Loading…
Loading…
284 results • Best match
Jungle Clearance and Construction of approach road to proposed ITI site at Tato Shi Yomi District Arunachal Pradesh
C/o Approach road from Upper Lapang Hati Colony to Lower Lapang Hati Colony, ltanagar in Papumpre district
C/o New circuit house at Dirang including compound wall approach road and parking area, West Kameng District.
Construction of Type- II 4 Nos Quarters with Approach Road and Compound Wall for Circle Office at Sago
C/o Approach link road from Jully road to Dokum Putung Jullang, Itanagar
Improvement of road from Rumgong ADC HQ to NH-13 at Patum (CMCSRDP-II)
Improvement of road from Rama Camp to new ADC HQ Dirang under CMCSRDP-II.
Improvement of road from Rama Camp to new ADC HQ Dirang under CMCSRDP-II
Strengthening of road from Km. 30.180 to 49.250 on NH-13 under EPC Mode under Annual Plan 2023-24
SPECIAL REPAIR TO INTERNAL ROAD AT LIKABALI MIL STN UNDER GE 872 EWS
Construction of Internal road of Mirem village (5.00 Kms) in East Siang District.
Construction of link road
C/o T- I,T- II,T- III Quarter with Furnishing, Approach road and Compound Wall at SIB, Changlang.
C/o Approach road from NEC road to Community Integrated farm at Kumruk area, Kora village under Kora Circle
Construction of RCC Bridge over Ruksin river for approach road to Mini Secretariat at Ruksin in East Siang District.
Link Road to Old Heritage village Lamezin (Upper Dzang), Bichom District.
C/o Link road from Dibrik road to Najang, Bichom District
Road work
Earth work, GSB, CTB, MSS, RCC CD Structure, Protection works, Road Furniture and etc.
Repair of Internal road at BHQ of 25th Bn, ITB Police, Tezu, Arunachal Pradesh.
C/o Internal Road at Tarasso CO Headquarter Papum pare District Under CMCSRDP-II
C/o Approach Road from Two Lane Highway Itanagar Jully Naharlagun to Chentan Ghat nearby localities in Papum Pare District
C/o Bridge over Pado river in between Parsi-Parlo to Paddo village with approach road(span-60.0m) (CMCSRDP-ll).
C/o Link Road from Lobi Road to Dorko Hill under Naharlagun.
Construction and Improvement of Road from Chindang ground Dibbin to Chinglang Village in West Kameng District.
Slope Protection Works including Approach Road for prefabricated Buildings at Tato II HEP Colony Area Tato Shi Yomi District Arunachal Pradesh
Construction of Internal approach road to Multi Utility Building, PMC, Pasighat. SH - Laying of CC pavement, drainage, parking and allied works.
Construction of Approach Road for SWM Landfill Site at Jairampur Township SH Slip Clearance RRM Recarpeting Boundary Wall and R-wall.
Earthen Shoulder, GSB, WBM-III, BT, CDs, etc.
Repair and Maintenance of Road from NH-515 to PMGSY Road.
C/o Link Road from Model village to Damsite Nlg (via forest colony)
Improvement of Road from Dhahill top on Tamen-Tali Road to Gangte via Lapte under CMCSRDP-II
Improvement of road from NH-13 (Hydel tinali) to Lilong in Changlang District Arunachal Pradesh (14.50 Km)
Construction of Administrative Block, GOs Mess and Cement Approach Road at for NE Frontier, ITBP Khatting Hill, Itanagar (Ar.P.) (SH: Residual Works)
Construction for internal road from Lower Nyai to Upper Nyai under Gida village District Kurung Kumey.
C/o Approach road from Jullang(Paga Tara) to Tarh village under Papu-1 Papu Nallah (SH- F.C -2.5 KM, culvert - 7 Nos 3x3m, side drain-300 mtrs, solling -2.25 KM
Jungle Clearance, Earthwork Widening and Shoulder, GSB, WBM2, WBM3, Mixed Seal Surfacing, 1m Span RCC Culvert and Road Furnitures
Improvement of road from PWD road to Yarda village Hiya II under Nyapin Circle in Kurung Kumey district
Construction of interlocking Paver block approach road for newly constructed G plus 1 prefabricated Building in Siang Lower H E Project at Pasighat
Civil works for construction of new approach road and site development works including civil foundation upto plinth level for construction of prefabricated buildings
Additional work at PMGSY road Aalo BRO to Kangku, Lower Siang District
Earthen Shoulder, GSB, WBM-III, BT, CDs, etc
1 Improvement of approach road SH CO culvert and drain 2 CO storm water drain at polo colony from apex bank to cooperative bridge point
C/o Approach Road from PWD Road to Pitak Village, under Sangram Circle in Kurung Kumey District (Ph II) ( SH Formation cutting, widening, slab culverts).
Construction of Approach Road from Joram-Koloriang Trans-Arunachal Highway to Leel village Ph-II SH Geometric Construction R and B Wall CC Drain BT
C/o. Link road from Luthia to Soloputung via Bulik Bilalge, Naharlagun 4.00km in Papumpare District.
Strengthening of road from km 10.000 to km 29.500 of Hollongi to Itanagar section of NH 415 on EPC mode in the state of Arunachal Pradesh.
SPECIAL REPAIR TO INTERNAL ROAD FROM MT SHED TO TSS STORE AT MIL STN TEZU UNDER GE (P) LOHITPUR
C/o Road from PMGSY road Tabri Village to Changku CO HQ (CMCSRDP-II)
C/o Road from PMGSY road Lada Co Hqr to Camkampu, East Kameng District .