Loading…
Loading…
284 results • Best match
Construction of Road from Pagak to Gateh Village under Payum Circle in Siang District of Arunachal Pradesh Ph I. Location Payum Circle Siang District
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture GSB, CTB, prime coat, CFC etc.
Earthwork, Sub-Grade, GSB, CTB, MSS,CD, HPC,Protection wall, pucca drain etc
C/o CC road
Repair of internal road towards house side road for boys and girls, generator side and group D Staff qtr side, Principal Qtr to mess side & water proofing treatment of girls hostel and part portion of senior boys hostel and other buildings at JNV, Bordumsa, Dist- Changlang, Arunachal Pradesh. (SH: Miscellaneous works)
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, GSB, WBM, BT, CDs, Drainage and Protection Works
Earthwork, GSB, Cross Drainage, CC Drain, protection Wall etc
Road Works, Culverts and Protection Works
FC, GSB, WBM-III, BT, CDs, Protection wall, Road furnitures etc.,
RENOVATION AND RE-CARPETING OF THE EXISTING INTERNAL ROAD OF 20TH BN ITBP, AALO, ARUNACHAL PRADESH
Construction of Vending zone at Sabji Mandi, District library and children E-learning center, Junction Beautification, APST Bus Depot (Retrofitting and Enhancement), Internal roads retrofitting of Bakin Pertin Hospital and Urban PHC
Construction of road from km 87.130 to km 121.541 of Taliha-Tato section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 113.25 to km 160.75 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 35.580 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 130.125 to km 156.095 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 168.000 to km 183.400 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 43.65 to km 85.60 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 43.65 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 85.60 to km 168.00 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 55.725 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 78.38 of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 55.725 to km 113.25 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 160.75 to km 209.90 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of Road
Construction of road
Construction of road.
Construction of road
Road work
Road work
Construction of road from km 70.000 to km 113.000 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD TAWANG- WOMINGLA- KUMROTSAR FROM KM 0.000 TO KM 40.000 TO NHSL SPECIFICATION IN SECTOR OF 120 RCC/ 763 BRTF/ PROJECT VARTAK
Construction of road from km 113.00 to km 167.75 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 19.554 to km 70.000 of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
FC, Sub-Grade, GSB, WBM 3 , PMC with seal coat, CD - 1.5 Mrtr. span , Protection wall and pucca drain etc.
FC, GSB, WBM, BT, CDs, Drainage and Protection Works
EOI invited for association as Joint Venture and Subcontractor from Experienced Agencies for Construction of road packages invited by MORTH in the state of Arunachal Pradesh State on EPC Mode Total 10 Packages
Repair of internal road towards house side road for boys and girls, generator side and group D Staff Qtr. side, Principal Qtr. to mess side & water proofing treatment of Girls Hostel and part portion of senior boys hostel and other buildings at JNV, Bordumsa, Dist - Changlang, Arunachal Pradesh. (SH : Providing services for running Govt. vehicle No.AS 01- MA 3535 for DDSD, CPWD Office)
Jungle Clearance, FC, CDs, Protection Works, NFSSB, CSB, BC, CC Drain, etc.
GSB CTB SDBC Protection Work CDs Side Drain and road furniture
GSB CTB SDBC Protection Work CDs Side Drain and road furniture
FC, GSB, WBM, BT, CDs, Drainage and Protection Works
Widening, GSB, WBM-III, Prime Coat, Tack Coat, MSS , P/Work CD , drains and road furniture etc.
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR CONSTRUCTION OF ROAD HAYULIANG CHAGLOHAGAM FROM KM 0.00 TO 57.75 TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE
PREPARATION OF DPR INCLUDING LAND ACQUISITION AND FOREST CLEARANCE FOR CONSTRUCTION OF ROAD TUNGRI SAMCHUNG TSELA MAGO FROM NEW TO NHSL SPECIFICATIONS (INDICATIVE LENGTH 60 KMs) UNDER PROJECT VARTAK IN STATE OF ARUNACHAL PRADESH
road work and bridge
CONSTRUCTION OF SECURITY TRACK ALONG BOUNDARY WALL AND RE-CARPETING OF THE INTERNAL ROAD AT 10TH BN ITBP, KIMIN, ARUNACHAL PRADESH
Construction of Border Fencing and Road between BP No. 2353 to BP No. 2354/25S in the state of Mizoram along Indo-Bangladesh Border (Length-6 KM) Pkg-II
GSB CTB SDBC Protection Work CDs Side Drain and road furniture
GSB WBM_II III MSS Protection Work CDs Side Drain and road furniture