Loading…
Loading…
2,862 results • Best match
PMGSY-III works
PMGSy-I works
PMGSY-I work
Periodical repair of road from KK road Kanu Malakar house during the year 2022 23 Patch metalling BM Carpeting and Seal coat etc L1 point 00 Km
Periodical repair of road from KK road Nilkanta pal house during the year 2022 23 Patch metalling BM Carpeting and Seal coat etc L0 point 700 Km
Periodical repair of road from Industry to MalinaBibi house under ward no 1 of AmbedkarnagarPanchyat L 1 point 20Km during the year 202223SHWBMIII Carpeting Seal coat etc
Construction of composite building for Accommodation of different offices of PWD at Capital Complex, Khejurbagan, Agartala/ Construction of internal road, boundary wall, protection wall etc. in/c works of Lower Ground Floor and Upper Ground Floor
Strengthening of road from Manu Dhumacherra Fatikroy road to Durbashakhola via West Masauli GP Ch 0 Km to 1 point 00 Km during the year 2022 23 SH WBM Carpeting in c Cross Drain structure Ch 0 point 60 Km to Ch 1 point 60 Km
Granular Subbase, metalling, BM, BC, Side shouldering, road side drain portion from 0.00 Km to 8.00 km under Scheme for Special Assistance to States for Capital Investment for 2023-24.
Earthwork, Block Pitching etc.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25
Improvement of brick soled road from adjacent of PMGSY road to Dormitor Camp 1 at Haduklau Bru settlement (L -2.50 Km) under Ambassa RD Block / SH- Construction of wing wall by CC block of existing Slab Culvert at Ch. 0.65 Km.
Improvement of road from Maran Das house to Ankoi Mog house and Kunjabati Reang house via Sanjit Marak house at ward No.02 (L-0.250KM) S/H- Earth Filling, Brick Solling etc. under Santirbazar Municipal Council (2nd Call )
Improvement of Road from Machmara Kumarghat KN Road to Dhonicherra Post Office Road via Koilabaritilla under Pecharthal Assembly Constituency of PWD R and B Kumarghat Division Length 1 550 KM under Scheme for Special Assistance to States for
Brick Soled Roads to be converted to all weather road by paver blocks at various roads and Improvement of road from Lefunga Police Station to Bamboo Park (Bodhjungnagar Industrial Growth Centre) via Gamchakobra H.S. School and Gamchakobra Village
Improvement of road from Dhigalia to Airan Chowmohani towards up to Manipuri Chowmohani via Mahanpur Bazar and MLA Para (Length 5.87 Km) under Mohanpur Assembly Constituency under Scheme for Special Assistance to States for Capital Investment for 202
Improvement of road starting from Gurkhabasti (Nehru Park) to internal Electrification via DWS Chief Engineer Office and backside of Pragna Bhawan during the year 2022_23_SH_BM, BC, road marking , paver block and other allied works (Length is 1.074 K
Improvement of road from NH 08 Narayan Saha House to Dhananjay Majumder House near Howrah river via Christian Para during the year 2022 23 SH Metalling, carpeting, construction of CD and protection work Ward No 09 GR I
Improvement of road by brick soling and side wall i. from the H.O Shanti Sarkar to H.O Anil Sarkar ii. From the H.O Laxman Das to H.O Ranjit Ghosh H.O Jiban Deb, under ward no.02, AMC, TUEP
Improvement of road starting from Sarkar Para to Garden High Resort road under AMC ward no_6_SH_WBM_II, WBM_III, Carpeting, seal coat, road marking, retaining wall, toe wall, road side drain and other allied works etc.(length is 850.00 Mtr).
Construction of road during the year 202_21_ Construction of road the residence of Rabi Sarkar to the residence of Rajesh Deb behind Indranagar high school under BEUP at Ward no.08 of AMC_ SH_ Toe wall, Brick soling, palasiding , pavement block
Periodical Maintanance of PMGSY from US Road (Shyam Para) to Bali Para (T04) (L-5.814 km) during the year 2022-23. SH. patch metalling, re-carpetting, seal coat etc
PR Of Handed over PMGSY road from Krishanagar to Radhanagar Link No L051Length 1 108 during the year 2023 24 SH Metalling Carpeting and Seal coat Cross Drain etc
Construction of Black top road from Laxman Majumder House to Surandra Barman House via 6 no para PMGSY main road, Anandanagar GP under Agartala Division during FY 2025-26
Periodical repair of PMGSY Road from Gournagar to Sonamukhi Link No.L-026 Length-0.989 Km during the year 2022-23 SH Surface dressing, patch soling, metalling, grouting, carpeting, ,etc.
Periodical Maintenance of PMGSY road L048 from Rajkandi to Fatikcherra L 4 point 927 Km during the year 2021 22 SH Metalling Carpeting and Seal coat Cross Drain etc
Periodical Maintenance Of PMGSY road L051 from Krishnanagar to Radhanagar L 2 point 80 Km during the year 2021 22 SH Metalling Carpeting and Seal coat Cross Drain etc
Periodical renewal of completed PMGSY road from Garjee to Tulamura( Length 8.57 Km ) Link No. (T06) 4.57 km to Ch.8.57 km during the year 2022-23(Gr-II)
Renovation of Office building Internal Electrification Sub-Division and PMGSY Sub-Division, Teliamura. /SH- Mtc. and room extension in/c. water supply arrangement etc. during the year 2024-25
Periodical Maintanance of PMGSY road from T01 (US Road) to Das Palli (L051) (L-5.15 km) during the year 2022-23. SH. patch metalling, re-carpetting, seal coat etc
Periodical maintenance of PMGSY road L042 Chowmuhani Bazar to Juricherra during the year 202122 SH Patch metalling Re Carpeting seal coating and CD etc Length 3 point 232 Km
Maintenance of earthen shoulder, bituminous surface road, construction of V-shape pucca drain etc
Mtc. of approach road of Birendranagar H.S. School under Jirania Sub-Division, PWD (R and B) during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting, Road side pucca drain and other allied works. (L 0.26 Km, Ch 0.00 to 0.26 Km).
Const of 2Two Nos Box Culvert Size 2.00 2.00 M i One at the approach of Western side Gate of Unakoti Dist Hospital ii another one at the approach road of NH 208A including pucca drain near Unakoti District Hospital, KLS during the year 2024 25
Periodical repair of PWD BT road from (i) Approach road of SDM office (L-0.09 km) (ii) Dhanchakma road to Tarachand Rupini para (L-1.70 km) (iii) T.K road (near Trishabari) to Khamarbari road (L-1.60 km) portion from 0.00 km to 1.20 km/SH- Patch meta
Mtc. of road from Joypur school towards Joypur Mosque in/c mtc. of road extension from Joypur R.C.C bridge at Joypur - Hairmara approach road under jurisdiction of Central-VIII Sub division PWD R and B under AMC Ward no.36 for the year 2024-25 SH Pat
Development of road from (i) TK road to Kalyanpur Panchayet Office via Vegetable market (L-0.61Km) portion from ch 0.46 km to ch 0.55 km. (ii) Approach road of Kalyanpur bridge(L-1.20 Km) portion from ch 0.50 km to ch 1.20 km under Kalyanpur Sub-Divi
Periodical repair of various road under Teliamura subdivision-I of i) Back side of TNP office to TA road (L- 0.30 km) (ii) TK road (Sishubihar) to Budhai Sanyasi para from ch. 0.00 km to 0.85 km (L-1.80 km) (iii) Approach road of Dashamighat RCC b
Re-carpeting grouting etc portion from Ch.0.00 KM to Ch.1.50 KM.
Recarpeting, Grouting etc.
Renovation of existing building at Teliamura inspection Dakbanglow at Teliamura PWD complex, Teliamura under Teliamura Sub-Division No.1 during the year 2025-26./SH- Internal road, boundary wall, plaster, GCI sheet roofing, painting, sanitary items e
Improvement of road from Amghachia Bazar to Sonadhan Deb house via Border fencing under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-II ,III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.20 KM)
Improvement of road from NH 08 to Darchawi Shermontilla road near Pajendra Para via Sidongbanapally High School under Valley ADC under Pabiacherra Assembly Constituency L 3575 Km of Kumarghat PWDR and B Division under the Scheme for Special Assistanc
Improvement of road from Nirmal Patari house to Brajendra Chowdhury via Kanailal Saha house at Ward No. 08 (L- 0.250km) S/H- Earth Filling, Pelasiding, Brick Solling, Pucca drain etc. from Ch- 0.0km to 0.250km under Santirbazar Municipal Council
Improvement of road from Nailafa to Chintaram para under Ambassa Constituency Assembly (L-1.00 Km)/SH- GSB, WBM-III, Carpeting, Protection wall and drain etc. under the Scheme for Special Assistance to States for Capital Investment for 2024-25.
Improvement of road from KMA road to Hridoy para under Ambassa Constituency Assembly (L-1.20Km) /SH- GSB, WBM-III, Carpeting, Protection wall and drain etc. under the Scheme for Special Assistance to States for Capital Investment for 24-25
Improvement of road from A-T road to Sonacherra bailey bridge via Ranjit Colony and Dalak Gamako road to Natun Karaimura via Karaimura J.B School (L-4.475 Km) under RIDF-XXIX of NABARD. (Job No.TP/COM/210/2023-24).
Improvement of road from Lembucherra-Noagaon road to Rupan Sarkar house via Bajalghat High School (L 1.20 km) during the year 2025-26/SH Flat soling, edge soling, WBM-3, carpeting, seal coat and construction of retaining wall, drain.
Improvement of road from Udaipur-Amarpur road (Near Maharani Petrol Pump) to Chaigaria Para (Maharani Barage road) and Udaipur-Amarpur road (near Maharani BSF Camp) to Gangphira Cherra (Total Length 1.80 Km) under Matabari Block / S.H GSB, WBM, Car
Improvement of road from Kathalia Microsapara road at Ledrabari to Manaipathar L 7.50Km under RIDF XXII SH Widening Formation GSB WBM BM PMC with seal coat CD Protection wall and Road side drain Kathalia BlockTSP area for balance por