Loading…
Loading…
363 results • Best match
Replacement of existing 300 dia half round pipes with 600 dia half round pipes for Lift Irrigation Scheme at udalshe in V.P. Sancorda of Dharbandora Taluka
Maintenance and repairs of Panel board and transformer of Lift Irrigation Scheme at Bhom Padeli, Sawarsehem, Padeli, Dhada Gueli, Advoi, Karanzol, Dhamshem And Vantem in Sattari Taluka.
Procurement of Mild Steel Kolhapur Type weir gates for Open Type Bandhara for lift irrigation schemes at pump house no.2, Valkini and Vaddem in Sanguem Taluka
Construction of minor irrigation tank at Charavnem in V.P. Dongurli Thane in Sattari Taluka. Reg Study on Disaster Management plan and waste Management plan. Re- tender
Maintenance and Repairs of Lift Irrigation Scheme at Nayawada in Sattari Taluka. Reg. Rewinding of Transformer of 400 KVA Supplying of Armoured Aluminium Cable and providing Earthing. II Call
Revised Estimate for Command Area Development and Water Management Programme of Tillari Irrigation Project Urgent Repairs and Maintenance to the lift irrigation scheme No I III at village Kasarvornem and Nagzer in Pernem Taluka for the year 2026 27
Providing syphon and repairs to existing half round canal line under Paikul Lift Irrigation Scheme at village Paikul, VP Guleli in Sattari Taluka.
Replacement of existing 300dia half round pipes with 600 dia half round pipes for Lift Irrigation Scheme at Babulwada Karmane in V. P. Karmane in V.P. Kirlapal Dabal of Dharbandora Taluka.
Construction of irrigation canal at Sukanya-Tishem in Village Borim of Shiroda Constituency.
Construction of irrigation canal at Chepkhajan in Village Amblai Panchawadi of Shiroda Constituency
Desilting of major Internal Canals of Chikalpaine Khazan connected to Cubarjuvem canal in V.P. Cundaim jurisdiction in Marcaim Constituency of Ponda Taluka
Providing and laying GI chain link fencing to the demonstration plots under sy no 139 140 142 145 146 147 148 of Nirankal village under the Lift Irrigation Scheme at Nirankal in Ponda taluka.
Maintenance and up-keep of earth dam clearing of down stream and upstream of slope and surrounding area of dam site office of Minor Irrigation tank at Gavanem, V.P. Gaondongrem in Canacona Taluka
Construction of Water Harvesting Structure- Mini Check Dam in Survey No. 84/17 At Bandoli, Kirlapal, Dabal, Dharbandora Goa
Fifth Revised Estimate of the Interstate Tillari Irrigation Project-Canal network in Goa. Reg Strengthening of B/6 distributary of RBMC of TIP from Ch 0.100kms to Ch.0.440 kms by providing 100mm thick R.C.C lining at Village Torxem in Pernem Taluka
Selection of Consultant for preparation Detailed Project Report for the Construction of Barrage and 50 MLD raw water pumping station at Ordhofond, Poinguinim, across Talpona river for augmentation of Minor Irrigation Tank at Gavanem for uninterrupted
Construction of Irrigation Canal from Talsare to Vasade Kajur in V.P. Cavrem Pirla of Barcem Constituency
Strengthening of Right Bank Main Canal (RBMC) from Ch.17.475 Km. to Ch.23.747 Km. of Tillari Irrigation Project (TIP) and B2 distributary from Ch.2.150 Km. to Ch.9.750 Km. of RBMC of TIP, Construction of head regulator Weir across the river Kalna...
Providing of PVC pipe line and construction of RCC Half round pipe canal network from main road ( Hedode bus stand) to Dhangarwada at Kopardem Lift Irrigation Scheme in Sattari Taluka.
Fifth Revised estimate of the interstate Tillari Irrigation Project Canal network in Goa. Reg. Strengthening and modifications of Right Bank Main Canal TIP canal, aqueduct and other appurtenances from Ch. 6.20Km to 17.470Km
Construction of Barrage and 30MLD Raw water pumping station at Mirabag, Sanvordem/Curchorem, across Zuari River For Augmentation of Minor Irrigation Tank at Panchawadi for un-interrupted Raw Water to Drinking Water Treatment Plant at Panchawadi in VP
Construction of Barrage and 30MLD Raw water pumping station at Mirabag, Sanvordem/Curchorem, across Zuari River for Augmentation of Minor Irrigation Tank at Panchawadi for un-interrupted Raw Water to Drinking Water Treatment Plant at Panchawadi in VP
Construction of Barrage and 30MLD Raw water pumping station at Mirabag, Sanvordem/Curchorem, across Zuari River For Augmentation of Minor Irrigation Tank at Panchawadi for un-interrupted Raw Water to Drinking Water Treatment Plant at Panchawadi in VP
Fifth Revised Estimate of the Interstate Tillari Irrigation Project Reg Extension to overflow section of B 6 distributary by providing DI pipeline upto Kadshi River to avoid water logging of surrounding fields at Ch.6.95 kms of B 6 distributary of RB
Construction of side banks and Improvement of waterways from Gavon to Uzro check Dam in V.P. Camorlim, Salcete Goa of Curtorim Constituency
Maintenance of motors at Lift Irrigation Schemes at Naikaband and Valkini PH no.2 regarding..Rewinding of 125 KW/170 HP, Kirloskar Brothers Pvt. Ltd make and 100HP, 3 Phase, 75KW, L.T. induction motor of Crompton Greaves make centrifugal pump and sup
Urgent repairs and providing and laying R.C.C. lining to canal section at cross drainage portion at Ch. 655m, 1050m, 1220m, 1270m, 2122m, 2267m and 2457m of Xeldem branch of Distributary D1 canal in Xeldem village of Quepem Taluka.
Providing and laying R.C.C. Canal lining for strengthening of Distributary D2-D3 combined canal of S.I.P. from Ch.0.00 Km to 8.050 kms in Kusmane Village of Quepem Taluka and Paroda, Mullem Village of Salcete Taluka.(2nd Call)
Fifth Revised Estimate of the Interstate Tillari Irrigation Project Canal Network in Goa Reg Strengthening and Modifications of Narve Pilgao Distributory Canal of L.B.M.C of TIP Canal and other appurtenance by laying 1200 mm Dia D.I. Pipeline fro
Annual maintenance of Distributary D3 canal of S.I.P. from Ch. 3.60 kms. to 6.20 kms. at Dramapur and and Navelim Villages of Salcete Taluka for the year 2023-24
Improvement to existing Irrigation Tali in Sy. No. 31/1 and construction of canal at Bimbal V.P. Cotorem in Sattari Taluka
Construction of Canal along the road side of existing irrigation tank at Dhaigoade V.P. Querim in Priol Constituency of Ponda Taluka
Laying 1000mm dia washout line for Tillari Irrigation Canal Water from 50MLD Pump House to Assonora River at Assonora Water Supply Scheme.
Up-gradation and improvement of Lift Irrigation Scheme at PadeliV.P. Bhironda in Sattari Taluka
Maintenanceof Lift Irrigationscheme at BhomPadeli in SattariTaluka Reg Extensionof halfround pipe canal fromexisting chamber to the field of Satish Desai ShriPrakash Desai ShriUttam Gawas ShriPramod Desai and others at Advoi LINE 4
Construction of Parra Minor Offtaking at Ch.37.200km of Left Bank Main Canal of the Tillari Irrigation Project in Parra village of Bardez Taluka.
Construction of Anjuna Branch-1 from Ch.0.00Km to 5.36 Km off taking at gravity main of Anjuna Distributary of Left Bank Main Canal of TIP at Village Assagao and Anjuna of Bardez Taluka
Up-gradation and improvement of Lift Irrigation Scheme at Bhironda in V.P. Bhironda in Sattari Taluka
Up-gradation and improvement of Lift Irrigation Scheme at Advoi in V.P. Bhironda in Sattari Taluka
Fifth Revised estimate...Canal network in Goa. Reg. Supplying, laying testing and commissioning D.I. pipeline of 1000mm Dia from Ch.21.635 Kms to 28.970 kms of Tillari irrigation canal...Water Treatment Plant at Guirim and Pilerne in Bardez Taluka.
Fifth Revised estimate of the interstate Tillari Irrigation Project Canal network in Goa. Reg.Strengthening and modifications of L.B.M.C of TIP canal, aqueduct and other appurtenances from Ch. 0.00 Km to 6.00 Km. and Ch. 7.50 Km to 13.40 Km
Fifth Revised estimate...Canal network in Goa. Reg. Supplying, laying testing and commissioning D.I. pipeline of 1000mm Dia from Ch 14.30 Kms to 21.635 kms of Tillari irrigation canal...Water Treatment Plant at Guirim and Pilerne inn Bardez Taluka.
Stabilization to LHS bank of nallah and construction of irrigation canal on upstream side of Khanir bandhara at Tollem Udain in V.P. Shiroda of Ponda Taluka
Construction of culvert across D2 Distributory Canal of Salaulim Irrigation Project in Survey No.168/1 in Village Sao Jose De Areal of Salcete Taluka (2nd Call)
Fifth Revised estimate of the interstate Tillari Irrigation Project Canal network in Goa, Regarding Strengthening and modifications by RCC Lining of 100 mm thick for Revora I Distributory from ch. 705 mts to ch 1211 mts of Left Bank Main Canal of TIP
Fifth Revised estimate of the interstate Tillari Irrigation Project Canal network in Goa, Regarding Strengthening and modifications by RCC Lining of 100 mm thick for Revora I Distributory from ch. 200 mts to ch 705 mts of Left Bank Main Canal of TIP
Improvement to existing kachha irrigation canal (Paat) from Bhailifal Tali to Shri Nagesh Shirodkar House in Ward No. 2 of VP Surla in Sankhali Constituency of Bicholim Taluka.
Fifth revised estimate of the interstate Tillari Irrigation Project - Canal network in Goa. Regd. Construction of Compound Wall along the main road at T.I.P. Complex at Karaswada, Bardez, Goa.
Supplying, installation, testing and commissioning of Centrifugal Pumpset of Lift Irrigation Scheme at Pali, Satre and Kudshe in Sattari Taluka.
Urgent repair of road damaged due to construction of 30MLD water pumping station at calangute on Tilari irrigation canal from pilerne IDC and surrounding area of calangute and saligao Constituency