Loading…
Loading…
1,005 results • Best match
Replacement of Barbed Wire and Concertina Coil except Angle Iron Post in AOR of BOP Mahisashan and Tesua of 16 Bn BSF under SHQ BSF Silchar
Replacement of Barbed Wire and Concertina Coil except Angle Iron Post in AOR of BOP Lakhibazar and Lafasil of 16 Bn BSF under SHQ BSF Silchar
Installation of 20 Km solar fence (Single String) under SOPD Scheme
FIELDMASTER ABS Electric Fence Energizer with Both
Provn of 500 Mtr Fd Security Fence
Construction of Fence Grill to secure new Project area of APL Namrup
Replacement of Barbed Wire and Concertina Coil except Angle Iron Post in AOR of BOP Lamajour Aurangabad and Kinokhal of 170 Bn BSF under SHQ BSF Silchar
SPL REPAIRS TO BLDG NO. T-66, DRAIN, PROVN OF VEH SHED AT P-20 ZONE 7A, ADDN/ALTERATION TO BLDG NO. T-76 - T-77 BCD AND P-03, REPLACEMENT OF CHAIN LINK FENCING AT NAA UNDER GE (N) TEZPUR
SPL REPAIRS TO BLDG NO. T-66, DRAIN, PROVN OF VEH SHED AT P-20 ZONE 7A, ADDN/ALTERATION TO BLDG NO. T-76 - T-77 BCD AND P-03, REPLACEMENT OF CHAIN LINK FENCING AT NAA UNDER GE (N) TEZPUR
Erection of Chain linked Fencing with 3-strand barbed wire to be fitted on pre cast RCC Post at 100 Ha. AR Plantation, Deka basti in Lumding RF under Lanka Range, Lanka.
galvanized steel chain link fence fabric Average Turn Over of Last 3 Years 030 Lakh (s) Experience with Gov. Required 5 Year (s) Galvanized Steel Chain Link Fence Fabric ( 10000 ) Technical Specifications Specification Specification Name Values ... Steel Chain Link Fence Fabric ...
SUPPLY AND CONSTRUCTION OF 2000 MTR SECURITY FENCE
SUPPLY AND CONSTR OF 2000 MTR SECURITY FENCE
Expression of Interest for Repairing of Retaining Wall at Lecturers Quarter LA-02, SOT Field, Girls Hostel-01 and repairing of chain link fencing at the affected portion of SOT Field, External Painting and Minor repairing works for all Teaching and N
Const. of Chain Link fabric fencing with GI wire and plantation over open public drain at Kokrajhar Town under the 1st Installment of Devolution fund to ULBs (BTR) for the year 2022-23 under the Award of 6th ASFC during 2023-24.
PROVN OF GATE WITH SENTRY POST NEAR EAGLE CHOWK GOVIND NAGAR BUS STOP IDSR MISSAMARI MIL STN PROVN OF CHAIN LINK FENCING AND PROVN OF QTY 10 NEW EARTH PITS WITH CHAMBER AND COVER AT TOR COMPLEX AT CERTAIN LOCATIONS OF GE MISSAMARI
PROVN OF SECURITY LIGHTS ALONG FENCE UNDER GE DINJAN
SPECIAL REPAIR OF JCOSOR ACCN QTR NO B 99 AND B100 P 72 KSP AND CHAINLINK FENCING AT CERTAIN LOCATION IN THE AOR OF PH I AREA OF NARANGI MIL STN UNDER GE NARANGI
REPAIR MAINT CONSTRUCTION OF DAMAGES PORTION OF MAIN BOUNDARY WALL PROVN OF RETAINING WALL 1.95M HIGHT WITH BARBED WIRE FENCING CHANGE OF EXTERNAL ELECTRIC SUPPLY LINE OTHER THAN MARRIED ACCN OTM AND JCO OR FAMILY ACCN TARAPUR LINE OF NO 2 WKSP
SPECIAL REPAIR ADDN AND ALTN TO BLDG NO.T-26 T-29 TOILET BLOCK OF 825 ASC BN AM JOB NO 41SASRBLDG162025-26 AND PROVISION OF CHAIN LINK FENCING QUARTER GUARD BLDG NO.P-42 OF 21 PARA SF AT ROWRIAH JOB NO 41SARW062025-26 UNDER GE
PROVN OF RAIN WATER HARVESTING (RWH) AT 4 ASSAM, 8 RAJ RIF UNIT AREA, OLD MH, DSC LINE AREA AND PROVN OF CHAIN LINK FENCING BETWEEN HARDING ROAD AND ADJACENT DEFENCE LAND TO POLICE LINE, PROVN OF SHED WITH INTERLOCKING PAVER FLOORING AND PERIPHERY CO
galvanized steel chain link fence fabric Average Turn Over of Last 3 Years 14 Lakh (s) Experience with Gov. Required 5 Year (s) Galvanized Steel Chain Link Fence Fabric ( 4500 ) Technical Specifications * As per GeM Category Specification ... Steel Chain Link Fence Fabric ...
Repairing Works in The Substation Building (1 Nos) Including Repairing of Chain Link, Drains, Pipelines, Painting, Plastering Etc. At Assam University Silchar
PROVISION OF CHAIN LINK NET FOR FENCING MESH HARD STANDING FROM POST NO2 TO POST NO6 OF 270 COY ASC SUP PROVISION OF KITCHEN CUPBOARD PLATE RACK SINK AND CURTAIN ROD AT BLOCK NOP65 69 71 75 OF 402 LT AD REGT COMP PROVISION OF PATHWAY
PROVN OF GARBAGE BIN, PROVN OF ONE OFFICER TOILET NEAR OFFICE COMPLEX, PROVN OF ONE SERVER ROOM NEAR BLDG NO P-1, PRON OF CAR PARKING SHED AND SPL REPAIR TO SECURITY CHAIN LINK FENCING AROUND P-5 and T-44 AT MARIANI UNDER GE JORHAT
50 Ha afforestation at Kari chapori under CAMPA 2020-21 with chainlink boundary fence
PROVN OF HARDSTANDING WITH OVERHEAD COVER SHED IN FRONT OF BLDG NO P-3 OF 157 LT AD REGT (COMP) AND PROVN OF CHAIN LINK FENCING BETWEEN NCC TRAINING AREA AND 4 ASSAM MAGAZINE AREA AND 02 X MINOR WORKS UNDER AGE B/R-II OF GE (I) KANPUR
Erection of fencing of 5.46 ha. SPP Plantation at Pub Dairang, Central Range Krishnai
CONCRETE STORM WATER DITCH SECURITY WALL AND FENCE AT DABIDUBI LPG MARKETING TERMINAL FOR NRL NREP PROJECT
Weld Mesh Panel for Perimeter Security Fence as per IS 4948 (Q3)
PROVN OF CHAIN LINK FENCING AT 119 INF BN (TA) ASSAM AND PROVN OF INTER CONNECTING PASSAGE FROM BLOCK NO P-134 TO P-129 OF 17 JAT AT SHILLONG AND PROVN OF FOUR SOAKWELLS NEAR BLDG NO MES(KT) P-3 (ADM BLOCK) P-13 (MAG) P-44 (RELIGIOUS INS
FRP FENCING
PROVN OF CHAIN LINK FANCING, VEH WASHING PLINTH WITH HIGH PRESSURE PUMP SET AND SPL REPAIR TO TOILET AND BATHROOM, ROOF TREATMENT AT MISSAMARI UNDER GE MISSAMARI
Weld Mesh Panel for Perimeter Security Fence as per IS 4948 (Q3) (3 (3 ))
ERRECTION OF FENCING 39.952 HA WITH RCC POST AT KUNDIL KALIA RF UNDER SADIYA RANGE
SPL REPAIR TO CHAIN LINK FENCING IN DM LINE AND SPL REPAIR TO AREA DRAINAGE AT DM LINE AND PROVN OF TWO (02) GENR SHED NEAR BLDG NO MES (KT) P 3 (OFFICE COMPLEX) AT 119 INF BN (TA) ASSAM AND PROVN OF SEWAGE NALA IN FRONT OF MES (KT) P 2A (OR SINGLE
Galvanized Steel Chain Link Fence Fabric (V2) conforming to IS 2721 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6606874 Dated : 25-08-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
ERECTION OF FENCING
Fencing Consumable Equipment
FENCING CONSUMABLES EQUIPMENT
CONSULTANCY SERVICES FOR SOIL INVESTIGATION FOR PERIMETER SECURITY WALL AND FENCE AT LIKABALI MIL STN
SPL REPAIR TO BLDG NO. T-37 (OR LIVING) AT HQ 77 MTN BDE, PROVN OF WALL PANELLING TO MAIN OFFICE BLOCK BLDG NO. T-6, CHAIN LINK FENCING AT 106 INF BDE SIG COY AND VEHICLE WASHING POINT AT MT IN HQ 106 INF BDE CAMP AND HARD STANDING AT TCP OF HQ 77 MT
INVITATION OF BIDS FOR RECTIFICATION OF EXISTING SMART POWER FENCE INSTALLED AT AIR FORCE STATION DIGARU
PROCUREMENT OF FENCING WIRE
Fencing Non Consumable Equipment