Loading…
Loading…
3,984 results • Best match
1.Providing BT Road, CC Road (With Retaining Wall) at JJ Nagar Main Road in Pullarambakkam Panchayat 2.Providing BT Road at Bhagat Sing Street at Pullarampakkam panchyat. In Tiruvallur Block Under Peri-Urban-CMDA-Street-2023-24 Pac.91
Reconstruction of RCC Retaining wall at Km 38.2 of Sendurai - Udayarpalayam- Anaikarai road -MD-684-in lieu of existing damaged RR masonry retaining wall
PROVIDING RETAINING WALL WITH FOOTPATH AND DRAIN AT BICKOL
Construction of Bathing ghat and Retaining wall (4 Nos)
Construction of Retaining wall to RR Park at Kerapadu
Providing Retaining wall near Burial Ground in Kalinjikuppam 66m
Construction of Toe wall , Sempati Kulam S. No.119 in Keelvelur Town Panchayat, Nagapattinam District
Construction of Retaing Wall at South Side of Kakka Vaari Near Crematorium in Kattuputhur Town Panchayat, Tiruchirapalli District
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 300 to CH 350 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 0 to CH 50 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 250 to CH 300 m from outside of peripheral compound wall at TTPS
Salem District - Yercaud Block - Formation of CC road with Protection wall from MGR Nagar manoharan house to vijayalakshmi house at MGR Nagar h/O Yercaud in AGAMT - II - 2022-23 YRD-07/2022-23
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit I II III chainage from CH 500 to CH 550 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 500 to CH 550 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 550 to CH 600 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 400 to CH 450 m from outside of peripheral compound wall at TTPS
Construction of Flood Protection wall in Vandiyur Tank near the Confluence point of Sathiyar River near lake area nagar in Uthankudi village of Madurai East Taluk within the Madurai Corporation limit in Madurai District
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 150 to CH 225 m from outside of peripheral compound wall at TTPS
Providing Retaining/ Protection wall on the North side of Cooling Water Open Channel for Unit I II III chainage from CH 650 to CH 700 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 450 to CH 500 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 600 to CH 650 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 625 to CH 700 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 775 to CH 850 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 700 to CH 775 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 800 to CH 850 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 200 to CH 250 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 850 to CH 900 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 400 to CH 450 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 750 to CH 800 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit I II III chainage from CH 350 to CH 400 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit I II III chainage from CH 300 to CH 350 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 100 to CH 150 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 75 to CH 150 m from outside of peripheral compound wall at TTPS.
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit I II III chainage from CH 700 to CH 750 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 0 to CH 75 m from outside of peripheral compound wall at TTPS
Renovation work Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 75 to CH 150 m from pump house 1 at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 150 to CH 200 m from outside of peripheral compound wall at TTPS
Providing Retaining Protection wall on the North side of Cooling Water Open Channel for Unit 1 to III chainage from CH 50 to CH 100 m from outside of peripheral compound wall at TTPS
Salem District - P.N.Palayam Block - Construction of Protection wall at km 4/0-5/0 of Kallur To Pattimedu Road H/O P.K.Hills Keelnadu P.N.Palayam Block Package No. 02/2021-22 of NNT- 2021-2022
Reconstruction of Dividing Anicut in Sengattankulam Tank Surplus Channel and construction of flood protection wall to feed Kongarakulam Tank in Nilakottai village and Pappakulam Tank in Nuthulapuram village of Nilakottai Taluk in Dindigul District
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1 to 3 chainage from CH 450 to CH 500 m from outside of peripheral compound wall at TTPS
Salem District - P.N.Palayam Block - Construction of Protection wall at km 0/0-0/8 of Soolankuruchi To Melpoondi Road H/O P.K.Hills Keelnadu P.N.Palayam Block Package No. 01/2021-22 of NNT- 2021-2022
Construction of Breast wall in Km 5/8 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road
Widening, Strengthening including Construction of Breast wall works in the Government roads of Thiruvadanai (H) CandM SubDivision (MDU-050)
Construction of Breast wall in Km 5/10 of Iyerpadi to Join Km.3/2 of Stanmore - Sirukundra road
Widening and Improvements Construction of Retaining walls on Government Roads in Sankarapuram Highways C and M Sub Division TVM 88
Package 105 Construction of Retaining walls and Slab Culverts in MDR Roads of Kodaikanal Highways C and M Sub Division
Providing slope protection, Widening and Strengthening, Reconstruction of Box Culvert works in Kancheepuram (H) C and M Sub Division Jurisdiction (CHN 038)
Providing Retaining Protection wall on the South side of Cooling Water Open Channel for Unit 1, 2 and 3 chainage from CH 850 to CH 900 m from outside of peripheral compound wall at TTPS.
Salem District - P.N.Palayam Block - Providing Protection wall at Km 7/9 - 8/0 in Pagadupattu - Kariyakovil Road to Kerangadu (via) Mudavankovil, Kunnur, Adiyanur road road P.K.Hills Keelnadu Panchayat - SFC(DP) -2025-2026 Work No.06