Loading…
Loading…
2,863 results • Best match
Renewal of PMGSY road Brahmacherra ward No.1- Kakracherra, Link No. L023, Phase IX, total length -2.217 Km under Mungiakami R.D Block during the year 2024-25/SH- (A) Initial rehabilitation (B) Renewal. (Package No. TR01170EXT)
PR of handed over PMGSY road from SonamuraNidaya NEC Road, Drop gate (Near KalapaniyaJatri shed) to Kirtaniabari via Kalapaniya High School, Kalapaniya old Forest Office, Drop gate, Kalapaniya Auto Stand, Kalapaniya Bazar, Shalkhet South Para, Kalapa
Maintenance of road from Ambassa Colony road from chainage 0.00 Km to 2.65 Km /SH - Construction of road side drain at different chainage.
Construction of road side pucca drain from Madhabi Dasgupta house to Anjana Deb house at Durga Choudhury GP under Old Agartala RD Block
Construction of road from the house of Amulya Paul to the house of Paresh Das with drain, AMC ward No. 34 Balance Work
Maintenance of Agartala Town Road During The Year 2023-24 SH Construction of road side RCC Cover drain at Nutan palli, Dhaleswar, Agartala
Construction of road by cement concrete road and R.wall from the H.O Sudhir Das to Bapuji Vidhya Mandir Under ward No 37,AMC.
Construction of road by palasiding and paver block at South Ramnagar PEC brick field near H.O Safiqul Choudhury under Ward No-34, AMC
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Periodical repair of Agartala town road during the year 2019 20 Re carpeting of roads portion from i Ghandhighat shani Mandir to Battala Jahar Bridge ii link road from Embankment to melarmath under the jurisdiction of Central III Sub Division
2. Construction of under-ground water reservoir, mtc. of link road, repairing of conference hall, shed with waiting area infront of OPD and car parking zone with shed at Tripurasundari sub-divisional hospital complex, Udaipur during the year 2022-23
Mtc. of roads from Chellagang Mukh to Chellagang Samatal para (L-3.30km) Under Amarpur RD Block and Amarpur to Chellagang via Amarpur Degree college portion from within Jatanbari PWD sub-Division Under Karbook RD block and other link road(L-3.00km
SH-Earth filling, Pelasiding, Brick Solling under Santirbazar Municipal Council
Earth Cutting, Earth Filling, Brick Solling etc. under Santirbazar Municipal Council.
Earth Filling, Pelasiding, Brick Solling, from ch- 0.0km to 0.104km
Earth Fiiling, Pelasiding, Brick Solling, Pucca drain etc. from ch-0.0Km to 0.120km.
Patch metalling, Grouting and Re-carpeting.
Patch Metalling, Grouting and Re-Carpetting.
Patch repairing ,WBM-III,re-carpeting,sand seal coat etc
Mtc. of Agartala town road during the year 2020 21 Improvement of road from NH 44 Madhya Kashipur Narayan Ghosh to Sunil Sarkar House SH Metalling, carpeting, construction of road side drain and RCC Retaining Wall Ward No 09
Periodical renewal of PMGSY handed over road from KA Road to West Nalicharra (Link No -038) (L-(L-0.714Km) during the year 2023-24 under SuvarnaJayanati Tripura NirmanYojona/SH-Grouting, patch repairing, re-carpeting , seal coat etc
Periodical Renewal of completed PMGSY road from T01(US road) to Dakshin Para (Length 4.010 km) Link No.L032 under Sabroom Division during the year 2022-23 SH. Repair of pot holes Re carpeting, and seat coat etc.
Mtc of Road from Jarulbachai (before Jarulbachai GP) to towards Dhundrai connecting with PMGSY road under Dukli Sub-Division during the year 2023_24_SH_Patch soling WBM carpeting road side drain and other allied works (Length_1 point 10 Km)
Periodical renewal of PMGSY handed over Road from Dalubari to Dhancharra (Link No -032) (L-4.030 Km) during the year 2023-24 under Suvarna Jayanati Tripura Nirman Yojona/SH-Grouting, patch repairing, re-carpeting , seal coat etc.
PR of road from Bagbari to Durgabari PMGSY road(Link No.L051)(L-0.719Km) under Tripura Nirman Subarna Jayanti Yojana during the year 2023-24/SH Side berm dressing, flat soling, WBM-3, grouting, carpeting, seal coat etc.
Urgent. Mtc of road from US road to Madhya Para (L - 12.955 km) PMGSY road during the year 2025-26/5H - Flat and Edge Brick Soling, Palasiding etc. Ch. from 0.00km to 6.00km Gr-1. (2nd Call).
Mtc of PMGSY handed over road from kailashahar Murticherra to Golakpur link No L-T09 Length - 6.887 Km during the year 2023-2024 SH. Surface dressing, patch soling, matelling, grouting ,carpeting, road side drain,CD work etc
Maintenance of road from PMGSY trijunction to the house of Sri Akhil Das via Hatat bazar and Palpara, Baldakhal(L0.800 Km) under the jurisdiction of PWD(R and B) Khayerpur Sub Division during the year 2024 2025..
Periodical renewal of completed PMGSY road from Panlonga to Duwarikanai Length-3.20 km Link No L-060 under Ompi Sub-Division SH-Surface Drain, Road side pucca Drains, Landslide Clearance, WBM-3, PMC, Sand seal coat etc.
Shifting of Electrical Utility for newly proposed PMGSY - III Scheme from (i) Chowmuhani Bazar to Juricherra(5.4Km), (ii) MDF Road at Kanchanbari to Demdum(5.8Km) , (iii) Jagannathpur to Telia Via Jagannathpur H.S. School(6.59Km) under ED - Kumar
PR of handed over PMGSY road from Sonamura Road to Padmadhepa (L032) (L-2.185 km) under MMC area during the year 2022-23/SH- Patch Soling, Patch WBM, Grouting, Re-carpeting, protection work etc and allied works.
Periodical repair of road from old KK road near Rajmohan Das house to industry road during the year 2022 23 Patch metalling BM Carpeting and Seal coat etc L 0 point 869 Km 2nd call
Flood damage repair of road from Kamalasagar road to Pathariaduar G.P /SH-Replacement of damaged pipe culvert with double cell RCC Box Culvert (3.00 m x 3.00 m) during the year 2019-20.( 2nd call).
Maintenance _ Repair of road side drain alongwith widening of CC road and brick masonry work at periphery of Tennis court etc at Kunjaban extension under PWD Capital Complex Division during the year 2022-23_Gr-I
FDR/ Urgent Repair of Road from Bat tala to Radha nagar and Chotu kutna to Sanitala market ( L- 4.34 Km) during the year 2024-25/ SH WBM-3, patch repair, Carpeting, protection wall etc. complete.
Periodical repair Of road from Noagaon Krishanagar Assambasti road to Pamchamnagar under Radhanagar GP during the year 2022 23 SH Carpeting and Seal coat etc ch from 1 point 00 km to 1point 60 km
Maintenance _ Repair of road side drain alongwith widening of CC road and brick masonry work at periphery of Tennis court etc at Kunjaban extension under PWD Capital Complex Division during the year 2022-23_Gr-II
Periodical repair Of road from MDF road to Dibajoyti Dutta House via Masuali High School during the year 2022 23 SH Carpeting and Seal coat etc ch from 1point 00 km to 1point 50 km
Periodical repair of road starting from near the house of Biswajit Das to Pankaj Sarkar L 500 mtr during the year 2022 23SH Earth cutting earth filling Soling Metalling Carpeting CD and Protection work etc
Periodical Repair of road from BetcherraDarlongBasti road to Marakpara from Ch 0 Km to 0 point 50 Km Total length 2 Km during the year 2022 23 SH Patch metalling grouting carpeting etc Gr I
Development of road during the year 2025_26_SH_Periodical repair of road from Lankamura Anandamarg School to Lankamura Pal Para under AMC Ward No_1 Under Jurisdiction of Construction Sub_Division_II PWD(RandB)_SH_Road Side Pucca drain ,Grouting, Carp
Periodical repair of road starts from Uttar Narayanpur bridge (Uttar Narayanpur S.B school) to Dakshin Narayanpur (Swasanghat) under AMC ward No.1 during the year 2022_23_SH_ Re carpeting, grouting, WBM, seal coating and other a
Mtc. of Agartala town road during the year 2023 24 under the Jurisdiction of Banamalipuir Constituency SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc. GR I
Periodical repair of road starts from VIP Road to Secretariat Gate, New Capital Complex, during the year 2023_24_ SH_ BC, Tack coat, Road side blinker, Traffic Signs and other allied works. (Length is 0.800 Km).
Maintenance of Agartala town road during the year 2023 24 under the Jurisdiction of Central V Sub Division SH Repair of road from Ramthakur Sangha to Gandhi School by providing BC etc. L 1.74 Km
Periodical repair of road from Dukhia Chow para to Nabadwip Chow para L 0.760 km under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Recarpeting seal coat Surface Drain etc.
Periodical repair of road from NH-208 (CRPF Camp Gate) to Nepali Basti (L 1.50km) during the year 2022-23/SH Patch repairing, Carpeting, Seal Coat from Ch.0.00km to 1.50km and one retaining wall.
Mtc. of Agartala town road during the year 2023 24 under the Jurisdiction of Banamalipuir Constituency SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc. GR II
Improvement of road from NH 08 to AndharcherraPanchayet office via Andharcherra Health Sub Centre Total length 0 point 75 km from Ch 0 point 45km to 0 point 75 km under PWD R B Pencharthal Sub Division during the year 2022 23 SH CD Toe wall etc Gr I
Improvement of road by paver block and pucca drain at near HO Julekha Begam to HO Hazara Bibi near Sristi club Road by paver block near HO Ashad Miah to Abon Miah near Sristi Club and Drain mtc near infront HO Suman Deb at Upendra Para Joynagar under