Loading…
Loading…
2,863 results • Best match
Construction of road by paver block and mtc of drain at different places under Ward No 31 AMC TUEP
Construction of Road side Drain from NBCC Road to Mono Kishore Jamatia House under Killa VC under Killa R.D.Block
Construction of road by paver blocks and drain near H.O Abhijit Giri at Chandmari, under ward no.06, AMC
Periodical maintenance of PMGSY road from K.K. road to Hridaydas Para during the year 2021 22 SH Patch metalling Re Carpeting seal coating and road side drain Length 1point 50 Km
Construction of Paver block road from Adampur Paschimpara PMGSY road to Vati Kalamchowra (L-0.350 km) portion from 0.170 km to 0.350 km under Boxanagar block during the FY 2025 26
Periodical maintenance of PMGSY road from Ek mile to Darchawi L026 during the year 2021 22 SH Patch metalling Re Carpeting seal coating and road side drain Length 1point 973 Km
Construction of Paver block road from Adampur Paschimpara PMGSY road to Vati Kalamchowra (L-0.350 km) portion from 0.00 km to 0.170 km under Boxanagar block during the FY 2025 26
Periodical renewal of completed PMGSY road (TR01-178) from Chandranath (Hezamara-Kalaghat) to Barkathal (L-1.98 km) during the year 2025 - 26/ SH WBM-3, patch epair,Carpeting, protection wall, etc.
Periodical repair of PMGSY Road from K.F road to Bilashpur Baluwari Link No.L-031 Length-0.798 Km during the year 2022-23 SH Surface dressing, patch soling, metalling, grouting, carpeting, etc.
Periodical maintenance of PMGSY road L-039 Kanchanbari to Demdum during the year 2021 22 SH Patch metalling Re Carpeting seal coating and road side drain Length 4 point 050 Km
Providing and laying patch metalling, recarpetting, trapezoidal drain etc.
Site development works, approach road, Construction of Aerator, Sedimentation Tank (10000 Gallon), HRF cum SSF (1500 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system etc and other allied works /GR-I
Maintenance of Agartala town road during the year 2024 25 under the Jurisdiction of Central V Sub-Division SH Repair of MBB College internal Road including other connected road L 1.500 KM by providing BM, BC etc. Southern Portion
Const. of 15 no Non-Type and Type-VI qtrs at Agartala, West Tripura_SH Building portion inc. Internal water supply, sanitary inst., sewage and drainage and I.E. works_SH Internal and External Boundary wall, Retaining wall, Internal Road, Side drains
Maintenance of Agartala town road during the year 2024 25 under the Jurisdiction of Central V Sub-Division SH Repair of MBB College internal Road including other connected road L 1.500 KM by providing BM, BC etc. Northern portion
Maintenance of brick soled road namely Link road of Hospital Tilla (Manubankul CHC) (L - 0.240 km) from Ch.0.00 km to Ch.0.240 Km during the year 2025-26 SH - WBM-III, Paver Block etc.
Construction of approach road with WBM-II, WBM-III, PMC and seal coat etc.
Development and construction of roads under AMC Ward No.40.
Periodical Repair of road from Fatikroy Bridge to Ambedkar College road L 1 point 00 Km during the year 2021 22 SH StrippingPatch repairing Soling Carpeting and Seal coat etc
Periodical Repair of road from Old NEC road to Tripura BastiTLength 5 Km SH Metalling Carpeting etc during the year 2022 23 Ch 2 Km to 3 Km Gr II
Maintenance of road sections damaged due to flood SH repair of road section within the juridiction of Durga Chowdhury para Gram Panchayet during the year 2020 21 L 1.300 Km.
Periodical Repair of road from Fatikroy Bridge to Ambedkar College road L 1 point 00 Km during the year 2021 22 SH StrippingPatch repairing Soling Carpeting and Seal coat etc
Periodical Repair of road from Old NEC road to Tripura Basti T Length 5 Km SH Metalling Carpeting etc during the year 2022 23 Ch 1 Km to 2 KmGrI
Periodical Repair of road from Saidabari Bazar to Khastilla via Vidyasagar Panchyet Office during the year 2023 24 SH Patch soling WBM-III Carpeting and road side pucca drain etc
Periodical repair of road from TSECL office(Co_Operative) to Mati Rudrapal house Under Construction Sub_Division_II PWD(RandB) during the year 2025_26_SH_ Grouting, Carpeting, Seal coat etc.(Length is 1.20 km)
Periodical Repair of road from K K road near Reserve Forest to Ashrampally Total Length 0 pt 50 Mtr during the year 2023 24 SH Patch soling WBM Carpeting etc
Periodical repair of road starts from Abhoynagar main road near ATM counter to Vetrary Hospital quarter, during the year 2021_22_ SH_Grouting , WBM, Carpeting , seal coat etc.(Length is 292.00 m ).
Renovation and repairing of Office Building of PWD(RandB) Sub-Division No-I, PMGSY Sub-Division, Udaipur and Water Resource Investigation Sub-Division Udaipur, Gomati District, Tripura, during the year 2025-26
Periodical Repair completed PMGSY road from NEC road to Ambedkarnagar Link No L 052 Total Length 1 300 Km during the year 2023 24 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical repair of Handed over PMGSY road from Pabiacherra to Katatilla Link No L045 L 3 POINT 475Km during the year 2023 24 SH WBM Carpeting Seal Coat and Cross Drain etc
FDR of road from Ranirkhamar Bazar to Pritilata PMGSY road (L_1 Point 015 Km) under Dukli Sub Division, PWD (RnB) during the year 2024_25_SH Construction road side drain and other allied works
Construction of all weather road from JampuiHill PMGSY road point to KangraiunderJampui Hill R D Block in Tripura Length 8 625 Km under NESIDS Roads On Engineering Procurement and Construction EPC mode
Development of the road from PMGSY road to NH 208 L300 Mtr. under Khowai Subdivision during the year 2026 27 SH Earth work, Pothole repair, patch WBM III, Recarpeting. Road side drain.
Improvement of road from (i) Maharanipur to DM Colony (L-1.10 Km), (ii) A.A. road to Bhumihin Colony (L-1.50 km) under Teliamura R.D. Block (Total length- 2.60 Km) under Scheme for Special Assistance to States for Capital Investment for 2024-25
Improvement of road from Kali Chowmuhani to Kaiyachanbari via Natunbari under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH GSB, WBM-3, Carpeting and other allied works. (L 0.38 Km, Ch 0.38 to 0.76 Km). Gr-II
Improvement of road from Gokulnagar Panchayet Office to NH 208 under Kumarghat RD Block L 1 550 km under PWD R and B Division Kumarghat SH Widening GSB WBM 2 WBM 3 Carpeting Road side drain CD including protection work etc Fatikroy Assembly
Improvement of road from near Asha Holy Cross to Agartala-Simna road (Awja Restaurant) during the year 2024-25/SH Flat soling, edge soling, WBM-3, carpeting, seal coat, Side berm dressing and construction of retaining wall. (L-1.50 km)/2nd Call.
Improvement of road from Kali Chowmuhani to Kaiyachanbari via Natunbari under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH GSB, WBM-3, Carpeting and other allied works. (L 0.38 Km, Ch 0.00 to 0.38 Km). Gr-I
Improvement of road start from Old Nagar Panchayet to Shanitala via Dushmanta Narayan Para during the year 2020 - 21 under BEUP SH Patch soling, Metalling, Carpeting and allied works. Gr.No - III ( L- 160.00 M) (Ch 375.00 m to Ch 535.00 m)(2nd Call)
Improvement of road from Amtali Khayerpur By Pass to Amtali Khayerpur By pass via Ashrampara Kali Mandir under Malaynagar Panchayet under Dukli R.D Block SH Flat brick soling, WBM II, WBM III, PMC, RCC Drain, CC Drain, and other allied works..Gr-I
Improvement of road from Amtali Khayerpur By Pass to Amtali Khayerpur By pass via Ashrampara Kali Mandir under Malaynagar Panchayet under Dukli R.D Block SH Flat brick soling, WBM II, WBM III, PMC, RCC Drain, CC Drain, and other allied works..Gr-II
Improvement of road from Chandrapur to Aralia Bridge Embakment RoadL1200.00 mtr SH Construction by GSB, WMM, BM, BC and retaining wall under ward No 25 of AMC under Scheme of Special Assistance to states for Capital investment for 2024 25 Re surfacei
Improvement of road from Dalugaon Market to approach of Jalai Bridge via Tirupati Temple at Bilashpur Portion from Ch. 1.00 Km to 2.04 Km under the additional surplus of Special Assistance to states for capital expenditure in 2020 21 GSB, WBM II, WB
Improvement of road from Srirampur Muslim palli from residence of Bappa Roy To Indira nagar ward No.1 Bibhu Nama L 2.40 km under Chandipur RD Block during the year 2024-25 SH GSB, metalling, carpeting, CD, protection work, pucca drain, etc.
Improvement of Road from Chandrapur Bazar to Aralia Bridge embankment road L 1200.00 mtr SH Construction by GSB, WMM, BM, BC and retaining wall under Ward No. 25 of AMC under Scheme for Special Assistance to States for Capital Investment for 2024
Improvement of road by laying pavers block and gard wall from i. the H.O Nantu Chakraborty to H.O Binod Datta at South Barjala beside main road ii. H.O Rabindra Roy to H.O Narayan Sutradhar at Barjala Mahan Club para, w-03, TUEP
Improvement of road from Chandrapur to Lake Chowmuhani Bridge Parivahan Bhavan via Sachin Debbarma Setu on south bank of Katakhal L 2.65Km within the Jurisdiction of Agartala Division No I, PWD R and B under the Scheme for Special Assistance to S
Package No.3 i Improvement of road from Agartala Bishalgarh road Dukli Block office to SIPARD via Chowrangee School under the Scheme for Special Assistance to States for Capital Expenditure in 2020 21 ii Brick soled roads to be converted to all wheth
Improvement of road from Dalugaon Market to approach of Jalai Bridge via Tirupati Temple at Bilashpur Portion from Ch. 1.00 Km to 2.04 Km under the additional surplus of Special Assistance to states for capital expenditure in 2020 21 GSB,.. 2nd Call
Improvement of road by paver block from the H.O Abdul Salam to Saha Alam, H.O Pintu Paul to Beauti Das and palasiding, soling from the H.O Furken Husen to Alam Miah at PEC brick field and Lamba Basti under Ward No-35, AMC.