Loading…
Loading…
2,867 results • Best match
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
Earth filling, protection work and soling work etc
Earthwork PCC RCC Metallig Paver block et
SH construction of counterfort retaining wall , block pitching etc.
GSB WBM PMC etc (L 0.290KM)
Protection work, Gunny bags, earth filling etc
Construction of Compound wall, UG sump, internal road etc. at EMRS Hezamara, Dist.:- West Tripura, State- Tripura. (SH: Providing outsourcing of services (man power) for Division office, Sub-Divisions under TCD-II and Architectural assistant in office of the Chief Engineer (Architecture wing), CPWD, Gandhigram, Agartala during 2025-26)
Site Clearance,Earthwork, Protection Work,Road Side Drains,Granular Sub-base, Bases (Non-Bituminous) and Shoulders,Bases and Surface Courses (Non- Bituminous),Traffic Signs, Markings and Other Road Appurtenances.
GSB, WMM, PMC, Protection Work, Road Side Drain, etc. (Under RIDF-XXXI of NABARD).
under RIDF-XXIX of NABARD. (Job No.TP/COM/200/2023-24)
under RIDF XXIX of NABARD (Job No.TP/COM/ 199/2023-24).
Works
sanctioned for implementation under NABARD (RIDF-XX) Job No. TP/COM/23/2014-15 (3rd Call)/ Construction of approach road.
Construction of road from Premtala Hemshukla road to Pamchakaicherra under Laljuri RD Block under RIDF XXVIII of NABARD. (Job No.TP/COM/18/2023 24), (2nd Call)
Construction of road from Naluah PWD road to Sanjoy Tripura house via Lengtabari J.B. School, Khonimala Tripura house at Kailashnagar ADC village under Hrishyamukh RD Block.
Construction of road side RCC drain from n/h of Anu Chandra Das to Shib Mandir at RK Nagar GP under Old Agartala RD Block (180m)
Construction of road by paver block and brick masonry pucca drain from the H.O Sri Prabir Shil at Bhattapukur near Suktara Under ward NO 33,AMC.
Construction of road by paver block from the H.O Sri Kabul Sutradhar to Lunda Vanda Chowmuhani with RCC drain at Gazaria Under ward No 37,AMC.
Construction of road at near Justice A.B Pal 26, T.G. road Acharjee Jagadish Basu lane sarani opposite Ramnagar Road No-3 under Ward No-18, AMC
FDR Urgent mtc of road from Purnajoy High School to Burighat PMGSY road L 2.50 Km under Dasda Sub Division, PWD RnB during the year 2024 25 SH Patch grouting, Carpeting, Seal Coat etc portion from Ch 0.00km to Ch 1.25km.
Periodical renewal of completed PMGSY road (TR01250-09CC) from Bansi para to Latamura (L-2.175 km) under Hezamara Sub-Division during the year 2025 - 26/ SH WBM, Carpeting, Pucca drain, Retaining wall, unlined surface drains etc. complete Ch 0.0 Km t
FDR Maintenance of road from PMGSY road trijunction to the house of Sri. Akhil Das via Hatat bazar and Baldakhal Palpara,Malakar Para, Sarkartila, Daspara L 1.80 Km) under the jurisdiction of PWD (R and B) Khayerpur Sub Division..(2nd Call)
Periodical renewal of completed PMGSY road from AT road to Serthum Kalai Para (Length-3.288 km) Link No L-053 under Ampi Sub-Division SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, WBM-3, PMC, Sand seal coat etc.
Periodical renewal of completed PMGSY road from AT road to Chandramohan Para road L-2.97 km Link No. L036 under Amarpur Block SH - Pothole Repairing, Re-Carpeting, Seal Coat and all other alied works during the year 2022-23. 2nd call
Periodical Renewal of PMGSY Handed Over Road from Rajkumar para To Sovamani para( Monfort School) (L039 1.546 KM) under SJTNY of PWD(R and B), Khumulwng Sub Division during the year 2023 24, SH PatchWBM 3, Patch Grouting, Re Carpeting..
Mtc. Of PMGSY Road from Anandabazar to Bhandarima under Dasda Sub Division during the year 2023 24 Total Length 16.35 Km SH Patch Metalling Carpeting etc. Job No. TP COM 147 2022-23 Ch. 0.00 Km to 8.00 Km Gr I
Periodical renewal of completed PMGSY Road from KBK-JTB road to Jangi Das Para Length-2.538 Km Link No. L024 under Karbook RD BlockSH- Pot hole repairing, Re-carpeting, Seal Coat and other allied works, etc. during the year 2022-23.
Periodical renewal of completed PMGSY road from Karbook-Jatanbari road to Banka cherra (L-4.874 km) (Link No. L036) under Karbook Block/ SH-Pot hole repairing, Re-Carpeting, Seal coat and other allied works etc. during the year 2023-24
Mtc. Of PMGSY Road from Anandabazar to Bhandarima under Dasda Sub Division during the year 2023 24 Total Length 16.35 Km SH Patch Metalling, Carpeting etc. Job No. TP COM 147 2022-23 Ch. 8.00 Km to 16.35 Km Gr-II
Shifting of pipeline from new road alignment by PMGSY at Radhapur to madhubari road of Jubarajnagar Block of DWS Sub-Division Panisagar 2024-25/SH-Laying of UPVC Pipeline, other allied works attached to DTW/innovative Schemes at Radhapur (2nd Call)
Periodical renewal of completed PMGSY road from Madhufung to Kashipada para road (L-6.428 km) Link No-L048 including AN road to Barmatilla and Chellagang road under Amarpur Block/ SH - pot hole repairing, Re-carpeting (Mechanical means), seal coat an
Periodical repair of PMGSY road from Bagbari to Durgabari Link No. L054 (L-1.67 km) under Tripura Nirman Subarna Jayanti Yojona during the year 2023-24/SH patch repairing by BM, carpeting, seal coat, side berm dressing and drain etc.
Mtc. of PMGSY roads from Gurupada colony to Guru para (Kwtwi para) L044 and Mohan chandra para to Abhimanya para (Belbari bailey bridge) L032 under Khumulwng Sub-Division (PWD) during the year 2021-22 SH Spatch grouting, patch carpeting tack coat ..
Maintenance of road from Nishan Chandra Para to Noabadi PMGSY road Via Sharat Chandra Para (Length 2.55km) under Mandwi Sub-Division during the year 2024-25 SH Grouting, Patch carpeting, Tack coat, seal coat, surface drain and other allied works etc
Periodical renewal of completed PMGSY Road from KBK-SLC road to Chandrasingh Para Length-1.247 KmLink No. L027 under Karbook RD Block SH- Pot hole repairing, Re-carpeting, Seal Coat and other allied works, etc. during the year 2022-23.
Maintenance of PMGSY handed over road from Champamura to Bhatilarma L022 / Length 3 point 00 KM during the year 2024-25 / SH- Patch repairing patch metalling carpeting re-carpeting protection work and other ancillary works Potion from 1 point 00 K
Periodical renewal of completed PMGSY Road from KBK-SLC road to Gulomoni Para Length-3.54 Km Link No. L029 under Karbook RD Block/SH- Pot hole repairing, Re-carpeting, Seal Coat and other allied works, etc. during the year 2022-23.
Periodical renewal of completed PMGSY road from Karbook-Silachari (Nabajoy Para to Kuchi para (L038) and Satchandra para Tilla (L-6.797 km) (L025) under Karbook RD Block/ SH - pot hole repairing, Re-carpeting, seal coat and other allied works etc. on
Periodical mtc of PMGSY road from Borakha ADC Colony to Salgaria (L042) (Length 4.68 KM) under Mandwi Sub Division during the year 2022 23 SH Metalling, Grouting re carpeting ( 2.65 km) tack coat, sand seal coat, pucca drain etc and other...
FDR Maintenance of PMGSY Handed Over Road from Bikramthakur para To Brigubari (Biswamani para) (L029 1.700 KM) under Khumulwng Sub Division PWD(R and B) during the year 2024-25..at Chainage from 0.50 km to 1.70 km (Gr-I).
Maintenance of road from Ratannagar J.B.School to PMGSY Kaborkhola via Ratan nagar Muslim Para (L 1.00 Km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2025-26 SH Patch metalling, grouting, 20 mm carpeting..
Renewal of KMA Road to Balaram PMGSY Road (Link no-043) of Length-5.916 Km/SH-WBM-3, Grouting, Re-Carpeting, Seal Coat, Road Side Drain, Protection Wall, etc. (Chainage from 0.00Km to 5.10Km) (Job. No.TP/COM/116/205-26)
Periodical renewal of completed PMGSY road from Amarpur to Sarbong L-.77 km Link No. L039 under Amarpur Block SH-Pot hole repair, Patch metalling, Re-carpeting, sand seal coat and all other allied works etc. during the year 2022-23.
Periodical renewal of completed PMGSY road from Sagarati Uchai Para to Bhuban Para L-4.351 km Link No. L040 under Karbook Block SH- Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23.
Mtc. of Road from NH-08 (Guramara Bridge) to Kali Nagar via Durga Nagar (PMGSY) SH Construction of one Box Culvert (4.00 Mtr x 4.00 Mtr) along with demarcation of the road by providing RCC Pillar during the year 2025-26.
Periodical renewal of completed PMGSY road from A-T road to Ramkrishna Colony L-1.180 km Link No. L035 under Amarpur Block SH - Pot hole repair, Re-carpeting seal coat and all other allied works etc during the year 2022-23.
Periodical mtc of PMGSY road from Binan Kobra Para to Sridam Kobra (L039) (Length 3.752KM) under Mandwi Sub Division during the year 2022 23 SH Metalling, Grouting recarpeting tack coat, sand seal coat, pucca drain etc and other allied works.
Periodical renewal of completed PMGSY road from A-N road to Samatal Para L-4.320 km Link No. L045 under Amarpur Block SH- Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23
Periodical Mtc. of PMGSY road from Sabroom to Baishnabpur (T05) (Length 6.00KM) from ch.4.00 km to Ch 10.00 km during the year 2021-22 SH. Grouting, Re-carpeting, Sand seal coat, Unlined Surface drain, Maintenance of Earthen shoulder, etc