Loading…
Loading…
284 results • Best match
Construction of road from Phadam village road to Tsengsa Bompa under Dirang circle
Construction of road from Khoina Village to Sothung under Chhalwo circle, West Kameng Distric
AAI Project Office Road work repair work at Donyi Polo Airport,Hollongi,Itanagar
Construction of road from Komsing Bridge point to Mopit Village under Siang District (Phase-I
Construction of road from Mindi Yorbe to Government Model College, Geku in Upper Siang District
Foundation, Sub-structure, Super Structure Approach Road, Protection works etc
Foundation, substructure, Superstructure, Protection Works, Approach Road and Retaining Wall
Foundation, Sub structure, Super Structure Approach Road, Protection works etc
C/o SEs Office Building Cum Residential Buildings for Newly Shifted Subansiri Basin to Ziro in Lower Subansiri District (SH - Site Development for SE Office Building, T-III and T-V Qtrs., Formation Cutting, WBM and CC Pavement for Approach Road etc.)
C/o Road from PMGSY Road Bikh village-Tom Miya Panchayat via M.E. School Miya village and PHC Miya village under Deed Circle in Lower Subansiri District
Construction of Road from Palatari to Subu (L-15 Km) under Thrizino Circle,West Kameng District.
Construction of road from Kodum CO Hqr to Bam Trijunction 16.50 Km under West Siang District
Construction of Road from Dibbin Mathow road to Sirilang CO HQ in Bichom District (CMCSRDP-II)
Foundation, Substructure, super structure, protection works, Approach road and Retaining Wall
Jungle Clearance, foundation, substructure, superstructure, approach road and river training works
Improvement of road from 9th mile point of Bomdila-Tawang road to Salari-Nafra road (36 Km) in West Kameng district (Phase I) 0.00 Km to 20.00 Km under Economic Importance scheme in the state of Arunachal Pradesh.
Construction of road from BRTF road to Liging area in Komkar in Upper Siang District (Phase I)
Construction of Intermediate CC Pavement Link road from NH-515 to Tabi Diking road (L-3 Kms) in East Siang District. SH - CC Pavement, RCC drain, Box culvert, protection works and embankment.
Development of new A site Retail Outlet at NEW RO AT WITHIN 2 KM FROM RAJGARH CHARIALI TOWARDS BALIJAN ON PMGSY ROAD, Village-DULANE, District-PAPUMPARE, State-ARUNACHAL PRADESH
Construction of Arch Bridge across Krosam River on Road from PMGSY Road (Halaikrong) to staging Hut Krosam in Hawai-Walong Block of Anjaw District (A.P) under VVP (Span-50.00m)
Upgradation of Approach Road at Janaching Village in Bichom District, Arunachal Pradesh
C/o Approach Road to power house, Bailey Bridge (span 20 m), Staff Quarters (Type-III-2 nos. and Type-II Double storied four units-2 nos.), Compound Wall and Retaining Wall w.r.t Paley MHS (2 x 250 kW) near Tali ADC Hq, Kra Daadi District.
INSTALLATION COMMISSIONING MAINTAINING AND MONITORING OF GPS BASED VEHICLE TRACKING SYSTEM ON HIRE BASIS IN KEY MACHINERY AND EQUIPMENT ENGAGED IN EXECUTION OF ROAD WORKS UNDER PMGSY III IN ARUNACHALPRADESH
Construction of road from NH-15 to Namsai Circuit house road via Multipurpose Cultural Hall Namsai (Ph-I)
Construction of Development works Internal Road and Path i.e. Cement Concrete pavement and foothpath storm water drains parking for vehicles SITC for sub station DG Set STP Plant and illuminated signage at 57th BN ITBP Aalo Arunachal Pradesh
WIDENING IMPROVEMENT OF ROAD KAYING TATO FROM EXISTING CL 09 ROAD TO NHDL SPECIFICATIONS FROM KM 47.85 TO KM 66.600 (DESIGN CHAINGE KM 45.800 TO KM 62.850 TOTAL LENGTH 17.05 KM) UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE (EPC) PK
Foundation, SubStructure, Protection Works, Dismantling of existing Bridge structure, Approach Road and Retaining wall
Construction of Bridge across Eachi Nallah on Road from 17.2 Km Pt of PMGSY Road to Cheppe to Adane in Anelieh-Arzoo Block of Dibang Valley District (A.P) under VVP (Span 25.00m)
Construction of Bridge across Iyee Nallah on Road from 17.2 Km Pt of PMGSY Road to Cheppe to Adane in Anelieh-Arzoo Block of Dibang Valley District (A.P) under VVP (Span-18.00m)
Construction of Bridge across Enjoh Nallah on Road from 17.2 Km Pt of PMGSY Road to Cheppe to Adane in Anelieh-Arzoo Block of Dibang Valley District (A.P) under VVP (Span 18.00m)
Construction of Bridge across Eithu Nallah on Road from 17.2 Km Pt of PMGSY Road to Cheppe to Adane in Anelieh-Arzoo Block of Dibang Valley District (A.P) under VVP (Span 18.00m)
SUPPLY AND STACKING OF STONE AGGREGATE 40 MM, STONE AGGREGATE 20 MM, STONE AGGREGATE 10 MM AND COARSE SAND FOR PERMANENT WORKS (PART-A) AND STONE AGGREGATE 26.50 MM DOWNGRADED, 13.2MM DOWNGRADED, 6.7MM DOWNGRADED FOR INTERNAL ROAD 77 RCC/23 BRTF
Construction of Road from BRTF road near Warjung Village to Mantruk Village below RR Hill at Bomdila, West Kameng District
Construction of Road from Supyu Village to Pyuchi and Pyuth Village at Old Ziro in Lower Subansiri District (Ph-I)
Construction of Road from Yak Farm via Nyukmadung village to newly created CO office, Nyukmadung, Brangthangka (Ph l) (CMCSRDP II).
SUPPLY AND STACKING OF STONE BOULDERS, STONE METAL 40 MM, STONE CHIPS 20 MM, 10 MM AND SAND FOR PERMANENT WORK AS PER MORTH SPECNS FOR CONSTRUCTION OF ROADS CHANGLANG-RANGLUM BETWEEN KM 0.000 TO KM 30.500 ALONG INDO-MAYANMAR BORDER (IMB) (3rd Call)
Formation Cutting, RCC Slab Culvert, Pucca Side Drain, Protection Works, Sub Grade Preparation, Shoulder, NFSSB,CSB, Prime Coat, Tack Coat, BC, Setting Out, Road Furniture etc
PROVIDING HMP OF BITUMEN VG-10 TACK COAT WITH BITUMEN EMULSION LAYING BY PAVER AND COMPACTION OF BC 30 MM THICK/ 40 MM THICK INCL CORRECTION WORK WITH DBM 50 MM THICK AND APPLYING PRIME COAT, THERMOPLASTIC PAINT FOR SURF ON EXISTING ROAD IN PROJ BMK
Construction of Road from Mohan Camp to Dudri via DirmeR West Kameng District under RIDF-XXVIII (SH- Road Portion) (Package -A).
Foundation, Sub-Structure, Super Structure, Wing Wall, Retaining Wall, Protection Work, Approach road, CC Drain etc
Road works
Embankment /Formation Cutting, RCC Slab Culvert, Pucca Side Drain, Protection Works, Sub Grade Preparation, Shoulder, NFSSB,CSB, Prime Coat, Tack Coat, BC, Setting Out, Road Furniture etc
FC, Pucca Side Drain, Earthen Drain, CD works, minor bridge, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc.
Construction of Road from Rikung in Upper Subansiri District to Tedung via Pilua in Kra Daadi District (L-60.00 Km)Ph-IV.
Construction of Road from Bana EAC HQ to Richukrong CO HQ via Old Sopung, Chijang-Kajung Village, East Kameng District (22 Km.)
PROVIDING, LAYING, BM 50 MM, BC 40 MM THICK (HMP MIX), APPLYING TACK COAT, ROAD MARKING, ROAD STUD AND BERM FILLING ALL AS PER MORTH SPECIFICATIONS ON ROAD TEZU(TCP) LOHITPUR SHIVAJINAGAR TEZU AND INTERNAL ROAD 48 BRTF UNDER 1444 BCC/48 BRTF/PROJECT
Construction of road from PWD road to Pekimodi in Upper Siang District (Length 22.11 km) under North East Special Infrastructure Development Schemes (Roads)
Formation Cutting, RCC Slab Culvert, Pucca Side Drain, Protection Works, Sub Grade Preparation, Shoulder, NFSSB,CSB, Prime Coat, Tack Coat, BC, Setting Out, Road Furniture etc
RE-CARPETING OF INTERNAL ROAD ON CAMPUS OF RTC KIMIN, ARUNACHAL PRADESH
Construction of Road from NH-713 to Nangbia Village via Kusuk Govt. Model Degree Collage and Yabang under Palin circle in Kra Daadi District