Loading…
Loading…
2,863 results • Best match
Construction of road and covered slab starting from Shitlabari to H/O Anil Deb at Ujan Abhoynagar, ward no.11, AMC
Construction of road by brick soling, CC including side wall near Netaji Club, ward no.02, under BEUP Scheme -2nd call.
Construction of road by c.c from the H.O Sri Hemandra Das to H.O Sri Sankar Deb Under ward No 33,AMC.
Construction of road, RCC slab and its allied works at Dr. Sudhanshu Sutradhar goli under Ward No-31, AMC. 2nd Call
Improvement of Badurtali Lane Road portion from Akhaura Road to TVS Showroom at TRTC Road under Central-III Sub-Division PWD R and B SH Construction of RCC Cover Drain along with Road Improvement by Paver block
/Patch WBM Grouting Re-carpeting and seal coating etc
Periodical Repair of road from ChebriChowmuhani to Rajnagar via Shakti Sangha Club L 1 point 10 Km during the year 2022 23 SH Stripping Patch repairing Soling Carpeting and Seal coat etc
Periodical repair of road from NH 08 to BhatiDudpur from Ch0 km to Ch 0 point 90 km during the year 2022 23 SH Patch metalling Grouting Carpeting and Seal coat etc
Periodical Repair of road starts from Nandannagar School Chowmuhani to Debram Thakur Para under AMC Ward No.6 during the year 2020_21 _ SH_ WBM, Grouting, Carpeting, Seal coat and other allied works.
Improvement of road from NH 08 to Godown Para L 0 point 38 km from Ch0 km to 0 point 38 km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH WBM Carpeting Seal Coat RCC retaining wall GrI
Improvement of road from PWD road to Sunil Debnath house at wrd No.08 (L-0.160km) S/H- Earth Filling, Brick solling etc. And Construction of Retaining wall near Amal Debnath house at ward No. 08 (L- 20.00Mtr) S/H- Retaining Wall etc. under SMC
Improvement of road from Old K K road near Ambedkarnagar Panchayet Office to Industrial Estate L 550 mtr during the year 2021 22 SH Earth Filling Side widening WBM II WBM III B M Carpeting Seal coat C D and road side pucca drain etc
Improvement of road by brick soling, pucca drain and cross drain i. from the H.O. Dhirendra Rudrapaul to near the H.O JibanDebnath at Paul Para ii. from the H.O Ranjan Sarkar to near the H.O BadalSarkar at Panchayet Para under ward no.01, TUEP
Improvement of road by paver blocks from the H.O Biru Rudrapaul to the H.O Anjan Rudrapaul at Nandan Nagar Paul Para and Imp of road by soling from the H.O Shibkumar Chowhan to Ramcharan Chowhan House at East Chandmari, under ward no.06 (2nd call).
Improvement of road at Bahadur Sardar para Ward no.3 to Brahmacherra ward no.03(L-2.18 KM) at ch 1.75km under Mungiakami RD Block/SH- Brick bats wirecrates, C.C Block and construction of embankment etc. at Ch- 1.75 km during the year 2024-25
Improvement of road from Indranagar to GB Bazaar via ITI (L is 2.41 km) under the Scheme for Special Assistance to States for Capital Expenditure in 2020_21. _SH_ Construction of new road starts from VIP road to House of Dinesh Sarkar and Rajendra Kr
Improvement of road by paver blocks from the H.O Nepal Ch. Deb to the H.O Kishor Deb H.O JogendraDebnath to the H.O Debashis Chakraborty Haricharan Malakar to Santosh Debbarma Mtc of drain beside HO Gopal Das and Mtc of Satyajit Roy MuktaManchya,W-05
Improvement of road at Tulashikhar Twibaglai road to Rabicharan para Length 1.5 from Ch 0.00Km to Ch 0.50Km under Tulashikhar RD Block during the year 2025 26 SH GSB,WBM 2 and WBM 3, Carpeting, Seal coat, Retaining wall, CD and protection work etc.
Improvement of road by brick soling and side wall i from the H.O Babul Das to near the H.O Helen Biswas at Shil Para ii from the H.O Sushil Das to near the H.O Sukhlal Biswas at Karmakar Para, under ward no.01, AMC
Improvement of Road and Construction of RCC cover Drain on Both side of the road on Ramnagar Road No. 8 under the Jurisdiction of Ward No.14 1100 Mtr under Scheme for Special Assistance to States for Capital Investment for 2024-25. 2nd Call
Improvement of road by Bamboo palasiding and earth filling at Joynagar BRO road to HO Harendra Sarkar Const of paver road Joynagar rd no1 to HO Tapas das and const of paver road near HO Kanai Dey at Ramsundar Nagar under Ward No34 AMC
Periodical Repair of PMGSY handed over road from NEC Road to Battala Link No. L-033 during the year 2023-24 SH WBM, grouting, carpeting, seal coating, shoulder maintenance, drain, etc. Length 3.919 km
Maintenance of road from Kailashahar-Golakpur road to Chantail PMGSY road via Rangrung School during the year 2022 - 23 SH Side berm dressing, protection works, drain, patch metalling, grouting, patch carpeting, seal coating etc.
Periodical Repair completed PMGSY road from A A road to Chandraka Para Link No L 027 Total Length 1 868 Km during the year 2023 24 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical renewal of completed PMGSY road from AT road to Atombhagya road L- 6.500 Km Link No. L037 under Ompi Block SH- patch GSB, patch metalling, throughout carpeting and all other allied works etc.
Maintenance of road from Fatikchera Bazar to Harinakhala Satdubia road(PMGSY Road) via Harinakhala School/ SH Patch soling, WBM, PMC, Seal Coat with allied works from Ch.0.00km to 0.60Km(L-0.60km)/Gr-I
Maintenance of road from Fatikchera Bazar to Harinakhala Satdubia road(PMGSY Road) via Harinakhala School/ SH Patch soling, WBM, PMC, Seal Coat with allied works from Ch.1.20km to 1.50Km(L-0.30km)/Gr-III
Maintenance of road from Fatikchera Bazar to Harinakhala Satdubia road(PMGSY Road) via Harinakhala School/ SH Patch soling, WBM, PMC, Seal Coat with allied works from Ch.0.60km to 1.20Km(L-0.60km)/Gr-II
Construction of Brick soling road I from PMGSY road towards nh of Sujit Mallik at Bargul GP and II From nh of Paresh Nath towards Bamunia cherra at Sarala GP under Kadamtala RD Block
Mtc of road from Laroorbari Putia road to Uttarpara PMGSY road etc SH Soling WBM3 Carpeting Road side drain and other allied works under PWD (RB) Boxanagar Sub Division during the year 2024 25
Periodical Repair of the road from AA road at 82 Miles to Nandadulal Das house via 82 Miles SB School in c School internal road Length 1150 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Patch Maintenance of Kanchanpur TSR Camp Internal road (Length 0.920 km), under Jampui Hill Sub-Division, PWD(RnB) during the year 2025-26 /SH- Clearing n grubbing road land, Mtc. of earthen shoulder, Surface drain, WBM-2,WBM-3,Tack coat, Patch carpe
Setting up of Integrated Seed Processing Plant at Gakulpur under Gomati District SH a Const. of Go-down b Drying floor c Non Seed Go Down d Office building e Seed processing plant f Toilet block and g Parking and internal Road
Mtc. of road from Garjantalli to Damdama via office tilla and SDM office including internal road / Regrading of road from Ch. 0.900 to 1.035 Km / SH - Lowering by earth cutting, GSB, WBM, PMC, RCC Side Drain etc during the year 2025-26
SH Site clearance Earth Work Protection Work Road Side Drain Granular Sub Bases Non Bituminous and Shoulders Bases and Surface Courses Bituminous Traffic Sign Markings and Other Road Appurtenances Box Culvert Re Plantation
Metalling,bituminous penetration macadam,carpeting,seal coat,pucca drain
Mtc of road from Mainama PMGSY road to Mainama DRA Camp (L-2.50 Km) under the jurisdiction of PWD (RB) Boxanagar Sub Division during the FY 2024-25/ SH- Patch soling, Construction of protection wall, Road side pucca drain etc. and allied works.
Road works
Road works.
Mtc of road from Paiturbazar to Sonamara and Airport link road during the year 2022 23 SH Patch soling patch metalling grouting recarpetting seal coat etc L Ch 0.80 km 2.30 km 1.50 km Group 2 2nd call
Earth Cutting, Brick Solling, from ch.0.0km to 0.250Km under Santirbazar Municipal Council .
Earth Filling, Brick Soling etc. Under Santirbazar Municipal Council.
- Earth Filling, Brick Solling and Pelasiding stc from Ch.0.00Km to 0.088Km
BB road via Santirbazar Motor Stand, Mahamuni, Kalacherra (L-4.875) under RIDF XXVIII of NABARD.
Subgrade, GSB, metalling, carpeting, Retaining wall, kutcha drain, pucca drain, etc.L-2.30 km under Scheme for Special Assistance to States for Capital Expenditure-Part-III
Earth Filling, Pucca drain, Brick solling etc. under Santirbazar Municipal Council.
Earth Filling, Pelasiding, Brick Solling etc. from ch. 0.0km to 0.100km under Santirbazar Municipal Council.
Retaining Wall, Pucca drain Earth Filling, Brick Solling, Pelasiding etc. under Santirbazar Municipal Council.