 116 while moving from Tonk to Sawai Madhopur under Ajmer DO of RSO
Winding Starter Generator Field, Armature Assembly 24V, Field Coil Assembly, Towed Veh Warning Light 24V, Armature Assembly, Drive Assembly, Thermostat, Pump Assembly Water, Regulator Assembly RH, Bearing Tapered Roller, Joint Assembly Universal, ... Universal, Wiring Harness
LV7/TATA 2530-017635 BRAKE SHOE EXTERNALLY ACTUATED, LV7/TATA 2520-012550 PROPELLER SHAFT, LV7/TATA 2920-005211 STARTER ENGINE ELECTRICAL, LV7/TATA 215454601608 WIRING HARNESS PARK BRAKE SWITCH, LV7/STLN 5330-387961 GASKET
As per attached documents.
As per attached document
As mentioned and described in BOQ
Work Contract for Routine, breakdown and annual maintenance works of 33KV Switchyard and 33/6.6 KV D/C line and Electrical maintenance works at Bethali, Parvati and Hinglot River water pump house substation of 4X250MW CTPP, Stage-I Phase-I and II
Brake Chamber Repair kit, Speedo Meter Cable, Armature Assembly, Wiper Motor Assembly, Gasket Case Front, Wiring Harness, Tail Lamp Mask, Pannier Carrier Box, Chain Sprocket Kit, Pipe Comp Front Fork, Gasket Set, Piston Over Size
Lan Cable Fitting And Lan Points, Switch With Ups Rack, Band Width With Back, Electric Point With Wiring Work, Table And Chair Set, Rodent Repellent Device, Minor civil work BOQ Title boq for lan work
As described in Bill of quantities
AS DESCRIBED IN BILL OF QUANTITIES
AS DESCRIBED IN BILL OF QUANTITIES
As per attached document
Construction of 1st and 2nd floor,stair case with RCC frame structure, Structure steel, tiles, false ceiling, roofing sheet, paver block,internal and external wiring, SITC of LT panel, shifting fire pump,SITC of water cooler.
Clutch Booster VG 3284, Wind Shield Washer can 5Ltr, VSS Sensor, Thermostat Flow Control, Weather Strip back door Opening, Brg Clutch Release, Rep kit OH of Rotary FIP, EDC Wiring Harness, Parts kit Mechanical Eqpt, Gear Rear
Split AC 1.5 ton, Split AC 1 Ton, Cassette AC 1.5 Ton, Supply and Installation of Copper Piping, Supply and Installation of Drain Pipe, Core Cutting, Chiseling Work, Electrical Wiring, C Channel Cable Tray Iron, Iron Frames
Steering Spindle, Pump Cartridge Kit consisting of Six, Major Seal Kit Steering Gear box, Assy Steering Column support, Repair Kit, Assy control Mounting Bracket With Tube, Assy Air Pressure Pipe, End Steering Tie Rod, EDC Wiring Harness
Filter Fuel, Brake Shoe Assy, Gasket Set Comp Eng, Spark Plug, Shock Absorber, Assy Vaccume Hose for EGR, Wiring Harness, Bearing Parllel Roller, Combination Switch, Rep Kit MSP 3 40 Quaduple Sys, Brake Fluid Reservoir, Sedimenter Assy
JP Div-Electrical work in c/w Raising the level of PF No. 1 from Rail level to High level & PF No 2 from Medium Level to High Level at Hirnoda (HDA) Station and Dhindha (DHND) Halt station Raising the level of PF No. 1 & PF No. 2 from Medium Level to High Level with extension of length of PF No. 1& PF No. -2 to 600 meters at Kanakpura (KKU) station Raising the level of PF No. 1 from Medium Level to High Level at Dhankya (DNK) Station Raising the level of PF No. 1 & 2 to High level at BDYK.
JP Div-Electrical work in c/w Raising the level of PF No. 1 from Medium Level to High Level and extension of lengths of PF No. 1 to 600 meters with provision of FOB to connect both PFs at Laxmangarh (LNH) station, Raising the level of PF No. 1 & 2 from Medium Level to High Level with provision of FOB to connect both PFs at Bissau (BUB) & Ramgarh Shekhawati (RSWT) stations, Raising the level of PF No. 1 at Mehansar (MWR) halt station Extension of length of PF No. -2 to 600 meters at FPS station
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Left over work of Tower Wagon Shed of Sirsa and Raman Station of Hisar-Bhatinda Section (Gr.193), Provision of 3 mtrs wide FOB at Suchan Kotli, Satroad, Baraguda, Jakhod Khera, Jita Kheri & Zerpur Pali stations of Bikaner Division, Provision of an additional high level passenger platform at Ding station of Bikaner Division along with FOB & all requisite passenger amenities.
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Left over work of Tower Wagon Shed of Sirsa and Raman Station of Hisar-Bhatinda Section (Gr.193), Provision of 3 mtrs wide FOB at Suchan Kotli, Satroad, Baraguda, Jakhod Khera, Jita Kheri & Zerpur Pali stations of Bikaner Division, Provision of an additional high level passenger platform at Ding station of Bikaner Division along with FOB & all requisite passenger amenities.
JP Div-Electrical work in c/w Raising the level of PF No. 1 & 2 from Medium Level to High Level with provision of FOB to connect both PFs at Ratansahar (RSH) station Raising the level of PF No. 1 & 2 from Medium Level to High Level with extension of length of PF No. 1 & 2 to 600 meters at Chirawa (CRWA) station Raising the level of PF No. 1 & 2 from Medium Level to High Level at NUA (Nua) staion, Raising the level of PF No. 1 from Medium Level to High Level at BWPL, BOTR & NRKE (Halt) station.
Clutch Booster VG 3284, Wind Shield Washer can 5 ltr, VSS Sensor, Thermostat Flow Control, Weather Strip Back Door Opening, Brg Clutch Release, Rep kit OH of Rotary FIP, EDC Wiring Harness, Parts kit Mechanical Eqpt, Gear Rear
Simulator Mockup, Recoil System Assy, Controller Unit, Battery 12V 30AH, Sensors Kit, HMD Set HTC, Computer i7 12th Generation, 55 Inch LED TV, Wifi Router TP Link 5G, Wiring and Accessories, Customized Software for Simulator Training, Tracker Unit
MIRROR ASSY VIEW INSIDE, CYLINDER ASSY REAR WHEEL LH, LATCH ASSY DOOR RH, HANDLE DOOR INSIDE LH, ARMATURE ASSY, BUSH SET, BODY ASSY THROTTLE, CROSS UNIVERSAL JOINT, BEARING, BRG FRONT WHEEL, S A FUEL HOSE, WIRING HARNESS MAIN
Repair and Overhauling Service - Electronic Weighing Systems as per IS 9281 (Part I, Part II, Part III, Part IV); Special repair to electrical wiring and panels in P-134 (Officers mess) at AFS Phalodi; Yes; Service Provider Premises
as per attached document
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation, Job Work for repair and maint of provn of addl electric wiring and power points at JAAOC of HQ SWC Bldg; Service Provide..
All wheel hub greasing with labour charge, All Filter Change and fitting work with labour charge, Ele wiring checking and repair work, Body Welding work and touch up painting, Seat repair new foam and rexene change with labour charge
AS DESCRIBED IN BILL OF QUANTITIES
Electric Water Heater supply and fix, S and F Bib Taps, M and L for PVC, S and F stop valves, M and L of new GI steel tube, M and L for submain wiring, S and F single pole
Supply Installation testing and Commissioning of LED Profile Light. One Set Consists of following items:- 1. 12V 2700K LED Strip having 264 LED /Meter - . Qty 500 Meter 2. 12V 60W, 5 AMP LED STRIP DRIVER - Qty 24 Nos, 3. 17 MM RECESS ALUMINIUM ... work, wiring , ...
Supply Installation testing and Commissioning of LED Profile Light. One Set Consists of following items:- 1. 12V 2700K LED Strip having 264 LED /Meter - . Qty 500 Meter 2. 12V 60W, 5 AMP LED STRIP DRIVER - Qty 24 Nos, 3. 17 MM RECESS ALUMINIUM ... work, wiring , ...
Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Unskilled, Facility Management Service- Manpower based (Version 2) - Commercial; Horticulture Services; Unskilled, Facility Management Service- Manpower based ... of Electrical Work ;
Electrical work in c/w Construction of 7 staff quarters type-II (1 KGBS, 1 JTS, 2 KSI, 1 MHU, 2 CKD) under ADEN/Sirsa, Construction of 15 nos. staff quarters type-II ( 4 STD, 2 JKHI, 3 ADR, 2 KNL, 2 SHN, 2 BHT) under ADEN/ Bhiwani, Heavy repair to old dilapidated quarters/ roof replacement and raising Type-II- 30 nos. in colony of various station in Bhiwani sub division, replacement of 18 nos. type-II quarters at Hisar in the jurisdiction of ADEN/Sirsa and replacement of 18 nos. type-II quarters in Rewari-Sadulpur & Rewari-Bhatinda section in the jurisdiction of ADEN/Bhiwani, over BKN division.
Electrical work in c/w Construction of 7 staff quarters type-II (1 KGBS, 1 JTS, 2 KSI, 1 MHU, 2 CKD) under ADEN/Sirsa, Construction of 15 nos. staff quarters type-II ( 4 STD, 2 JKHI, 3 ADR, 2 KNL, 2 SHN, 2 BHT) under ADEN/ Bhiwani, Heavy repair to old dilapidated quarters/ roof replacement and raising Type-II- 30 nos. in colony of various station in Bhiwani sub division, replacement of 18 nos. type-II quarters at Hisar in the jurisdiction of ADEN/Sirsa and replacement of 18 nos. type-II quarters in Rewari-Sadulpur & Rewari-Bhatinda section in the jurisdiction of ADEN/Bhiwani, over BKN division.
JP- Electrical work in connection with [1] Raising the level of PF to high level at BWL & HSI and extension of length of PF at BWL,HSI & GLNA stations .Provision of FOB at KVGM halt station, [2] Raising the level of PF to high level at PSL, MJNL , GAL & KNAR halt and extension of length of PF to 600 meters at BU ,KNAR & SRRG stations, [3] Raising the level of PF to high level at Bassi (BAI) , Bansko(BSKO), Khandel (KNDL) & Peepli Ka Bas (PKBS) stations, [4] Raising the level of PF to high level at JHIR,JW ,KUT ,BAK & ARNA and provision of FOB at JHIR & JW stations
Electrical work in c/w Construction of 7 staff quarters type-II (1 KGBS, 1 JTS, 2 KSI, 1 MHU, 2 CKD) under ADEN/Sirsa, Construction of 15 nos. staff quarters type-II ( 4 STD, 2 JKHI, 3 ADR, 2 KNL, 2 SHN, 2 BHT) under ADEN/ Bhiwani, Heavy repair to old dilapidated quarters/ roof replacement and raising Type-II- 30 nos. in colony of various station in Bhiwani sub division, replacement of 18 nos. type-II quarters at Hisar in the jurisdiction of ADEN/Sirsa and replacement of 18 nos. type-II quarters in Rewari-Sadulpur & Rewari-Bhatinda section in the jurisdiction of ADEN/Bhiwani, over BKN division.
Brake system repair work buster repair and fitting work, Rear wheel eye repair and oil seal change, Rear axle repair and fitting work, Ele wiring ehaking and repair work, Radiator assy repair and fitting work with labour charge BOQ Title BOQ BID
REPAIR AND MAINT OF WATER COOLERS DESERT COLLER DEEP FREEZER AND REFRIGERATORS OF GE A CENTRAL JODHPUR AND REPAIR AND REPLACEMENT OF SUB MAIN WIRING EARTHING INCLUDING DB S AND MISC WORK AGE BR I UNDER GE A CENTRAL JODHPUR (9013/E8)
Facility Management Service- Manpower based (Version 2) - Residential; Housekeeping Security Services; Unskilled, Facility Management Service- Manpower based (Version 2) - Residential; Housekeeping; Unskilled, Facility Management Service- Manpower ... of Electrical Work ;
Facility Management Service- Manpower based (Version 2) - Residential; Housekeeping Security Services; Unskilled, Facility Management Service- Manpower based (Version 2) - Residential; Housekeeping; Unskilled, Facility Management Service- Manpower ... of Electrical Work ;
As described in Bill of quantities
As described in Bill of quantities