Loading…
Loading…
4,473 results • Best match
Repair of road in Anand Vihar Colony under GM Unit Piparwar Area
Repair of road of BOCM colony under CHP CPP Project Piparwar Area.
Repair of road near welfare chowk bhelwatand under GM Unit Piparwar Area.
01/WRD/WWDNO1/CKP/SBD/01/24-25 Repair and Maintenance of Head Works, Construction of Service Road and Approach Road under Jenasai reservoir scheme
Levelling and dressing of approach road Tisri Nallah from Karipani colony to kalyani and C-type colony to Damodar river and Turiyo under SDOCM Project.
Repairing and Maintenance of MH light Approach road Chat Ghat Near IWSP and repair and rewiring of Central Durga Mandap , Kargali gate of BnK Area
Repair and Maintenance of MRSS substation including approach road and provision of bathroom at MRSS substation situated at Kargali Bazar under GM unit Dhori area.
Providing and Fixing paver block, Making PCC approach road and LMV shed and other development work in GM Office premises under A-C Area, CCL.
Painting of inspection walkway, operation walkway and other steel structure for dam gate and repairing of approach road towards Gallery under Dam Division, DVC, Maithon.
Construction of PCC approach road form Ishwar Marandi Nagar Simra rehab site (Near Bajrang Bali) to towards Tetaria village through Ghat Simra village.Under Rajmahal Area.
CONSTRUCTION OF 02 SPAN BRIDGE BETWEEN VILLAGE KULAWA TO CHAMPALA AND CONSTRUCTION OF 200 FEET APPROACH ROAD), PANCHYAT-ANDHARI UNDER BLOCK KUMARDUNGI, DISTRICT- WEST SINGHBHUM
Repair and Approach Road by providing PCC Pavement near S K Singh quarter to R K Singh at Nichu Para under GM Unit BnK Area
Extension, diversion cum re organisation of the 220 V OH line needed for proper illumination of the approach road and the A Patch Pump location
Extension, diversion cum re organisation of the 220 V OH line needed for proper illumination of the approach road and the A Patch Pump location.
Construction of High Level Bridge over Baskijore Nala at chainage 5th km in Sarath - Chitra Road (including construction of approach road) under Road Division, Deoghar
Strengthening of road from km 62.650 to 73.000 of NH-100 on EPC mode under NH(O) in the state of Jharkhand (Job No. - NH-100-JHR-2021-21/294)
REPAIR/ MAINT INCL RECARPETING OF ROADS AT VARIOUS LOC IN MORABADI AREA UNDER GE RANCHI AND CERTAIN REPAIRS TO INTERNAL ROADS AND FOOTPATH AT JAMSHEDPUR MIL STN UNDER AGE B/R-I, GE RANCHI
REPAIR/ MAINT INCL RECARPETING OF ROADS AT VARIOUS LOC IN MORABADI AREA UNDER GE RANCHI AND CERTAIN REPAIRS TO INTERNAL ROADS AND FOOTPATH AT JAMSHEDPUR MIL STN UNDER AGE B/R-I, GE RANCHI
Improvement of Road and Drain with Cover Slab from Hassan to Bablu house in Shanti Nagar under ward No 13
Improvement of Road with Bituminous Road Surface and RCC Drain in Vrindavan Colony Road No-3N under ward No-04
Construction of R.C.C Culvert In, Mango ward No-9,Jawahar nagar road no.13 ,Besides Md. Ganni house to Israr Khan house and cross road with slab with widening of road
DIVERSION OF 440V DOMESTIC OVERHEAD LINE AT BILBERA BASTI DUE TO WIDENING OF ROAD FOR GOING RAM RAJ MANDIR AT CHITAHI DHAM FROM SAFETY POINT OF VIEW AND MISC. REPAIRING KHASTUNDOO
Construction of R.C.C Culvert In, Mango ward No-9, Jawahar nagar road no.6 Kutkut dungri ,Piter kacchap house to main drain with Slab and cross drain to widening of road
For widening of Road by R.C.C Drain With Slab, Blacktop Road and paver block in Mango ward no.9, Chandrawati nagar from Nilkamal jha house to NH33 and diff. cross road.
Construction of widening of Road by R.C.C Drain with Slab In, Mango Ward no-10, Road no-1 from Mahabir House to Tutun via Durga Dutta via and Different Cross Road.
RDD(RWA)/EE/JSR/01/2021-22 STRENGTHENING AND WIDENING OF ROAD FROM GHORABANDHA RADHIKA TOWER TO INDRAJIT BROTHERS AND ELECTRONIC SHOP VIA P.K.UPADHYAY HOUSE AND CONNECTING ROADS. (LENGTH-1.000 KM.).
Reconstruction of Hanwara Bajar (Bihar Border) Link Road (Total Length- 0.411 Km) under Road Division, Godda
RWD/DHANBAD/30/2022-23, Widening and Strengthening of Road from Baghmara Panchayat, Gudlibhitha Mantu Mahato Dukan to Joriya via Chlak tola Road (L- 2.00 Km.)
RWD/DHANBAD/ 09/2022-23, Widening Strengthening of Road from Baliapur-sindri main road Guritand basti to Asanbani via Kherban kushberiya and Gariyaghatu. (L-4.550 Km.)
Reconstruction and Widening/Strengthening of Road from Nonihathwari Bridge-Sitphari (on Sitphari-Sigri-Harko PWD Road) Road (Total Length - 7.550 Km) for the year 2022-23
RWD/GODDA/21/STPKG/13/2023-24 Strengthening of Road from (i) Basuara Village (L- 1.000 Km.), (ii) Salim Khuthahri to Belwa (L-3.850 Km.) ETC.
RWD/GIRIDIH/STPKG/30/2023-24, Strengthening of Road from (i) Amnari to Baledih (L-7.30 KM) and (ii) Chatro to Fulchi Road (L-8.90 KM)
RDD(RWA)/BOKARO/11/2019-20, Strengthening of Road from Mahuatand Bhaga More to Vill. Chugnu Transformer via Mahuatand Thana Chowk, Baridih Tirla (L-10.250 Km.
RWD/SRK/01/2020-21, Strengthening of Road from Main road Jamjora Chowk to Dumra Mahuldih main road via Kuldih, Basurda, Itagarh, Patri. (Length-8.10 K.M.)
Repair work of Boundary Wall, Internal Road and Main Gate at Fire Station Latehar in the district of Latehar.
DIVERSION OF 6.6 KV OVERHEAD LINE BELOW NEW DEPARTMENTAL VIEW POINT TO FREE THE AREA FOR HAUL ROAD WIDENING FOR COAL PREPARATION AT AKWMC UNDER KATRAS AREA
Construction of PCC Road PMGSY Road to Paragana Murmu House (L-300.00M) Block- Amrapara
Construction of PCC Road from PMGSY Road to Sankar Prasad Bhagat House (L-300.00M)
ROAD WORKS FOR AMMONIA-UREA FERTILIZER PLANT AT HURL, SINDRI
Facility Management Services - LumpSum Based - Industrial; Repair of drain adjacent to Shaft 04 approach road; Consumables to be provided by service provider (inclusive in contract cost)
Improvement of Riding Quality Programme (IRQP) in Namkum- Doranda road (MDR-002) (Including Nepal House Approach road) (Total length-6.40 KM) for the year 2022-23.
Marking of Property Boundary line both side of 4 - Lane approach Road from chandwara NH-33 to Main gate complex by concrete pillar at DVC, KTPS.
Construction of PCC Road, Filling of stone Dust, GSB near Sarovar Nagar Chhath Ghat and on approach road in Different ward No- 31, 32, 33, 34
Construction of HL Bridge over Telo River (with approach road) at Chainage 279 km (new chainage 255 km) of Govindpur Sahibganj Road under Road Division, Sahibganj
Re-organisation of 3.3 KV and 440V OH line with installation of 250KVA transformer including its related accessories at Rehwa ghat approach road under Kargali OCP.
Provision of check rail in three nos Railway track line and both side PCC pavement of both side approach road at Railway siding under Jarangdih Colliery
Making PCC approach road from Shivpur Railway Siding to Parsana Middle school via. Parsana Village (L-600.00m and width-3.00m) under Amrapali OCP, A-C Area.
Repair of approach road for light vehicle on both sides near check post at Lions club more and at CMPDI more under GM Unit Piparwar Area.
Construction of High Level bridge over local river in chainage 10th KM of Hindolabaran to Kunda road (with construction of approach road) under Road Division Deoghar
Stone metal laying/spreading and concreting work in 132 kV side Transfer Bus to approach road adjoining area of switchyard at 132/33 kV GSS, Jadugoda