Loading…
Loading…
284 results • Best match
FC, GSB, WBM, BT, CDs, Drainage and Protection Works
GSB WBM_II III MSS Protection Work CDs Side Drain and road furniture
Geotechnical investigation and Road construction material investigation for Preparation of DPR for Approach Roads and Bridges at Kalai-II (1200 MW) HEP, Hawai, Anjaw District, Arunachal Pradesh
Construction of road from km 0.00 to km 27.430 (Package-1) of Bile- Migging section (Km 0.00 at Bile) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
CONSTRUCTION OF ROAD KIBITHU KUNDAO FROM KM 0.000 TO KM 52.000 DESIGN LENGTH 0.000 TO 19.557 KMS GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN ANJAW DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Construction of road from km 17.812 to km 55.377 (Package-2) of Bile- Migging section (km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA FROM KM 0.000 TO KM 56.000 (DESIGN LENGTH 56.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN UPPER DIBANG VALLEY DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Construction of road from km 0.000 to km 17.812 (Package-3) of Bile- Migging section (Km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Road Construction
Formation widening, RCC culvert, Pucca side drain, Protection wall, Sub Grade preparation, Shoulder, GSB, WBM III, PMC, Setting out, Road Furniture etc.
RETENDER FOR ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR CONSTRUCTION OF ROAD GUMPA SIMBI H/SPRING JACHEP FROM KM 0.00 TO 69.00 TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE
Road Construction work
Road Construction (CTB)
Road Construction (CTB)
widening , Sub-Grade, ANT Soil -cement stabilization (layer-I, II), PMC with seal coat, CD structures , Protection wall and pucca drain, road furniture etc .
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR CONSTRUCTION OF ROAD MALINYE BALUA KAPUDA NET LENGTH 78.00 KMS GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF (P) UDK IN ARUNACHAL PRADESH STATE
The work includes construction of new road. The scope includes formation cutting, Non Bituminous and Bituminous courses, protection wall, Culverts and Drains.
Formation Cutting, Pavements works, Cross Drainage Works, Protection Works, PCC Side Drain, Road furniture etc.
Formation Cutting, Pavements works, Cross Drainage Works, Protection Works, PCC Side Drain, Road furniture etc.
GSB CTB SDBC Protection Work CDs Side Drain and road furniture
Construction of road from Damroh to Various Horticultural and WRC area.
Jungle Clearance, Formation Cutting, GSB, WBM, BT, Culverts, Protection works, CC Drain, Kutch Drain
BUG bridge
C/o Left Over work of 6 Nos of Type-IV Special Flats in the staff Quarters Zone of NIT Nagaland i/c water supply, sanitary installation, Road work, Septic Tank 100 users & Underground sump of 50000 litres capacity .(S.H: Providing one number computer operator for the khatkhati Central Electrical Sub-Divsion ).
Earthwork, CD Structure, CC Drain, Pavement
Bridge Length - 40.00 Mtr.
Construction of Road from MV road near Assam Rifles Camp to Miao Singpho Village in Changlang District under CRIF
Construction of Road and Bridges between Likabali and Kangku Phase I SH Construction of 150.00 Metre Steel Box Girder Bridge
SUPPLY AND STACKING OF STONE AGGREGATE 63 MM STONE AGGREGATE 45 MM STONE AGGREGATE 22.40 MM STONE AGGREGATE 11.20 MM STONE AGGREGATE 6.70 MM AND SAND FOR CONSTRUCTION OF 1.484 KM INTERNAL ROAD TO NHSL SPECIFICATIONS AT ARMY CAMP IN 2 MTN DIV SECT
The Construction of road components consists of laying of GSB, WBM-II, WBM-III and MSS, Road furnitures and CDs Structure.
Bridge Work
The Construction of road includes earthwork in widening and filling and the components consists of laying of GSB, CTB and MSS and other CDs Structure.
Part Development Work (STP, Sewerage Line, UG Tank, Pump, water distribution, DG set, street light, air conditioners along with a part of Road Work) for BSF Sedata, Bhuj.
SUPPLY AND STACKING OF STONE BOULDERS, STONE METAL 40 MM, STONE CHIPS 20 MM, STONE CHIPS 10 MM an SAND FOR PERMANENT WORK FOR CONSTRUCTION OF ROAD JAIRAMPUR LONGVI FROM KM 0.00 TO 3.50 TO NHSL SPECIFICATION TO CONNECT COBS OF ASSAM RIFLES AS PER MORT