Loading…
Loading…
9,641 results • Best match
KR Thoppur SS - Improvement to the existing damaged approach road by Providing RCC road from 230KV to 110KV yards for the chainage of 175.00m to 350.00m in KR Thoppur at
Construction of PCC retaining wall along the boundary of EB land on both sides of approach road to tail race of Barrage Power House III at Kuthiraikalmedu Chainage 380m 635m
Construction of Cable duct in 110 kV yard upto newly constructed control room and road crossing culvert for the control room approach road in the existing Valinokkam 110 kV SS
Improvements to riding quality including Construction of Minor Bridge Protective wall and Approach Road in Lieu of Existing Causeway Works in the Government roads of Vathalagundu Highways CandM SubDivision MDU044
Construction of PCC retaining wall along the boundary of EB land on both sides of approach road to tail race of Barrage Power House III at Kuthiraikalmedu Chainage 0m 380m
Renovation of damaged concrete structure using micro concrete DEKGUARD under LC condition, providing yard RCC retaining wall, yard metal spreading and approach road, etc., in the existing Kadaperi 230 KVSS
FORMATION OF CC ROAD TO THE APPROACH ROAD FOR DOG SHELTER INSIDE THE ABC CENTRE CAMPUS AT S. NO. 13 OF CHETTIMEDU VILLAGE IN DIVISION - 17, UNIT - 4, ZONE 2
Construction of Office Building cum Residential complex unit for Subsidiary Intelligence Bureau at Rameswaram, Tamil Nadu. SH-1: Office building Cum Residential Buildings, Internal Road & Development works including Internal Electrical Installations, Lighting conductors, External LT service connection, DG set, Solar PV system, LAN Networking, CCTV, EPABX, Firefighting with down comer system, manual fire alarm works. SH-2: Construction of Compound wall including cross drainage works.
Improvement of road at kulakkarai 1st street, Mgr nagar 3rd street and Bajanai kovil 1st cross street in Div 188, Unit -42, Zone-14.
Strengthening to the Road from Ponnanviduthi Nainnankollai Pillayarkoil road in Ponnanviduthi Panchayat
Construction of CC Road Drain Renewal of CC Road in Ariyappampalayam Town Panchayat
Providing BT Road at WARD 1 Kalavakkam Mettu 1st Street PART and Rice Mill Road PART in Thiruporur Town Panchayat
Providing BT Road ward 15, Ward 14, Ward 7, Ward 2 area as per tender Notice and Providing Drain at Naraseepuram 1 Cr.St, Ayyan Nagar 4 Cr.Road and Boluvampatti Main Road and Culvert and Retain wall at Ayyan Nagar Main Road and Ayyan Nagar 4 Cr.Road.
Formation of By-Pass to Ambasamudram Town.
Providing paver block at Ward No.11 Mangalam Chaliyanvilai road, Maruvoor Kandansasthakovil road to Edaikattankala road, Murukarai road in Ponmanai Town Panchayat
Providing paver block road from Kulasekharam Thuckalay road to Sahaya Matha middle school (via Enchacode Mallikuli kulam) in Ponmanai Town Panchayat
Providing interlocking paver block road at Muttukuzhi road to Narikuzhi road in Ponmanai Town Panchayat.
Providing paver block at Kuzhivilai, Melancode Kattukulam road, Parayanvilai to Naduthalveettuvilai road and Kuzhialvilai Tharisuvilai road Kuppottukonam to Ooralivilai road, Thenkankoodalvilai to Mathiruvilagam road, Kavinkulam to Kovilvattom road
Strengthening of BT road at palavilai to Kakkavilai road Canara Bank Opposite to keezha sundavilai road, yesu nammodu sabai pilavilai to thanneer Panthal poovanchanthi road , singikulam to thiruganapuram road
Maintenance of Mundagambadi to Adivaram (Adivaram to Karungali Road) to 1.15 km
Tirupathur District 15th CFC (DP) 2025-26 Interlocking paver block road construction work from Manikandan house to Sampoornam house in Kottavur village, Perambattu panchayat 64m Package No.04
Construction of new substation with transformer yard and demolishing the existing substation to facilitate the construction of road and fire sump for the work of Construction of Electrical Science Block II Ground plus 6 Floors at IITMadras
Formation of new link road connecting Greenways Road (DGS Dinakaran Salai) with Durgabhai Deshmukh road through Tamil Nadu Music College
Improvements and strengthening of Bt road from Kamarajar street to Lethikulam link road via Subburayalu nagar in Moolaikaraipatti Town Panchayat
Strengthening of Block Topping Road with Culvert at Poikunam Road to Sembarampattu link Road in Sankarapuram Town Panchayat, Kallakurichi District
Strengthening of Road from Narasingapuram to Jumbuliputhur main road Km 0/0-2/7 (R-150) including 5 years maintenance in Andipatty Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from T.Subbulapuram to T.Pudur Road Km 0/550- 2/05 (R-205) including 5 years maintenance in Andipatty Block of Theni District under NABARD RIDF XXX 2024-2025
Strengthening of Road from Kamayakoundanpatty to Chellamdiamman road at Km 0/0- 2/350 (R-13) including 5 years maintenance in Cumbum Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Vattaru to Poovalacheri kanmai road Km 0/0-2/350 (R-38) including 5 years maintenance in Periyakulam Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Jambuliputhur road to lakshmipuram road Km 0/0-1/550 (R-226)including 5 years maintenance in Andipatty Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Anaikaraipatty Road to Kallar Road Km 0/000 - 2/560 (R-40) including 5 years maintenance in Bodinayakanur Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Aundipatty Theppampatty road to Maniyakaranpatty Km 0/0-2/0 ( R-11) including 5 years maintenance in Andipatty Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Bathrakalipuram to Bathrakalipuram Saralaikalam Road Km 0/00-1/580 (R-33) including 5 years maintenance in Bodinaickanur Block of Theni District under NABARD RIDF 2026-2027
Strengthening of Road from Kathirnarasingapuram-Alagapuri road to Rayavelur Km 0/0-2/1 (R-32) including 5 years maintenance in Andipatty Block of Theni District under NABARD RIDF 2026-2027
Repair and Maintenance of Cement Concrete Road at ward No. 03, Old shandy Pettai treet in Mulanur Town Panchayat.
Multifunction Machine MFM (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), Toner Cartridges/Ink Cartridges Consumables for Printers (Q2)
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank ,sewer line arrangement , bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
FORMATION OF CC ROAD TO THE APPROACH ROAD FOR DOCTOR ROOMS INSIDE THE COW SHED and ABC CENTRE CAMPUS AT SNO13 OF CHETTIMEDU VILLAGE IN DIVISION 17 UNIT 4 ZONE 2
- KR Thoppur SS - Improvement to the existing damaged approach road by Providing RCC road from 230KV to 110KV yards for the chainage of 0.00 to 175.00m in KR Thoppur at 400
Construction of Control Room building with electrification septic tank ,sewer line arrangement ,bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank , sewer line arrangement , bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Widening, Improvements and Improvements to Riding Quality, Approach road, Reconstruction of Minor Bridge, Culvert, Construction of Culvert, Retaining wall and Drain works in the Government roads of Vadipatti Highways CandM SubDivisionMDU015
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall,
Construction of Control Room building with electrification septic tank sewer line arrangement bore well , Approach Road , Providing equipment plinth foundation , Transformer plinth, Construction of yard Retaining wall , Cable duct, Fencing wall
Improvement and strengthening the existing BT road from Ch.1000M to Ch.2000M from the Entrance of approach road to Lakadi branching from the Emerald Avalanche road (nearer to PH-5)
Specification for providing a new RCC approach Road to special maintenance work shop from Northern side main road leading to Central Store chainage 30to 50m at SE PEDC Perambalur office premises