Loading…
Loading…
2,862 results • Best match
Strengthening of road from Kanchanpur to Machmara from CH 4.00 km to CH 12.50 Km , under Jampui Hill Sub-Division, PWD R and B during the F.Y. 2025 2026 SH Side shouldering, Repair pot holes, BM, Tack coat, carpeting, seal coat, surface drain, Mtc
SH - Building portion including internal water supply and sanitary installation, Bus Bay, Hardstand, Internal road works, Boundary Wall with gate, Electrification works, HVAC, Lift, Escalator and Firefighting works etc. (2nd Call).
Foundation and substructure, Construction of Superstructure, approach road, retaining wall etc.
Construction of approach road by earth filling and soling etc. complete.
Shifting of Electric Pole for upgradation of road from Jogendranagar Takarjala road Anandanagar to North Anandanagar Market via Nos 5 Para Package Nos TR0105P3 under Electrical Sub Division Jogendrangar
Site development works, approach road, construction of Infiltration Well, Sedimentation Tank( 10000 Gallon), HRF cum SSF (1500 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system/ GR-I
under Jolaibari Constituency Assembly (5.00km).
Metaling, carpeting, pot hole repairs, sand seal coat in/c protection works etc. under Section-III within Kakraban PWD(RandB) Sub-Division during the year 2026-27
Construction of Link road (Retaining wall, length-120.00 mtr.) at Barjush Roy para to Rajkishore Dutta para of Uttar Bamutia G.P. under Bamutia R.D. Block DT-86 Dated 11/02/2020
Improvement of Agartala Town Road during the year 2025-26 Road portion from Sarkar Nursing Home to Bazar Kolkata Showroom Internal Link Road SH RCC and Brick Masonary work. 2nd Call
CONSTRUCTION OF LINK ROAD ALONG IBB BETWEEN BP NO 2270 TO 2300 AT GOVINDBARI AND WANSHAPARA FOR LENGTH OF 11.945 KM IN THE STATE OF TRIPURA, PACKAGE NO TR -LR (GnW)
Maintenance of Road from NH-8 to Kamalpur Ambassa road via PS Link road(L-0.62 Km) /SH- Construction of Divider and widening etc from chainage 0.00 Km to 0.62 km.
Construction of R.C.C Drain Bothside and Brick soling at North Side of Sawmill link road at Ward No.05 under Kailashahar Municipal Council , Kailashahar, Unakoti Tripura for the year 2025 26.
PR of road from Piplacherra Panchayat Approach road from CH. 0.00 km to CH.0.50 km Length 0.50 km under Damcherra Sub Division, PWD R and B during the year 2023 2024, SH Re carpeting, Patch metalling, Seal coating, Pucca Drain, Surface Drain etc.
Approach road filling including bank of cheera and construction of retaining wall and CC Block to protect of bank of cheera (length-80 mtr) over the RCC Foot Bridge of Hazanga Cheera at Paschim Rajnagar VC under Tulashikhar RD Block as per SoR 2023
FDR/ Maintenance of road from Satchand -Bankul Road to Sevadhan Para (L-1.50 Km) during the year 2025-26 / SH - Construction of 1(one) no. RCC Boxcell (5.00m x 5.00m, Tripple cell) at Ch.3.874 km over local cherra and Approach Road etc. (2nd Call)
PR of Sabual Approach road Ch 0.00 km to Ch 0.950 km Length 0.950 km, under Jampui Hill Sub Division, PWD RnB during the year 2024 2025 SH Clearing n grubbing road land, Maintenance of earthen shoulder, Maintenance of Drain, Pucca drain, WBM 3,Tack
Replacement of SPT Bridge by Bailey Bridge over river Sonai on the road from Mohanpur to Simna near Mohanpur Market at Ch 0_80 Km S H Construction of Abutments launching of Bailey Bridge approach road protection work etc Job No TP COM 65 2018 19
Maintenance of road from NH44A main road to Badu Para Approach road under Jampui Hill Sub-Division during the year 2025-26 SH- Earth filling, GSB, WBM-2, WBM-3, Pot holes repair, Tack coat, carpeting, seal coating, Bamboo Palasiding etc.(L- 0.125 km)
Replacement of Existing SPT bridge No 1 by RCC Bridge over Juricherra on MDF road to Laljuri road at ch 0 point 10 Km during the year 2020 to 21 SH Construction of Approach road of RCC Bridge by Earth filling Brick soling etc
PR of road from Rahumcherra Panchayat Office Approach road from CH. 0.00 km to CH.0.30 km Length 0.30 km under Damcherra Sub Division, PWD R and B during the year 2023 2024 SH Re carpeting, Patch metalling, Seal coating, Pucca Drain, Surface Drain e
Const of 3 nos RCC foot bridge, approach road with RCC retaining wall i)At Baganbari road of (N) Dhumacherra VC ii)Over Dhumacherra at Barishnav para of Battala VC iii)Over Kathalcherra at Ramdohan para of East Kathalcherra VC under Manu RD Block.
Soling, Metalling, Carpeting, Seal coating, Road side pucca drain and other allied works during the year 2021-22
Special repair to Sepahijala zoo internal road viz i)MainGate of Sepahijala WildlifeSanctuary 1stgate to Office of the Director,Sepahijala Zoological Park ii)Road from Triangularpark to AbasarikaFRH iii)Mainroad to District Forest Office Sepahijala
Proposed Construction of MLA Hostel at Capital Complex, Agartala, West Tripura /SH Construction of internal road, retaining wall, boundary wall, entrance gate, frisking unit, Security box alongwith allied works at MLA hostel premises under Capital
Periodical renewal of completed PMGSY road from Gathalong to Kamarbag( Length 8.352 Km ) Link No. (L026) Ch. 0.00 km to Ch.4.35 km during the year 2022-23
Improvement of road from Dhanbilash H.S. School to NH 208 at BK Roy para School via Manipuribasti. L1.60 km under Chandipur RD Block during the year 2024-25 SH soling, metalling, carpeting, protection work, pucca drain, etc.
Improvement of road from DM colony Main road to Avinash Sarkar House via Binode Sarkar house under Mohanpur RD Block/SH GSB, WBM-II ,III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-0.75 KM)
Improvement of road from R.K. Pur P.S. to Old motor stand and New town road including Bata galli and Jawahar road including drainage system under Scheme for Special Assistance to States for Capital Investment for 2024-25
Improvement of road from Jamuna Biswas House to Nipo ghosh House under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-II ,III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-0.90 KM)
Improvement of road from Gairing - Sanitala road to Belmura PWD road under 1-Simna Assembly consituency during the year 2024-25/SH GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.50 KM)
Improvement of road from Agunyamura to Kalachand Deb para( Jogendra Sutradhar House) under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.25 KM)
Improvement of road from Tara Sundari Bandh to Cinema Hall Road via Sarat Palli para and 2 no. Colony under Mohanpur RD block (L-2.642 km) under RIDF XXIX of NABARD (Job No.TP/COM/ 228/2023-24)
Improvement of road by palasiding and earth filling near youth star club at Indranagar Kabarkhala and const. of drain near the H.O Uttam Saha to AMC ward office No.07 at 79 tilla, Ramkrishna Pally, w.07
Improvement of road of Daftari Tilla (Bholanandapally) behind CBI office building at Gurkha basti under AMC ward no_4, Barjala AC_SH_Earth work, Retaining wall and drain works etc (Length is 0.305 Km).(Ch 0.00 km to 0.120 km.
Improvement of road from Devendra Chandra Nagar Waste Processing site (Common Bio Medical Treatment Facility ) to Beltali (L-800 mtr.) during the year 2025-26/SH Patch soling, WBM-2,WBM-3, Carpeting and seal coat etc.
i. Improvement of road by CC paver block at Madhyabhubanban Main road to H.O Haripad Das ii. Mtc. of brick soling road at Kalyanpur para to South Barjala airport road main road, under ward no.03, AMC
Improvement of road at rear gate of Raj Bhavan L 192 mtr and road start from Ballokia tilla Vat tree to power house L 282 0 mtr under AMC ward No 6 during the year 2020 21
Preparation of DPR
Construction of road side waiting shed at WN 13 Under Melaghar MC during the year 2024 25
Construction of Road in Rural at Ladepa Para Bridge to Mukta Dayal Para under Amarpur RD Block.
Construction of road at near Bijoy Kumar Chowmuhani beside SBI Regional branch under Ward No-18, AMC
PMGSY-I works
PMGSY-I work
PMGSY -I works
PMGSY-I works
PMGSY-III works
PMGSY-I works
PMGSY-III works
PMGSY-III works