Loading…
Loading…
3,494 results • Best match
Renovation of Sub Divisional Officer Residence at Canal Colony Naraingarh
Internal Clearance of JLN Canal from K.M. 17.000 to 23.000
Repair of quarter no. S-2 in Canal Colony Ambala
Internal Clearance of Loharu Canal from RD 0 to 32000
Repair of quarter no. S-6 in Canal Colony Ambala
Repair of SDO residence No. 4 in canal colony, Mahendergarh
Repair and maintained of F.H 22 in Canal Colony Rohtak
Internal clearance of Loharu Canal from RD 49000 to 77750
Repair of inlet at K.M. 23.650 L of SYL Canal.
Providing and fixing parking sheds in Canal Rest House Gohana
Internal clearance of Loharu Canal from RD 0 to 49000
Repair and maintenance of parking garage in canal colony Rewari
Repair of Quarter No. J-2 in Canal Colony, Jind
Estimate for repair of revenue office at canal colony, Rewari.
Internal Clearance of JLN Canal from K.M. 0.000 to 10.000
Repairing and maintenance of F.H 7 of canal colony Rohtak
Replacement of filter media of OHSR in Canal Colony, NNL
Construction of new sumpwell at RD 6000-L Loharu Canal
Laying underground pipe line of watercourse Canal Rest House Danoda
Providing floor and tiles in Canal Rest House Saragthal Gohana
Renovation of Canal Colony at 3 under Hill Road Delhi.
Supply and installation open gym facilities in Canal Colony, Mohindergarh
Estimate for constructing V.R. Bridge at K.M. 11.275 JLN Canal
Repair of XEN Residence R-2 in Canal Colony Narnaul
Construction of new sumpwell at RD 9000-L Loharu Canal
Stone Retaining Wall at RD 12.320 Km on Augmantation Canal.
Construction of New Canal Rest house Building at Lohani Reservoir
Internal Clearance of Mahendergarh Canal from K.M. 1.800 to 6.600
Internal Clearance of Mahendergarh Canal from K.M. 6.600 to 15.650
Construction of new sumpwell at RD 1100-L Loharu Canal
Construction of new sumpwell at RD 36000-L Loharu Canal
Construction of new sumpwell at RD 1100-R Loharu Canal
Construction of new sumpwell at RD 36000-R Loharu Canal
Special Repair of Kothi No 7 in Canal Colony Jagadhri
Bolni- Providing canal based water supply scheme for Garhi Bolni
Planning, Designing, Supply, Installation,Testing,Commissioning and operation and maintenance for 3 years (including 3 year free maintenance solar power integrated micro irrigation scheme in command of the existing outlet at Rd 29300/L Dhunderheri Mr
Estimate Planning, Design, Supply, Installation, Testing , Commissioning and Operation and Maintenance for 3 years (including three year of free maintenance of on- farm Micro Irrigation System) after one year assured performance RD 18900-R Baraloo Mr
Estimate Planning, Design, Supply, Installation, Testing , Commissioning and Operation and Maintenance for 3 years (including three year of free maintenance of on- farm Micro Irrigation System) after one year assured performance RD 81000-R Damkora Dy
Construction of independent canal based water works and providing and laying DI water supply pipleine , FHTC at village Hansawala Teh. Tohana Distt. Fatehabad Under JJM)
Internal Clearance of M/Garh Canal from K.M. 15.650 to 20.746 i/c sump clearance of PH MC-III at K.M. 20.746 of M/Garh Canal
Protection of toe wall and control excessive scouring both sides of the canal by laying stone boulder apron in Reach RD 145000-162500 WJC MLL canal.
Protection of toe wall and control excessive scouring both sides of the canal by laying stone boulder apron in Reach RD 162500-176000 WJC MLL canal.
protection of toe wall and control excessive scouring both sides of the canal by laying stone boulder apron in Reach RD 176000-190200 WJC MLL canal.
De-silting of WYC Canal from RD-900 to New Silt Ejector at WYC HE Project, Bhudkalan
Providing, laying and Jointing of DI K-9 Pipe for supplying of Treated waste water from 30MLD STP Badshahpur to Chhainsa Distributary in Faridabad.
Estimate for internal clearance of JLN Main Canal from Km. 29.500 to 33.350. Removal of Silt and weed, Internal clearance of canal.
Estimate for special repair of damage Jind distributary No. 1 from RD 250 to 370 and 12800 to 12840 offtaking at RD 22100/R Hansi Branch
Estimate Repairing Hut Head Regulator at RD 34909 of Gurgaon Canal
Construction of Hall in the Shiv Dham located between teo canals on Assandh road under CM Announcement Code 27808 dt 07/07/2024 in Ward no.22 MC Panipat(Urban)
Repair of damaged canal lining in downstream of old silt ejector and near Tajewala bridge at WYC HE Project, Bhudkalan