Loading…
Loading…
2,863 results • Best match
Earth Filling, Brick Solling, from ch-0.0km to 0.060km under Santirbazar Municipal Council.
Earth Filling, Pucca drain Brick Solling from ch-0.0km to 0.090 km under Santirbazar Municipal Council
GSB WBM II and III PMC Seal coat side shouldering road side drain Retaining wall etc. Length 2.625Km under Scheme for Special Assistance to States for Capital Investment for 2024 25
Metalling carpeting road side drain and toe wall etc
via Chaitmura, Tufania Mura under Golaghati Constituency Assembly (5.00km).
Pucca drain, Cross drain (RCC), Earth cutting, Earth Filling, Brick Solling, Pelasiding etc. under Santirbazar Municipal Council.
Block Pitching, Brick Solling etc. under Santirbazar Municipal Council.
Cross drain, Earth Filling, Brick Solling, Pelasiding etc. Under Santirbazar Municipal Council.
Construction of Approach road for RCC Bridge during the year 2019-20/SH-Soling, edging, turfing etc.(2nd call).
Construction of road with paver block and drain from Vivekananda Sushunikatan to last part of the road at ward no 8 under Jirania Nagar Panchayat
Construction of road by paver and drain and slab from the H.O Mrinal Kanti Bhowmik to the H.O Mukul Deb, under ward no.05, AMC
Construction of road by CC and allied works near H.O Ranjit Biswas to Jayanta Saha via Manti Gowala at Khejurbagan, under ward no.04, AMC
CONSTRUCTION
FDR/Urgent construction of Retaining wall on road from JB para to Bhagirath para PMGSY Part-II to Bhagirath para BOP (Length - 4.50 km) / SH- Retaining wall, back filling etc. portion from ch. 0.00 km to ch. 4.50 km.
Periodical renewal of completed PMGSY road from Sindujay para to Jogendra para (L-4.704 km) (Link No. L022) under Karbook Block/ SH-Pot hole repairing, Re-Carpeting, Seal coat and other allied works etc. during the year 2023-24.
Periodical renewal of completed PMGSY road from Bengali para to Santi colony L-2.23 km Link No. L021 under Karbook Block. SH-Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23.
Periodical maintenance of PMGSY road from Hapania to Ramkrishna Palli L 025 under Amtali PWD RnB Sub-Division during the year 2023-24/ SH-Patch WBM Grouting Carpeting Premix seal coat CC Drain and other necessary works Length 1point352km
Periodical maintenance of road from Vullongbassa to Dalapati Para (L-028) PMGSY road taken over by PWD (RandB) (Length - 3.944 km) during the Year 2022-23 / SH- Patch WBM-3, Re- Carpeting, Tack Coat, Seal Coat etc. (4th Call)
3. Urgent FDR of roads (i) Chundal Tree , (ii) NH08 (near Matabari H.S. School) to Brahmachara PMGSY road, Under Matabari block, Gomati, Tripura/S.H Patch repairing, WBM, Carpeting and allied works during the year 2024-25 (L-1.78 Km)
Periodical renewal of PMGSY handed over road from Birchandra Thakur para to Parichibari (L047) L 5.458 km under SJTNY under PWD(R and B) Sub Division Khayerpur during the year 2023 24 SH Patch metalling, patch grouting, re carpetting...
Mtc. of PMGSY roads under Teliamura Division during the year 2023-24./ Periodical maintenance of road from Rupa Ch. Para to Mayungdal Para (L032), L-4.963 km, under Mungiakami R.D Block./ SH- patch metalling, re-carpeting, seal coat etc
Periodical renewal of PMGSY road Karbook-Silachari (Laxman Para) to Jogendra Chakma Para (L023) and Jatanbari Fire service to Chellagang Bazar road under Jatanbari PWD (R an B) sub-division/ SH - WBM-III, grouting, carpeting, sand seal coating, Pucca
Periodical renewal of completed PMGSY road from AN Road to Sukanta Colony L-2.316 km Link No. L044 under Karbook Block SH- Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23
Periodical Renewal of completed PMGSY road from T02 (US road to Madhyapara) to Madhyapara (Length 3.004 km) Link No. L040 under Sabroom Division during the year 2022-23 SH Repair of pot holes, re-carpeting and seat coat etc
Periodical renewal of completed PMGSY road from Lowgang Khumulongbari to Manai Para L-2.40 km Link No. L037 under Karbook Block SH- Pot hole repairing, re-carpeting, seal coat and other allied works etc during the year 2022-23
Periodical renewal of PMGSY handed over Road from Kalamchowra to Veluarchar (Link no T02) (L-4.709 km)under Boxanagar Block during the FY2025 26Striping excess soil WBM2 WBM3 Carpeting SealCoat Puccadrain and otherallied works JobNoTP/COM/92/2025 26
Mtc of PMGSY road(L035) from T02(Harina-Ailmara road to Jalafa Sonai )to Nantu Tripura road(L-2.36km) under Rupaichari RD Block during 2021-22 SH Re-Carpeting, Pot holes repairs, Pucca drain and unlined surface drain, etc
Periodical Renewal of completed PMGSY road from Betcherra to Rubber Garden Package No TR 0389 Link No L029 Total length 2 point 363 Km during the year 2020 to21 SH Grouting carpeting and sand seal coat etc 2nd call
Periodical renewal of completed PMGSY road from Jogendra Para to Rasidas Para (L-4.254 km) (Link No. L042) under Karbook Block/ SH- Pot hole repairing, Re-Carpeting, Seal coat and other allied works etc. during the year 2023-24
Periodical mtc. of PMGSY road from Shibsankar Para to Asta Jungal (Link 074) under Jirania Sub Division, PWD (R and B) during the year 2022 23 (L 1.97 Km) SH Patch grouting, Patch metalling, re carpetting and allied works.
Construction of 03 Nos Box culvert at i) Ramthakur RPS to Niranjan Pal house, ii) PMGSY road to Nanda chara AWC, iii) Barpathari -Tulamura road to Thampaiya JB school of Jashmura GP under Rajnagar RD Block (PWD SoR-2023)
Periodical Renewal of completed PMGSY road from T03-US Road (Manu Bazar) to Manughat Para (L-8.493 km) Link No.T03 under Sabroom Division during the year 2022-23 SH. Repair of pot holes Re-carpeting and seat coat etc
Periodical renewal of completed PMGSY road from Raibahadur Para to Surjyaham Para road (L-4.279km) Link No. L046 under Amarpur Block /SH - Pothole repairing, Re-carpeting (Mechanical means), seal coat and all other alied works etc. during the year
Urgent repair of road from Boiragy para to Raja Chowmohani( L-0.70 km) during the year 2024-25/ SH Patch WBM-3, Carpeting, Jungle clearance, unlined surface drains etc. complete Ch. From 0.0 Km to 0.70 Km.
Periodical repair of road from K K road to K K road via back side of PWD Sub Divisional Quarter complex Total length 200 mtr during the year 2022 23 SH Metalling Carpeting and Seal coat etc
Periodical Repair of road starting from Old AA road to Darchawi upto Railway over Bridge during the year 2023 24 length 0 point 50 km SH Soling WBMII WBMIII BM 25mm thick carpet and Earthen drain etc
Periodical repair of road from K K road to Sonaimuri Halambasti Total length 1 point 50 Km during the year 2022 23 SH Metalling Carpeting and Seal coat etc Ch 1 Km to 1 point 50 Km
Periodical repair of road from KK road to KK road via Ujjal Malakar house L 450 pt 00 mtr during the year 2023 24 SH Earth Filling Soling WBM-III Carpeting Seal Coat and protection work etc
FDR/ Urgent repair of road from MBBChowmuhani to Asrai bazar ( L- 2.95 km) during the year 202-25/ SH Patch WBM-3, Carpeting, Jungle clearance, unlined surface drains etc. complete Ch. From 0.0 Km to 2.850 Km.
Periodical repair Of road from KF road near the house of Prasanta Sarkar to Radhanagar via Tarapur during the year 2022 23 SH Carpeting and Seal coat etc ch from 0 km to 1 point 00 km
Development of Road during the year 2025_26_ Periodical Repair of Road starts from Nandannagar H.S School Chowmuhani to Debram Thakur para under AMC ward No_6 during the year 2025_26 Under jurisdiction Construction Sub_Divn_III (Length is 0 plus
Periodical Repair of road from NH-08 to Twisama under PWD(R and B), Sabroom Division during the year 2024-25/ SH - WBM, PMC, CD, and Pucca drain etc. (Chainage from 8.087 km to 8.937km) (2nd Call)
Periodical repair of road starts from Secretariat Gate Near Electric Vehicle Charging Station (Back side of Secretariat) to Secretariat Approach via Back side Gate of Tripura Legislative Assembly, New Capital Complex, during the year 2024_25 _ SH_ B
Periodical Repair of road starting from Bholagiri ashram Tri_junction to Barjala Main road (Ch.0.00 to 0.80 km) under AMC ward No_4 during the year 2025_2026 _ SH_ Brick Soling ,Prime coat, DBM , BC and other allied woks.
Periodical repair of road from Holy Cross School (Gate No.2) to VIP road (Durjoynagar) (L 0.0.620km) and Kathaltali to Dighalia Tri junction road (L 1.00km) during the year 2022-23/SH Patch repairing, Carpeting, Seal Coat.
Patch Metalling , Grouting and Re-Carpetting.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
Earth filling, protection work and soling work etc