Loading…
Loading…
4,644 results • Best match
EXTERNAL MICROMETERS (Q3) MSE Exemption for Years of Experience and Turnover
Digital Multimeter as per IS 9000 (Q3) MSE Exemption for Years of Experience and Turnover
Ratchet Type Torque Wrench (Q3) MSE Exemption for Years of Experience and Turnover
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Exemption for Years of Experience and Turnover
Solid Cushion Tyres (V2) (Q3) MSE Exemption for Years of Experience and Turnover
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6348716 Dated : 16-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1629696 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 32594 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/JU North Western Railway, Jodhpur (Sr.dfm/ju) 2/7 Splitting
Electric Drill (Q3) MSE Exemption for Years of Experience and Turnover
Depth Micrometer (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6305226 Dated : 05-06-2025 Bid Document 1/5 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Twist Drill (Morse Taper Shank) as per IS 5099 (Q3) MSE Exemption for Years of Experience and Turnover
Digital Multimeter (Q3) MSE Exemption for Years of Experience and Turnover
Heavy duty longspan storage System (Q3) MSE Exemption for Years of Experience and Turnover
Line Interactive UPS with AVR (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6802997 Dated : 17-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2)
High End Laptop - Notebook (Q2) MSE Exemption for Years of Experience and Turnover
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6775765 Dated : 10-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6350334 Dated : 16-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1587000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 31740 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/JU North Western Railway, Jodhpur (Sr.dfm/ju) 2/7 Splitting
Single Row Deep Groove Ball Bearing (Without Flange Outer Ring) as per IS 6455 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6703046 Dated : 26-09-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover
CALIPERS (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6305405 Dated : 05-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Grease Gun as per IS 7794 (Q4) MSE Exemption for Years of Experience and Turnover
Reciprocating Air Compressors - Electric Motor Driven (Q2)
Twist Drill (Morse Taper Shank) as per IS 5099 (Q3) MSE Exemption for Years of Experience and Turnover
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6352968 Dated : 17-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 2583126 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 51662 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/JU North Western Railway, Jodhpur (Sr.dfm/ju) 2/7 Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6338396 Dated : 12-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 2215200 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 44304 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/JU North Western Railway, Jodhpur (Sr.dfm/ju) 2/7 Splitting
ADDITION ALTERATION OF MINI L3 EQUIPMENT ROOM AT SITE 1A AT 33 SU AND IMPROVEMENT OF GYMANSIUM AT OFFICERS MESS AND DJ OFFICERS ENCLAVE AND PROVN OF SUN-SHED FOR GUARDS AT VARIOUS LOCATIONS AT AIR FORCE STATION JODHPUR
Construction of 1 nos. room at First floor 33kv S/S Harmada, and Construction of room, parking shed, toilet , approach, raising of boundary wall, at sub-division office G-I,G-II,G-IV and Road no.06, Jaipur
PROVN OF ADDN/ ALTERATION OF OTM BLDG NO. P-02 AND PROVN OF SHIFTING OF DG SET FROM 60 WEU OLD LOCATION TO 60 WEU NEW LOCATION ALONGWITH PLINTH AND SHED AT BIKANER MIL STN UNDER GE (N) BIKANER
SPL REPAIR TO BLDG NO P-251/01 to 08 (OR MD ACCN) AT 23 SIKH AND T-1350, T-1351 AND T-1352 AT STORAGE SHED FURNITURE YARD OF BSO OF GE SGNR AT MILITARY STATION SRI GANGANAGAR
SPECIAL REPAIR IN OR BATHROOM AND TOILETS OF BLDG NO T-03 (TOTAL-21 NOS) AND PROVN OF PARKING SHED INFRONT OF BLDG NO P-03 AND NEAR BLDG NO P-102 IN NORTHERN SECTOR AT MIL STN KOTA
ADDITION/ALTERATION OF SINGLE OFFRS ACCN NEAR RAJENDRA CIRCLE AND CERTAIN MINOR WORKS FOR TOILET IN ECHS, SHED IN SUB AREA OR MESS AND FIBRE SHEET IN BLDG P-622 UNDER AGE B/R -IV OF GE (SOUTH) JAIPUR
Zone contract (Masonry & Painting) Zone 5:- Service Building in the section of SSE/W/P/JU i.e. Loco Shed, Washing Line area, at JU & other service Building at JU under ADEN/HQ/JU for year 2026-27 & 2027-28
Pashu Shed work shri krishan goshala simiti Pilibangan goan
Valmiki cremation ground shed and pond construction village Karanpur
ShyamaPrashad_Gadhwala_2020 (Gram Panchayat Me Bus Stand/ Shed Nirmaan Karya)
Shed/cattle housing in Teju Peer Gaushala Sansthan Dhatri
C/o Parking shed behind A,B & C Block near boundary wall at GSI Office Campus, Jhalana Doongri, Jaipur. SH: C/o Parking area upto only plinth level and Misc. work at GSI Office Campus, Jhalana Doongri, Jaipur. Subwork/Packages: Civil work
Provn of covered parking shed alongwith hard standing, connecting passage with interlocking tile and addition / alteration in Bldg No T-751 (Offrs Mess), Bldg No P-44 and certain sanctioned works under AGE B/R-I at Suratgarh Mil Stn
R and M work Of Residential and Non Residential building(1nos. Control room ,1 no R2,1noR-3,1no R-4,4 nos R-5 type qtrs and qtr toe wall with fencing Guard hut and store Shed) at 220 KV GSS Gangapur City
Special repair to Building No OR-22/01 to 12, OR MD Accn, Provn of hard standing in front of P-272, floor tiles in Bldg No P-247 and Parking shed under AGE B/R-I at Suratgarh Mil Stn
Catering Services at General Minor Unit No. MVJ-27 at P.F.No. 04-Location 10 meters away from cover shed towards Udaipur end earmarked for General category at MAVLI Junction Station of B Class for a period of 05 (Five) Years.
Spl repair /Replacement of LT cables LT panels and Addn/Altr to Bldg No P-18 BC and Provn of car parking shed Adjacent to Bldg NO P-16 and Provn of RO plant in AD Regt under GE Bharatpur
EXTENSION OF BUILDING NO. P-104 SMC AND PROVISION OF COVERED SHED AT MT SECTION INCLUDING SPECIAL REPAIRS TO EXISTIING PIPELINE WITH CPVC PIPELINE IN CERTAIN SMQ (PHASE-I) AND ALLIED WORKS SERVICES AT AIR FORCE STATION MOUNT ABU RAJASTHAN
CONSTRUCTION OF QTY 5 ADDITIONAL COVERED PARKING SHED TO ACCOMMONDATE ADDITIONAL REFEULLER INCLUDING 27 KL REFUELLER AND PROVN OF BARBED WIRE FENCING OVER MPR RADAR HILL TOP AND EXTENSION AND RENOVATION OF SHELTERS AT CERTAIN SIGNAL UNIT AT AF STN
CO Garrage Pol store Electric substation Pump Room and Generator Shed Sarv Dharmasthal 02 Nos Corner bunker 02 Nos 02 Men Bunkers at BOP Raithanwala of 56 BN BSF SHQ BSF Jaisalmer S SH Providing and Fixing of EI Fans
Ajmer Division: Provision of S&T work in C/W Construction of RUB in lieu of LC 9, 15, 17, 38, 40 and 50 with Covering shed at these LCs for elimination in COR-UDZ section over Ajmer Division NWR.
SPL REPAIR TO BLDG NO.T-10(BLT LINE), T-890 (DINNING HALL), T-15 (OR COOK HOUSE), T-755 (LRW LIVING) AND T-769 (JCOS SINGLE LIVING) AND PROVN OF HARDSTANDING ALONGWITH SHED UNDER GE (ARMY) SURATGARH AT SURATGARH MIL STN
Spl repair to various OTM bldgs at AFS Mandore, Provn of parking shed near bldg No P-312 at AFS Jodhpur and Addn Alteration to existing washroom to cater for ladies toilets and changing room at 5 ASC at AFS Jodhpur
SPL REPAIR TO OR LINE BATHROOM TOILETS IN BLDG NO P 352 OF ARMD REGT AND HARDSTANDING IN FRONT OF BLDG NO P 16 FRESH SHED AT COY ASC AT AGE B R II AREA UNDER GE ARMY CENTRAL JODHPUR