Loading…
Loading…
2,858 results • Best match
Periodical repair of roads from NIT TSR Camp to Ajendra bazaar bailey bridge (Kaman mura) (L 1.35 km) during the year 2022 23 SH WBM 3, Tack coat, Carpeting, Sand Seal coat etc. (Length to be repair 0.675 Km) Group II
Periodical repair of roads starts from Indranagar High School to house of Kajal Deb via house of pallab Debnath under AMC ward no.8( length is 310.00m)during the year 2022_23 _SH_ WBM, Grouting , Carpeting, Seal coat and other allied works
1. Periodical repair of road from old Motor Stand to Rajnagar RCC bridge via Badarshaheb Bari during the year 2022-23
5. Renewal/Periodical repair of road from Kakraban - Dhuptali road to DakhinBuraghat road (Link No 036)(L 6.140km) under SJTNY Scheme
7. Renewal/Periodical repair of road from Lefunga via SB Centre to Dakma (Link No 025)(L 1.790km) under SJTNY Scheme
Maintenance of road from NH 08 to Pencharthal market approach road from Ch 0 km to 0 point 172km under PWD R and B Pencharthal Sub division during the year 2021 22 SH WBM Carpeting seal coat
Maintenance of road from Agartala_Udaipur_Sabroom road to Madhya Laxmibill via Ras Angan upto bye pass bridge Length 1point03 km including approach road of NH08 from byepass bridge at Madhya laxmibill Length 0point07 km_Total length 1point10 km durin
Strengthening of DCLF, Nalicherra, Livelihood Generation and value Additional chain in piggery sector based on DCLF, Nalicherra Construction or Renovation of approach Road along with Inter Road Facilities House to House and Shed to Shed GR-II
Construction of 01 no. Chemical house cum office room inc Construction of approach road and Boundary wall attached with innovative scheme at Karlam Para under Darchawi VC within the jurisdiction of Kumarghat Block under DWS Division Kumarghat
Mtc. of road from NH 08 (Chandul tree) to Railway approach road via Chakraborty Para (Length 0.55 km) under Matabari block, Gomati, Tripura / S.H GSB, WBM, Carpetting, and allied works during the year 2024-25 (2nd Call)
Mtc work inside Visvesvaraya Complex Kunjaban Agartala West Tripura SH Site development outside of the Data Centre building balance work of Pump house inc pump motor set partial approach road and partial drainage system inc allied works
FDR/Mtc. of road from Harina-Ailmara road to Nantu Tripura Para (L-2.36km) under PWD (R and B) Rupaichari Sub-Division during the year 2024-25/ SH - Construction of Single cell RCC Boxcell, approach road, etc
Construction of proposed RCC Bridge over river Juri on the Kanchanpur Jalabassa Road at Ch 27.50 Km under Damcherra Sub Division during the year 2020 2021 SH Construction of Approach Road in both end of the Bridge
Improvement of Innovative Type Mini SWTP at different locations Renovation of SSF, Raw water chamber, Clear water chamber and Intake Well and providing approach road including other allied works under Rupaichari Block during 2023-24 (Gr-I).
PR Of Behliangchhip Village Approach road ( Total Length 0.65 km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH WBM,Tack coat, re-carpeting, seal coating, Pucca and Kacha drain etc.
PR Of Behliangchhip Bazaar Approach road ( Total Length 0.320 km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH WBM,Tack coat, re-carpeting, seal coating, Pucca and Kacha drain etc.
Maintenance of road from Narayanpur market to SDPO office, Court approach road (L - 0.295 km) under Gonda Twisa Sub-Division PWD (RandB) during the year 2024-25/SH- Grouting, re-carpeting, side shoulder levelling, pucca drain etc.
Development of road of Vanghmun PS approach road 1.050 Km under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Replacement of Baily Bridge by RCC Bridge over Ratacherra on MDF road in between Kanchanbari to Chowmuhani Bazar during the year 2020 21 SH Construction of Approach road of RCC Bridge by Earth filling Brick soling etc
Development of road from approach road of Kanchanpur Pig Firm, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Laying of underground cables including street lighting and associated repair of road works in EPC mode including DLP of one Year
Special mtc. of Internal road of Dhalai District Head Quarter Complex during the year 2022-23 / SH- Providing re-carpeting, seal coating in/c repair of patches (3rd Call).
Construction of 08 (eight) nos. staff quarter Type-I quarter- 04 Units..under NHMSH Construction of Internal road from Burakha PHC to Quarter under Burakha PHC Length 0.20 Km
SH -Dismantling and erection of bailey bridge from Manughat to Amlighat Road (Ch.8.30km) to Bankul Puran Bazar to Chalitabankul H.S. School link road at Ch.0.05km over Manu River.
Periodical repair of PMGSY Road from Killa to Dakbari (T-02,Part-II) (L 8.19 Km) during the Year 2022-23.(Gr-II).
SH - Pucca drain, RCC drain, CC block protection work, earth filling, turfing with sods etc. during the year 2022-23.
Improvement of road from Kopali para to Industry Bazar-Mantala raod during the year 2025-26/SH GSB, WBM-II, WBM-III, Carpeting, Drain , CD, Retaining wall etc(L-1.50 KM)
Improvement of road by CC road , rcc slab beside Raghu Sakti Das house to beside Manna Ahamed house, Rangkang at ward no-09 under ANP area during the year 2023-24
Improvement of road from Noorpur Trijunction to Baburbazar via Sultanpur including road from Sultanpur to Tillabazar-Baburbazar road L - 2.96 km under RIDF - XXIX of NABARD. Job no. TPCOM185 2023-24
Improvement of road by paver block retaining wall pucca drain with RCC slab from the H.O Lt. SubhasSarkar to near the H.O RakhalShil near Usha Bazar, under ward no.02, AMC
Const. of RCC protection wall and improvement of road paver block starting from H/O Sri Babul Saha to H/O Sri BabanSaha at Nabinpalli Shiltilla under ward No 43,AMC
Improvement of road by drain, paver block, slab and allied works from the H.O Gautam Debbarma to Ratan Debnath and Partha Chakraborty house to Dhruba Banik under Ward No-18, AMC
Improvement of road by CC road beside Swadesh Das house to PWD Carpeting road in front of Cosmos Club at ward no-09 under ANP area during the year 2024-25
Road Side Drain etc
Mtc. Of road from Ramthakur college to Icha Bazar and D.D.Stadium link road S.H Patch soling patch metaling, carpeting, grouting etc. during the year 2020 2021
Construction of 1000 MT Rice Godown at Kakraban under Kakraban Agri Subdiv SH Dev of Approach Road Yard Development Protection and boundary wall of Newly Const Agri Dev Research Cum Training Centre with IT facilities Kakraban Part II
Construction of 1000 MT Rice Godown at Kakraban under Kakraban Agri Subdiv SH Dev of Approach Road Yard Development Protection and boundary wall of Newly Const Agri Dev Research Cum Training Centre with IT facilities Kakraban Part III
Construction of 1000 MT Rice Godown at Kakraban under Kakraban Agri Subdiv SH Dev of Approach Road Yard Development Protection and boundary wall of Newly Const Agri Dev Research Cum Training Centre with IT facilities Kakraban Part I
Construction of RCC Bridge L 48 point 00M over Juricherra on MDF road in between Fatikroy to Chowmuhani Bazar during the year 2020 21 SH Construction of Approach road of RCC Bridge by Earth filling Brick soling etc
Construction of Approach Road, CC Block for River Bank Protection, Backfilling behind Abutment, RCC Railling Wearing Coarse over Deck Slab in connection with Constructed RCC Foot Bridge over Khowai river at South Durgapur GP under Kalyanpur RD Block
Strengthening of DCLF, Nalicherra, Dhalai Livelihood Generation and value Additional chain in piggery sector based on DCLF, Nalicherra, Construction or Renovation of approach Road along with Inter Road Facilities House to House and Shed to Shed GR-I
Replacement of SPT Bridge By RCC Bridge at Ch 3 point 00 Km on Nadiapur bazaar old NEC road via saidacherra during the year 2023 24 SH Strengthening of Approach road of RCC bridge by WBM Carpetting etc
6. Renewal/Periodical repair of road from Kakraban-Dhuptali main road to Balarai Para (Link no. 031) (L 3.80km) under SJTNY Scheme
5. Renewal/Periodical repair of road from Kakraban-Dhuptali Road to North Buraghat (Link No 038)(Length 3.840 km) under SJTNY Scheme
Periodical Repair of road from Dhuptali to Madhya Samukcherra Ch.0.00km to Ch. 4.00km link no L032 under Kakraban block under 3054
Ordinary repair of road from Purbassa to Ganaraj Chowmuhani during the year 2021 22 SH By providing Grouting and Recarpeting.L 0.450 KM
1. Periodical Repair of road from Twibaklai Malsom to Darjeeling bari (Link No 025) (L 1.868 Km) during the Year 2023-24
Mtc. of internal road of TFDPC, Nagicherra (Length_0point705 Km) within the working area of Dukli Sub_Division, PWD (RnB), during the year 2025_26_SH_Patch soling, WBM, Carpeting along with other allied works
Site Development i/c preparation of Internal Road and Site Development for proposed for Bru Re-settlement site at Kali Lawgang ADC Village under Bokafa RD Block (PWD SoR-2020)
Mtc. Of internal road inside the premises of Agriculture College at Lembucherra(College Complex, Quarter Complex) during the year 2024-25/SH Patch grouting, WBM-III, Carpeting etc.(L-0.844km)