Loading…
Loading…
4,473 results • Best match
Consultancy services for preparation of Detailed project report for Widening-Strengthening of Kadru Diversion road (Machhli Ghar to Kadru ROB) and approach road towards Tapovan Mandir
Provision of approach road along with guard wall for the entry /exit point of all mines (at 05 Nos of RFID) under GM Unit, NK Area.
Repairing of Approach Road of WB 09 and Road from Black top NBCC Road to Main PQC Roads under Amrapali OCP of A-C Area, CCL.
Construction Of High Level Bridge With Approach Road Over Local Nala At 6th Km Of Baliapur - Patlabari Road Under Plan Head For The Year 2025-26.
Patch repair of road from Naya More under GM Unit of Kuju Area.
Repair of road near culvert near pillai dam under Gm Unit Piparwar Area.
Repair of road by PCC pavement at 16 no colony under Jarangdih Colliery
1) Strengthening of road from Musaboni Dumeria road to Ramragada. (Length 4.450 K.M.), 2) Strengthening of roads from Bhandarboro Village to Jadugora. (Length 6.060 K.M.), 3)Strengthening of road from Somaidih Kotopa to PMGSY Road via Chipagali..
Construction of PCC Road from house of Alfred Tudu on Bhindibona rural road to house of Alias Tudu in Village- Bhindibona G.P. -Basetkundi
Construction of Road and drain in (1) Bhelatand subash nagar (near university) from samendra singh house to manorma sadan via gali no. 1, 2 and link road (2) In susanilewa near DC office pcc road to Sher Ali nagar more and pcc road to Mithlesh yadav
Construction of road aziz nagar (1)rizwi lawyer to albaik hotel , construction of road and darin from dimpi house to mother heleema boundry,(2) Construction of road near umar masjid md nasir to alimansari house (3) Construction of road from r.k.marr
Improvement of Road and Drain with cover slab from baby play school to bablu house in shantinagar under Ward No-13
Improvement of Road with Bituminous Concrete at Officers Colony behind Nepal house near house No- 3/28 under ward No-45
Widening and Strengthening of Godda City Bypass From Sarkanda Chowk (NH 133) to Mission Chowk (NH 333A) Road including (i) Circular link road via Residence of DC,SP,DJ Godda and (ii) Canal Link road (Total Length- 4.37 Km)
RWD/KHUNTI/09/2022-23, Strengthening of Road from Khunti Ganaloya Main Road (Banai River Bridge) to Murhu Chaibasa Main Road via Gajgaon Chamratoli (L-6.01 Km
Widening and Strengthening of road from Bachra Petrol Pump to Area hospital Piparwar and up to Jhulla pool through 04 no. ground under GM Unit, Piparwar Area
RWD/HAZ/STPKG/05/2023-24 Strengthening of Road from (i) Road from T05 Basantpur to Lakhnu (L -2.050 Km.) (ii) Banjhia to Dhothwa (L - 15.930 Km.)
RWD/SAHEBGANJ/05/2023-24, Construction /Strengthening of Road from Srighar Colony No. - 8 Suchitra Teli Houses to Haripad Thakur Houses via Battu Ghat (L-2.500 Km.)
RWD/RANCHI/ 10/2021-22, Strengthening of Road from Mcluskiganj Munna Agarwal House to Main Road via Konka Viaage and Upto Thana via Substation (L-4.00 Km.)
RWD/BOKARO/24/2022-23, Widening Strengthening of Road from Niche Beldanga Petrol pump to Paludih Sidhu Kanhu chowk via Kasitand Purni more , Madandih. (L-4.250 Km.)
Strengthening of road from km 25.00 to Km 62.00 of NH-133 under NH(O) in NH Division Deoghar on EPC mode in the State of Jharkhand
Construction of Internal Road, Peripheral Lighting and High Mast Lighting work at CTS, Musabani in the district of East Singhbhum
Construction of PCC Road from PMGSY Road to Pur soda Nala (L-220.00M) Block-Amrapara
Repair of Roads
Providing Concrete Approach Road from Main Road to both the Weigh Bridge including approach to level crossing at Jarangdih Railway Siding under AKK OCP of BnK Area
Construction of Approach Road Service road to IIAB Road (Total Length 400m) ( Including Utility Shifting and Plantation) Under Road Division Ranchi (Gramin) for the year 2025-26
Repair of approach road, gate, guard, room and replacement of damaged roof sheet of underground sump at DG shed near jhulla pool under Gm Unit Piparwar Area.
Construction of PQC road from Slurry Pond to BRO Weighbridge extended up to main approach road junction, via Road Sale Weighbridge at Kedla Washery under Hazaribagh Area
Construction of Drain,Plinth Protection, Approach Road and Land Levelling Work in Newly Constructed 02 Nos. of Barrack at Mandal Kara Gumla In The District of Gumla
Construction of WBM approach road at Nima side with providing and laying of Hume pipe along peripheral earthen drain of OB dump rehab site under Rajmahal Area.
CONSTRUCTION OF RCC CULVERT GUARD WALL AND APPROACH ROAD AT JAMBANI NALA IN BETWEEN VILLAGE KESARDA TO KALAPATHAR UNDER PANCHAYAT - KESARDA, BLOCK- BAHRAGORA, DIST -EAST SINGHBHUM JAMSHEDPUR.
Providing and fixing chain-link fencing on Dam approach road, sweeping of dam road, cleaning of toe drain including cutting of bushes of Panchet Dam, DVC Panchet
Repairing of Car shed and Development of approach road and courtyard in Qtr. No.D-11 and 12 in Sangam Vihar colony, Bachra under A-C Area, CCL.
Providing guard wall on one side of existing culvert of approach road of Bishujhapa colony and repairing of drain at Bachra Bazartand under Gm Unit Piparwar Area.
Making of approach road with provision of hume pipe for proposed 100 te W.B. no. 18 near Chamatu Patch under Magadh OCP of M-S Area, CCL
Repairing and extension of LT 440V line with reference to modified haul road line from 4 pole junction to EKG 551 approach road under AKKOCP, BnK Area.
Construction of approach road from byepass road of Power House to 100 MT weigh Bridge near Ash Silo including development of bulker parking bay and its drain
Custom Bid for Services - Lighting Arrangement at approach road at CTPS Chhatt Ghat during Chhatt Puja 2025 Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Construction of road from NH-32 to SLG siding under Govindpur Area
IRQP Strengthening work i Sonari Marine Drive Fagu Baba Shamshan Ghat to River Meet Main Road via Jogers Park and link road Sonari Central Puja Committee to near Carmel School LIC Colony and link road ii Sonari 7 No Extension H
Consultancy Services for Preparation of Detailed Project Report for strengthening and widening of road from Koderma to Jamua in Koderma District including Replacement of Culverts and Bridges Proposal for Construction of new Culverts
Repairing of 10 inch dia MS Pipe at mainpatch damaged by grader and payloader during widening of road and fabrication of 10 inch dia MS flange from scrap plate at Phularitand AMP Colliery.
Ordinary repair of road at Km 58(P) to 93 (P) of NH-333A
Improvement of road with bituminous surface at babu lane from church lane to club road and kalal toli under Ward No-15
RWD/HAZARIBAGH/13/2022-23, Strengthening of Road from P.W.D. Main Road Patra Main Chowk to Manatu, Manatu Approch Road via Jamira, Pahra, Ghaghra Dam (L-12.000 Km.)
CERTAIN REPAIR TO INTERNAL ROAD INCL ROAD SIDE DRAIN AND FOOTHPATH AT VARIOUS UNITS AREA UNDER AGE BR I GE RANCHI
Construction of WBM road from existing WBM road to loading way haul road near new water filling point and approach road for new water filling point under ROCP.