Loading…
Loading…
1,569 results • Best match
A.R and M.O NH.05 Km 236.00 to 368.00 SH. C.O PCC B. wall at RD 285.560 to 285.575
Periodical Renewal work on NH 503 Extn. in km.19.00 to 28.00 in the State of Himachal Pradesh on EPC mode.
C/o Bye pass road from Baddi Barotiwala road to NH 105 via Cadilla, Glaxo and other Industries, Baddi
R/m of Road From Suresh Tajta house to NH 705 at Chhol in ward No-01 NP Kotkhai
Rep of road fron NH Taxi Union to water Tank sub head CC near Gupta house Ward No 14
Construction of Street from NH-07 towards the H/o Kalsi and etc in Ward No 01, Paonta Sahib.
Providing hill slope protection from RD 300m to 420m on NH 154A (Bagga road) of CPS II Power station
Construction of Retaining wall near NH zero point towards Churi Bridge RD 125 to 160 m (Pkg. No.PHC3-02)
Construction of Ambulance road from NH 205 to Kamna Devi Temple in ward No 8 SH Resurfacing of road
A.R and M.O on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 .SH. Construction of Edge wall in PCC for Approach Road and Construction of PCC Dirt wall on Both ends of Manglour Bridge at RD 79.875 under NH Sub Division Banjar.
Restoration of rain damages on NH-70 New NH-03 on Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur Taunidevi Awahdevi Sarkaghat Dharampur Mandi road from Km. 58/400 to 196/495 (SH Construction of PCC Retaining wall from Km. 63/370 to 63/395 LHS
A/R and M/O on NH-305 Sainj- Luhri Banjar Aut road Km 53/00 to 97/00 (SH-Widening of NH-305 and protection to the Police line, Mandir and Judiciary complex at Banjar Bazar at RD 73/182 to 73/240).
R.R damages on Kalka Shimla Wangtoo Road NH 22 NH 05 from Km 155.00 to 236.00 SH Supplying and stacking of crusher Sand in snow Bound Reaches for Smooth plying of traffic and hiring of Excavator cum Loader for removal of snow debris etc betwe
Construction of Flyover at Mandi Gobindgarh at Design km 0.350 existing km 260.800 including resurfacing of existing Service Road at location of flyover at km 260.800 on Jalandhar Panipat Section of NH 44 old NH 01 in the State of Punjab on EPC basis
New NH-105)km.35/0 to 66/275 (SH-C/O R/wall at R.D.57/300 to 57/320 and B/wall at RD 62/970 to 62/985
Short-Term Maintenance of NH-907 between km. 45/880 to km. 53/300 in the State of Himachal Pradesh
Improvement of black spot on old NH 22 km 62/200 to 67/200 SH Providing and laying M S Grill in km 66/625 to 67/120
Resurfacing of road from NH to Energy Block RD 0 0 to 0 65 mtr in ward No 30 Kangnadhar
P/F Tubular type Retro-reflective (U shape) overhead Signage board on NH Near Banuri in Tehsil Palampur Distt Kangra.
A.R and M.O on NH.05 Km 236.00 to 368.00 SH. Construction of V.shape drain at RD 367.1000 to 367.1250
Repair and Restoration on link road from NH-21 Jamli to village Neri road km 0/00 to 2/500
Rain damages to path Kasumpti bazaar to NH 5 Bye pass at Dev Raj Building in ward no 26 Panthaghati
R/M of path from NH 503 to Ravi Dass colony. Tilak Raghvir house in Ward No. 9 Balance work
Restoration of rain damages path from NH 22 to Gorkhu Lodge near Surinder Sharma House in ward No 25 Malyana
Development of new A site RO at Village Bhadwar, On NH 154, Tehsil Noorpur, District Kangra under Shimla DO, PSO
C/O Approach road from NH-05 to Air force Station Galu Kalan Tehsil Theog Distt. Shimla HP. Balance work
Maintenance works and activities PBMC on NH21A New NH 105 Km 35 to 49 in the State of Himachal Pradesh
Regarding proposal to erect Install thematic wall and gate on NH 07 at Kala Amb (SH Construction of Entrance Gate)
Improvement of Junction at Km 63/660 at Nehranpukhar for road safety NH-503 in the State of Himachal Pradesh
Restoration of rain damages Path from NH 22 to Gorkhu Lodge near Surinder Sharma House in ward No 25 Malyana
R/R Damages on Old NH-22 road in km 62/200 to 67/200 (SH C/O R/Wall at RDs 65/365 to 65/375)
Periodical renewal work on selected stretches from Km 17/350 to 18/380, 23/750 to 24/980, 30/400 to 30/480, 31/800 to 37/400, 38/800 to 41/350 of Theog Hakoti road NH-705 under Annual Renewal Program(ARP) for year 2020-21 in the State of Himachal Pra
Improvement Construction of existing Class 5 Road to NH Intermediate Lane Specification with Hard Shoulder from existing Km 76pt34 to Km 134pt94 Design ch Km 76pt3 to Km 133 Total Length 56pt7 km of NH 505 Sumdo Kaza Gramphoo Road on EPC in HP Pkg I
Strengthening including Improvement of road Safety on Km 49 0 to 66 N 275 SH C O R wall Parapets W beam Crash barriers and edge walls road signages on NH-21A New NH 105 under Annual Plan 2019 20 in the State of Himachal Pradesh
RFP For Appointment of Safety Consultants for Under Construction Projects i.e. 4L of Solan-Kaithlighat Km 106.139 to Km 129.050 of NH-05 in HP, 4L of End of Pinjore bypass-Nalagarh Km 4.200 to km 35.397 of NH-105 in Haryana and HP on EPC Mode.
Construction of 2 no. Bridges at RD 78/450 and 79/550 on NH-154A in the State of Himachal Pradesh.
Development of Passanger Ropeway between Chandigarh Manali National Highway near Pandoh Dam to Mata Baglamukhi Temple Bakhli Distt. Mandi H.P. (SH C/o staircase with FOB at LTP and UTP)
A.R and M.O NH.05 Km 236.00 to 368.00 SH. Construction of Retaining wall in PCC at Rd 278.980 to 279.000
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH- Construction of rain shelter at Sainj)
A.R and M.O NH.505A Km 0.00 to 17.00 SH. Construction of Retaining wall in PCC at RD 6.630 to 6.642
Special repair to NH.305 IN Km 0.00 to 97.00 SH. Construction of wire crate R.wall at Km 48.300 to 48.320
Repair of Road and path from NH to house of Sh Gopal Sub head Excavation R.R masonary in ward no.3
Special Repair at Vulnerable Locations from Km 284 0 to 286 0 on NH 05 in the State of Himachal Pradesh
AR and MO on NH 303 Km 000 to 3900 SH Construction of Rain shelter at RD 11995 at village Nihargaloo
Launching of 130 Feet DDR Bailey Bridge at Manglore Over NH 305 Tehsil Banjar Distt Kullu SH Launching and Transportation etc
Resurfacing of MC road from NH Store to Dyrton Bowri RD 0 0 to 0 300 mtr in ward No 34
Improvement of zero point junction at Tutikandi on NH-05 against Smart City Project (SH- C/O Retaining walls) (Phase-I)
Providing and laying PVC pipe from Anand house to Janardan house, Bablu house Kamal house below NH in ward no.4
Providing and laying interlocking Paver blocks in railway station road from NH road to Lal Sahab house Salogra ward no.4
Restoration of rain damages (SH Construction of path nallah from Lalltu Niwas to below NH 22 BhattaKufer) in ward No 23