Loading…
Loading…
2,867 results • Best match
Periodical renewal of completed PMGSY Road from SLC-Ailamra road to Debendra Para Length-1.575 Km Link No. L022 under Silachari RD BlockSH- Pot hole repairing, Re-carpeting, Seal Coat and other allied works, etc. during the year 2022-23.
Periodical renewal of completed PMGSY road from AT Road to Muslim para road (L059) and Abhi Roaja Para (L057), Deshram Khamar Para (L026) and Samkrishna Para (L028) (Length - 4.771 km) under PWD (RandB) Karbook Sub-Division/ SH - Protection Work, GSB
Periodical renewal of completed PMGSY road from Rangacherra to Dalak Khamar road (L-2.305km) Link No. L047 under Amarpur Block SH - Pothole repairing, Re-carpeting (Mechanical means), Seal coat and all other alied works etc. during the year 2023-24
Periodical mtc. of road from Taraban colony to Noboda para (L023) PMGSY road taken over by PWD(RnB) (L- 5.106 km) under SJTNY of DNR block during the year 2023-24/SH- Patch WBM-3, Carpeting, sand seal coating etc.
Periodical Renewal of PMGSY handed over road from A.A. Road (Jirania) to Mandai (Link No T 01) (Length 5.992 Km) (Pakage No TR 01 208) under PWD(R and B) Mandwi Sub Division, Mandwi Block during the year 2023 24
Periodical renewal of completed PMGSY road from A-N road to Bangali para (L-6.543 km) (Link No. L040) under Amarpur Block/ SH- Pot hole repairing, Re-Carpeting, Seal coat and other allied works etc. during the year 2023-24.
Laying brik soling from Swapan Debnath to Nepal Debnath house,Takhuranjan Das to Saranga Dey house,Samir Dey to Saranga Dey house,Radhanagar Ragamura PWD road to Kalipada Chakraborty house,Sudhir Dey to border fencing ,pmgsy road to Arpansaha road.
Periodical maintenance of PMGSY road from Hapania to Madhabpur Link No L T05 under Amtali PWD RnB Sub Division during the year 2023-24/ SH Patch WBM Patch repairing Carpeting Premix seal coat CC Drain and other necessary works Length 3point773km
Periodical renewal of PMGSY road from Jatanbari Fire Service to Chellagang via Nizachandrapara L- 10.87 km under Karbook Block Package No.TR-02-12 Stage-II SH- Patch Grouting, WBM, Re-Carpeting, Sand seal coating etc. during the year 2021-2022 Base
FDR/ Urgent mtc of road from Purnajoy High School to Burighat PMGSY road (L 2.50 Km) under Dasda SubDivision, PWD (RnB) during the year 2024 25/ SH Patch grouting, Carpeting, Seal Coat etc portion from Ch. 1.25km to Ch. 2.50km.
Mtc of PMGSY road from Khedacherra to Duganga in different chainages Total Length 7 004 KM under Damcherra Sub Division, PWD R B during the year 2022 2023 SH Patch metalling, carpeting, seal coating etc. Link Pakage No TR 03 13ST2.
PR of handed over PMGSY road from Mohanbhog Taibandal Road to Lampacherra (L040)(Ch-2.010km to 3.010km, L-1.0km) (Total PR Length 1.0 km) within Mohanbhog RD Block during FY 2025 26 SH Patch Metalling Grouting Recarpeting and allied works(2ndcall)
Periodical Repair of completed PMGSY road from AA road to Dudpur Link No L025 Total Length 2 000 Km during the year 2023 24 SH Patch GSB Patch metelling Grouting Carpeting etc Ch 0 750 Km to 2 750 Km
Development Of road from Andhercherra NEC road to Andhercherra PMGSY Road via East Andhercherra Panchayet Office L 0 750 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface dr
Periodical repair of (I) Road of TIT back side (Length is 0.400 km) Under AMC Ward no_2 (II) Road from Narayanpur Bazar to Airport road (Length 0.175 km) (III) Link road (From the House of Sanjay Nag to House of Bimal Biswas Airport Boundary) Unde
1. Urgent FDR of road from Metro Bazaar to Udaipur SBI Branch via V-Mart, Kiron Petroleum and Tripura sundari sub-divisional hospital in/c link road from V-Mart to Chak Bazar via Nehru Super market, Tripura State Co-operative Bank, Udaipur(2nd Call).
Maintenance of Link Road from Satchand - Bankul Rd. to Harina - Ailmara Rd. to Raj Kumar Para (L-0.250 Km) in between Ch.0.000 km to Ch.0.250 km during the year 2024-25/ SH - Patch metalling, Re- Carpeting and Sand seal coat etc. (2nd Call).
Periodical repairs of Agartala town road during the year 2021 22 SH By providing Bituminous concrete etc. in i. Santipara pond to Central road via Aikatan club road, ii. Kailash Singh Sarani,iii. Link Road 1 Of Kailash Singh and Dr. Shyma Prashad Muk
Periodical repairs of Agartala town road during the year 2021 22 SH By providing Bituminous concrete etc. in i. Kaman Choumohani to Jackson Gate, ii. Link Road 2 Of Kailash Singh and Dr. Shyma Prashad Mukharjee Lane, iii. Ramnagar Road No.1, iv. Ramn
Improvement of link road from NH 44 Ratan Rakshit house to Sri Dayal Datta house at Reshambagan Ward No.09 during the year 2020 21 SH Metalling, Carpeting, Construction of drain, CD structure and protection work Length 0.150Km Job No.TP COM 21 2021 2
Periodical Repair of road from A A road to Citagangee Basti L 2 point 340 KM during the year 2021 22 SH Patch Metalling carpeting and seal coat etc from ch 0 Km to 1 point 20 Km
Urgent flood damage repair of road from Kanchanbari Demdum road Emrapassa L 3 20KM during the year 2024 25 SH WBM Stripping Katcha drain carpeting portion from Emrapassa bazar end Ch 1 10 km to 2 50 Km
Urgent Flood Damage Repair of road From Fatikroy Jagannathpur road to Radhanagar via Tarapur L 2 50 Km during the year 2024 25 SH WBM Patch repairing Carpeting Protection work Ch 1 00 km to 2 00 Km
Periodical Repair of road Mahim Chowdhury Para SB School to Emrapassa (L 0 60 Km) during the year 2024 25 under the jurisdiction of Ganganagar Sub Division S H Stripping WBM Soling Tack Coat Carpeting Seal Coating etc
Urgent flood damage repair of road from Rahimpur Bazaar to IBB road (L-0.510 km) under Boxanagar PWD (RB) Sub Division for the year 2024 25 SH Soling WBM3 Carpeting Seal Coat Pucca Drain and other allied works
Periodical Repair of road from Old NEC to Demdum Gr II L 0 pont 50Km during the year 2023 24 under the jurisdiction of Ganganagar Sub Division SH Stripping Gunny Bag Soling Tack Coat Carpeting Seal Coating etc
Periodical Repair of road from A A road to Citagangee Basti L 2 point 340 KM during the year 2021 22 SH Patch Metalling carpeting and seal coat etc from ch 0 Km to 1 point 20 Km
Urgent flood damage repair of road from Kanchanbari Demdum road Emrapassa L 3 20KM during the year 2024 25 SH WBM Stripping Katcha drain carpeting portion from Emrapassa bazar end Ch 0 00 km to 1 10 Km
Development of Road during the year 2025_26_Periodical Repair of Road starts from By pass to West Chanmari via Agartala International School (Length is 1 plus .300 Km) during the year 2025_26 Under jurisdiction Construction Sub_Divn-_II ) _ SH_ PMC,
Periodical Repair Of road from Narayanpur market to West Narayanpur BOP extented upto Sripally and Lankamura Airport corner (Total Length 6.52 Km)(Ch_5.00 km to 6.52 km) L_1.52 kmUnder AMC Ward No_1.Under the Jurisdiction of Construction Sub-
Periodical repair of road from Bhuban Motorstand to Shanmura SPT bridge via Lankamura main road (Ch.0.00 km to 0.900 km) Under Construction Sub_Division_II PWD(RandB) during the year 2025_26_SH_ Road Side drain ,Grouting, Carpeting, Seal coat etc.(
Periodical repair of road from Lankamura High School to Lankamura Old Auto Stand under AMC Ward no_1 Under Construction Sub_Division_II PWD(RandB) during the year 2024_25_SH_ Road Side RCC drain ,Grouting, Carpeting, Seal coat etc.(Length is1.20 km).
Development of Agartala town road during the year 2025-26 within the juridiction of AMC Ward no 09, i Morium Nagar HS School to Yatrabari road, SH Repair of road By providing Grouting, WBM 3 and Patch-carpeting
Development of road during the year 2025_26_SH_ Periodical repair of road Lankamura Old Auto stand to Loknath ashram chowmuhani(Ch. 0.40 km to 1.50km) Under Construction Sub_Division_II PWD(RandB)_SH_ Grouting, Carpeting, Seal coat etc.(Length 1.10 k
4. Baramaidan Road to Bashikobra Bazar(ch. 0.00 km to 0.750 km) 5. R.S para to Raidasi Para via Gagan ch. (ch. 1.00 km to 2.50 km)/ SH- Patch Metalling , Grouting , Re-Carpetting etc. Under Kalyanpur RD Block during the year 2022-23.
CONSTRUCTION
Earth Filling, Pelasiding, Brick Solling from ch-0.0km to 0.300km, under Santirbazar Municipal Council.
SH WBM III Carpeting with sand seal coat Pucca drain and other allied works (Job No TP COM 263 2025 26) under Special Assistant
Roads under AMC Ward No. 43.
Patch metalling, Bituminous grouting, Patch carpeting, Brush seal coat and other allied works.
Re-carpeting, Bituminous Grouting, Seal coating i/c road side drain both kutcha pucca etc.
FDR
RETAINING STRUCTURE
Metalling,modified penetration macadam,carpeting,seal coat,pucca drain
SH- Construction of RCC boxcell, approach road, mtc. of existing RCC boxcell, return wall for protection of road side erosion etc
sanction for implementation of under NBARD(RIDF-XXIII), Job no TP/COM/17/2018-19(2nd call)/ Construction of Approach road.
Construction of Bio-Medical Waste and other disposable item segregation room in/c approach road and site development near old Mortuary
SH- Additional Works including False Ceiling, ACP Board installation on Grand Stand, Painting, Railing of Gallery, and Approach Road Development etc.
Periodical repair of road from MachmaraKrishnatilla road to PecharthalKanchanpur road Via Joymoniparagovt fruit garden Total Length 5 point 20 km during the year 2021 22 Patch Soling Patch metalling Carpeting Re carpeting Seal coat etcCh 1 point 20 k
Periodical Repair of road starting from Kumarghat Darchawi road to KN road Length 1 Km under Sukantanagar GP During the year 2021 22 SH Patch metalling grouting carpeting and seal coat etc from ch 0 point 50Km to 1Km