Loading…
Loading…
2,867 results • Best match
Mtc. of Agartala town road during the year 2023 24 under the Jurisdiction of Banamalipuir Constituency SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc. GR II
CONSTRUCTION OF ROAD FROM JOLAIBARI-KALASHI ROAD TO MAJUMDER PARA VIA DAS PARA AND JOLAIBARI-KOWAIFUNG ROAD TO MANIK PARA. (Under RIDF-XXXI of NABARD during year 2025-26)
Improvement of road from NH 08 to AndharcherraPanchayet office via Andharcherra Health Sub Centre Total length 0 point 75 km from Ch 0 point 45km to 0 point 75 km under PWD R B Pencharthal Sub Division during the year 2022 23 SH CD Toe wall etc Gr I
Improvement of road by paver block and pucca drain at near HO Julekha Begam to HO Hazara Bibi near Sristi club Road by paver block near HO Ashad Miah to Abon Miah near Sristi Club and Drain mtc near infront HO Suman Deb at Upendra Para Joynagar under
Drainage System mtc. and Construction of road side drain at various locations under Rajnagar RD Block area under the jurisdiction of RD Santirbazar Division
Construction of Road side drain both side at Nitai Sen House to Shaymal Das House bothside, NSC Nagar GP under B.C. Nagar RD Block
Construction of road side RCC drain from Sova Rani Debbarma land to Samir Debbarma land BT Para VC under Old Agartala RD Block (63m)
Mtc of PWD road at Dalugaon market SH Construction of road side pucca drain at west side of Dalugaon market. Group No. I II
Construction of road by paver block and RCC slab from Ranjit Nagar School to HO Prasanjit Das at Ranjitnagar under Ward No 14 AMC
Construction of road by paver block with drainage system from suman sarkar to H.O Sadhu Satrkar at Sabuj palli under ward No 48 AMC.
Construction of road from the house of Anjan Das to Tapan kumar Roy near south Indranagar Anganwadi school under BEUP of 6_Agartala Assembly constituency
Construction of parking shed
Refer DNIT93
SH Dismantling and demolishing of existing damaged drains and re-construction of RCC drain and road side kerb, toe wall etc.
Brick Soling , Brick Edging , Toe Wall and CC Blocks etc. during the year 2025-26.
patch grouting, BPM,re-carpeting, pucca drain etc. from Ch. 0.00 km to 2.20 km.
Periodical renewal of completed PMGSY road from Chellagang Bazar to Barmatilla L-5.218 km Link No. L038 under Karbook Block SH- Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23.
Periodical renewal of completed PMGSY road from AT road to Haripur (Length-1.185 km) Link No L-026 under Ampi Sub-Division/SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, WBM-3, PMC, Sand seal coat etc
v Up gradation of road from Haldicherra PMGSY Road to Andharcherra High School via Tripura Bastiunder Pecharthal Assembly Constituency of PWD Rand B Kumarghat Division Length 1 725 KM under Scheme for Special Assistance to States for Capital
Periodical Renewal of completed PMGSY road from KK Road to Santipur Package NoTR0394 Link No L 054 Total length 1 point 717 Km during the year 2020 21 SH Grouting carpeting and sand seal coat etc Balance work
Periodical Maintenance of PMGSY road from Harina-Ailmara Road to Pranesh para(L-049) (L- 5.88km) during the year 2012-22 SH Patch metaling, Re-carpetting, sand seal coat, pucca drain, etc. at ch.1.50km to ch.7.38km
Periodical maintenance of PMGSY road (L032) from Mohan Chandra Para to Abhimanya Para (L 3.579 Km) under Khumulwng Sub Division during the year 2022 23 SH patch grouting, patch WBM III, Re carpetting, Seal Coat, unlined surface Drain...
Periodical Renewal of PMGSY road from KK Road to West kaulikura during the year 2020 2021 Link No. L 025, Package No. TR 03 46 R SH -Bituminous grouting, Re-carpeting and Sand Seal Coat. Length 2.139 km
Periodical renewal of completed PMGSY road from AT road to Kaifung (Length-3.35 km) Link No L-052 under Ampi Sub-Division SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, WBM-3, PMC, Sand seal coat etc.
Strengthening of PMGSY road from Nabincherra to Bagaicherra Road Via Joypur Link No 022 L 2 992 km under Suvarna Jayanti Tripura Nirman Yojona Scheme during the year 2023 24SH WBM 3Re carpeting Drainage work protection work etc
Periodical Renewal of completed PMGSY road from K K Road to Santipur Package NoTR 0394 Link No L054 Total length 1 point717 Km during the year 2020 to21 SH Grouting carpeting and sand seal coat etc 2nd call
Mtc of PMGSY handed over road from Manuvally TE to Samrucherra Battala Link No-L-042 Length - 2.324 Km during the year 2023-2024 SH Surface dressing, patch soling, matelling, Grouting, carpeting, road side drain, CD work etc
Maintenance of JB para - Billaram para PMGSY road to Ampi - Dangabari Road via Kupcherra TSR Camp (L - 3.86Km) under Gandacherra Sub-Division PWD(RandB) during the year 2021 - 22 / SH-Patch Flat Brick solling, Surface drain, Subgrade preparation,
FDR/Mtc road from PMGSY road to Lungfung School (Lungfung road, Length - 1.0 km) under Ampi Sub-Division during the year 2024-25/SH- GSB, WBM-III, Re-Carpeting with Paver finisher, Sand seal coat, Pucca Drain etc
Patch metalling, Grouting and Re-carpeting.
FDR/Urgent repair of Road from Asrai bazar to Khamper ( L- 2.0 km) during the year 2022-23/ SH WBM-3, Carpeting, Patch Soling , unlined surface drains etc. complete Ch. From 0.00 Km to 2.0 Km
Periodical repair of road from from NH 08 to Food Godown via PRTI from ch 0 km to 0 point 40 km during the year 2022 23 SH Patch metalling Grouting Carpeting Drain etc 2nd call
Periodical repair of road from Lankamura Auto stand to Lankamura Goshpara Under AMC Ward no_1 Under the jurisdiction of Construction Sub_Division _II, PWD (RandB) during the year 2023_24_SH_ Soling,, pothole repairing, ,Carpeting and Seal Coat.(Lengt
Periodical Repair of road from VIP road (Bharat Ratna Club) to Ananganagar Flour Mill (L-1.30 km)/SH Patch repairing, tack coat, carpeting, seal coat, road side drain etc. from Ch. 0.00km to 1.30km./2nd Call.
Periodical Repair of road Sarkar Majumdar Para Gr II L 0 pont 60 Km during the year 2023 24 under the jurisdiction of Ganganagar Sub Division SH Stripping WBM Soling Tack Coat Carpeting Seal Coating etc
Periodical repair of road from Kailashahar Golakpur road to Sarojini GP Office via Bara Line L0.63 Km roads in Jamtailbari during the year 2022-23 SH Patch soling patch metalling grouting recarpeting and seal coating etc
Periodical Repair of road from Gagan Chowdhury PWD road at Hridoy Debbarma house to PWD road under Kalyanpur R.D Block/ SH- Patch Metalling, Grouting, Re-carpetting etc. Under Kalyanpur R.D Block during the year 2023-24
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR IV
SDRF Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Central V Sub-Division SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR VI
Periodical repair of road from Alpana gram to Sharmalunga under AMC Ward no_1 Under Jurisdiction of Construction Sub_Division_II PWD(RandB) during the year 2025_26_SH_Road Side Pucca drain ,Grouting, Carpeting, Seal coat etc.(Length is 1.00 km)
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR II
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR I
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR V
Periodical repair of road starts from Agartala to Airport road to Mechanical sub division via Bhagat Sing Yuba Abas. (ward No.5), during the year 2022_23_SH_ Grouting , WBM, Carpeting , seal coat etc (Length is 450.00 m )
Maintenance of Agartala town road within the jurisdiction of central V Sub Division SH Repair of road By providing Carpeting, Grouting, Patch carpeting inc mtc of road side drain etc. under C V Jurisdiction GR III
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Central V Sub Division SH Repair of Road from Math Chowmohani to MBB College L 0.85 KM by providing BM, BC etc
Maintenance of Agartala town road during the year 2025-26 under the jurisdiction of Central-V Sub-Division SH Repair of road by providing Patch-repairing in/c mtc. of road side drain etc. 2nd Call
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Central V Sub Division SH Repair of Road from Modern club to Jogendranagar Bridge L 1.10 KM by providing BM, BC etc
Mtc of road from Kailashahar Murticherra road to Kailashahar Murticherra road via Madhai tila L 1.10 km Link road between Madhai tila and Phanindranagar TE L0.56 Km and Bhaterbazar PWD road L 1.60 Km during the year 2022 23 SH Patch metalling grouti