Loading…
Loading…
2,862 results • Best match
Improvement of road from Kanchanpur Dasda road to the House of Sri Sambhu Deb to Jagannath Temple via Suknacherra under Dasda RD Block 0.995 Km under Scheme for Special Assistance to States for Capital Investment for 2024 25. 2nd call
Improvement of road including Drainage system from NH- 8 near Ramesh Chowmuhani to Jamtala (Near old Town Hall) via Jaganath Chowmuhani and east bank of Jagannath Dighi and from Badarmokam RCC/ Steel Bridge to Brahmabari (NH-8) via old Motorstand un
Improvement of road from Gandacherra-Raishyabari road at Ch.18.30km to Narikel Kunja (L-8.00km) for easy access for the Tourists from Dhalai North and Unakoti Districts to Narikel Kunja Island surrounded by Dumbur Lake Water in Tripura.(2ND Call)
Improvement of road start from Old Nagar Panchayet to Shanitala via Dushmanta Narayan Para during the year 2020 - 21 under BEUP SH Patch soling, Metalling, Carpeting and allied works. Gr. No. -I (L 215.00m) (CH 0.00 m to CH 215.00 m).
shifting of DWS pipe line in the proposed alignment of the RCC covered along with improvement of road during the year 2022-23. Shifting of delivery pipe line from ICP to Fire Brigade Choumuhani under DWS Sub-Division-I Collegetilla.
Improvement of road from Uttar Thalibari to Gamaicherra Market (L-3.00 Km) under RIDF-XXV (Gap fund, OTPMGSY) / SH Formation, re-soling, metalling, carpeting and sand seal coat in/c protection wall, pucca drain and CD structure etc. Kathalia Block
Improvement of bricks soled road _ SH_ Improvement of road start from Bharat Ratna club to West Bhubanban via Nilajyoti Ashram under AMC ward No. 2 (Length is 1.50 km) under Scheme for Special Assistance to States for Capital Investment for 2024_25.
Improvement of Road start from Chandrapur to Salbagan_Khayerpur Bypass (near Shanitala) via Jamtala and laddo Chowmohoni and AMC ward no. 8 and 10_SH_ DBM, BC,road marking and other allied works (Length is 2.7plus 0.6 equals to 3.30 KM) under Scheme
Improvement of road starting from VIP road (Old rajbhavan_ circuit house) to GB bazar via Heritage park and shyamali Bazar _ SH_ DBM, BC, side shouldering, footpath, road side drain and other allied works (Length is 1000.00 m) under Scheme for Spec
Improvement of road starting from VIP road to the State highway (Salbagan to Khayerpur via Banikya Chowmuhani) via MLA Hostel and ILS Hospital_ SH_DBM, BC, side shouldering, footpath, road side drain and other allied works (Length is 1.30 km) under S
Improvement of Road portion from Post Office Chowmuhani to Netaji Chowmuhani under Central III Sub Division PWD(RandB) SH Construction of RCC Cover Drain along with Shoulder and Footpath on RHS of the Road from Post Office Chowmuhani to Netaji Chowmu
Construction of drain, RCC slab and improvement of road by paver block from the H.O ManoranjanSaha to the H.O BiswajitSaha at Nayaniamura and maintenance of drain infront of the H.O Sri. Sanjit Das at Indranagar near old Kalibari, W-08
Improvement of road by brick soling palasiding and pucca drain including RCC slab i. from the H.O Malin Deb to near the H.O Sunil Sarkar ii. from the H.O Achiya Khatun to Sewerage Treatment Plant, under AMC ward no.02
Development of road during the year 2025_2026. (1) Improvement of road from Radha Madhab Unnayan Shangha to towards VIP road ( Length is 60.00 m ) (2) Improvement of Main gate approach Of Lankamura HS School adjacent to Black Top road _ SH _ RCC
Improvement of road from Sarat chowdhury para to Harirai para under 1-Simna Assembly consituency during the year 2024-25/SH Protection work, WBM-II, WBM-III, Carpeting, Drainage work , CD, Retaining wall and Earth filling etc (L-1.40 KM)
Improvement of road from Khowai Chowmuhani-Bijoynagar road to Agartala-Simna road via Munda Tilla during the year 2025-26/SH Box cell, Retaining wall, GSB, WBM-II,WBM-III, Prime Coat, Tack Coat, Carpeting, Seal Coat, etc.(L-1.463 km)
Improvement of road from Paschim Rajnagar High School to Utlabari old NEC road under Tulasikhar RD Block L 2.65 Km SH GSB WBM II WBM III Drainage and Protection work. Group I from Ch.0.00 to Ch.1.325 Km 2nd Call
Improvement of road from Lefunga Gamchakobra road to Kamalghat road via Devtabari School and Sampari Chowdhury para during the year 2025-26/SH GSB, WBM-II, WBM-III, carpeting, Drain, CD, Retaining wall and Earth filling etc.(L-1.70Km). (2nd Call)
Improvement of road from Jamjuri Murapara road to Khil - Nath Para road via Nikhil Sutradhar house - 0.768 km, Mayapuri bazar to garjee Tulamura road via Maldabari - 3.342 km, and along Bari Market to Gathaloingkamar Bag road - 2.485 under Matabari B
Improvement of Road portion from Post Office Chowmuhani to Netaji Chowmuhani under Central III Sub Division PWD(RandB) SH Construction of RCC Cover Drain along with Shoulder and Footpath on LHS of the Road from Post Office Chowmuhani to Netaji Chowmu
Improvement of road from Rajnagar Panchayet office to Rajnagar School under Kumarghat RD Block L 1 1750 Km under PWD Rand B Division Kumarghat SH Widening GSB WBM 2 WBM 3 Carpeting Road side drain CD including protection work etc un
Improvement of road from Sonaimuri Hridaydas Para road to KK road via Ujan Sonaimuri JB School and Mahadevtilla under Pabiacherra Assembly Constituency L 2888 Km of Kumarghat PWDR and B Division under Scheme for Special Assistance to States for Capi
Improvement of road from Santi Kali Ashram to Subash Colony via Kani Pathar (L-3.50 Km) under Mohanbhog RD Block under RIDF-XXV (Gap fund) / SH Formation, soling, metalling, carpeting, CD structure in/c protection wall and road side pucca drain.
Improvement of road from Rasarajnagar Panchayat PWD road to Battali L 992.0 m under Padmabil PWD Subdivision during the year 2025 26 Sh GSB, WBM2, WBM3, Prime coat, Tack coat, Carpeting, Seal coat, Pucca drains, Retaining wall, Box cell, etc.
Improvement of road from Mohamuni road to Sita Mog house and Mohamuni road to Madhu Mog house at Ward No.12, (L-0.080km) S/H- Earth Filling, Pelasiding, Brick Solling from ch 0.0km to 0.080km, under Santirbazar Municipal Council (2nd Call )
PMGSY works 3rd call
PMGSY III - FDR works
PMGSY III - FDR works
PMGSY III - FDR works
PMGSY III - FDR works
PMGSY-I Balance work
Maintenance of PWD road from Kismat Kuri Internal Road Net Works (L_0 point 55 km) under Amtali PWD (RnB) Sub Division during the year 2024_25_SH Patch repairing, patch metalling , carpeting, Premix seal coat , Const of pucca drain etc
Mtc. of existing internal road and construction of new peripherial road around newly constructed academic block in the premises of Womens Polytechnic College, Hapania SH Soling, WBM, Paver Block, Toe Wall, RCC Retaining Wall, Patch Grouting, Re-Carpe
GSB and laying 80MM Paver Block
Construction of Box Culvert and Road side pucca drain at link road from Uttar Aralia PWD road to Khandakar para at Aralia in Boxanagar RD Block under BADP Scheme during the year 2021-22
Construction of toilet including (Link road between main building and toilet block) with roofing Internal water supply and sanitary installation for transgender at Kamalpur Court building Kamalpur Dhalai Tripura during the year 2025-26
Earth work GSB WBM-II WBM-III Carpeting Paver Block CC work RCC work etc
Patch Soling WBM Prime Coat Tack Coat Carpeting Seal Coating, Toe Wall, , Earth filling Work Road Side Drain Markings and Road signage etc under NABARD
Periodical repair of Road from Sachindra debbarma house to Faribari ( L- 0.7 Km) during the year 2025-26/ SH Unlined surface drains, WBM-3, patch repair, Carpeting, etc. complete.
Maintenance of road sections damaged due to flood SH repair of road section within the juridiction of Purba Champamura Gram Panchayet during the year 2020 21 L 2.406 Km.
Periodical repair of road from Industry to Manilal Nandi house under ward No1 of AmbedkarnagarPanchayet L600 mtrduring the year 202122SH WBMIII Carpeting Seal Coat CD and protection work etc
Periodical repair of Road from Tulsiram Para to Radha nagar TSR camp ( L- 1.2 Km) during the year 2025-26/ SH Unlined surface drains, patch repair, Carpeting, etc. complete.
Periodical repair of road starts from Santikami Sangha, Budhyamandir to Abhoynagar road joint. during the year 2022_23 _ SH_ DBM, BC,footpath and other allied works (Length is 0.56 Km).
Periodical repair of road starting from Old TBSE Office Kunjaban Colony to H_o Narayan Chakraborty, during the year 2021_22_SH_ Grouting , WBM, Carpeting , seal coat etc.(Length is 249.00 m )
Development of Agartala town road, during the year 2026-27 SH Repair of road By providing Grouting, WBM 3, Re-carpeting and gunny bag placeing. At Banamalipur area, Agartala
metalling, grouting, carpeting, sand seal coat etc.
Construction of RCC bridge over Ratacherra and Juricherra on the road from MDF road to Emrapassa at ch 0 point 30 KM and at Ch 3 point 00 KM during the year 2023 24 SH Strengthening of Approach road of RCC bridges two 2 nos by WBM Carpetting etc
Periodical maintenance of PMGSY road from K.K. road to Hridaydas Para during the year 2021 22 SH Patch metalling Re Carpeting seal coating and road side drain Length 1point 50 Km
Construction of Paver block road from Adampur Paschimpara PMGSY road to Vati Kalamchowra (L-0.350 km) portion from 0.170 km to 0.350 km under Boxanagar block during the FY 2025 26
Periodical maintenance of PMGSY road from Ek mile to Darchawi L026 during the year 2021 22 SH Patch metalling Re Carpeting seal coating and road side drain Length 1point 973 Km