Loading…
Loading…
2,863 results • Best match
Patch grouting,patch metaling,BC,Pucca drain from Ch. 2.80 km to 5.40 km
under Satchand RD block (L-5.175 Km) under RIDF-XXIX of NABARD. (Job No.TP/COM/201/2023-24)
Patch grouting,patch metaling,BC,protection work,pucca drain etc. from Ch. 13.90 km to 16.20 km
SH Re-grading, widening, metaling, B.M, carpeting, retaining wall, Box- cell culvert etc. (Job No.TP/COM/120/2016-17) (6th Call)
SH- Construction of Internal Roads /SH-Construction of GSB,WBM,PMC, 1(one) no C/D ,Drain,Main Gate and cycle stand(3rd Call).
SH- Construction of Internal Roads /SH-Construction of GSB,WBM,PMC, 1(one) no C/D ,Drain,Main Gate and cycle stand(2nd Call).
Construction of road side RCC drain from PWD road to Ratan Paul house at Dalura GP under Old Agartala RD Block (80m)
Construction of road with R/wall from the H.O Sri Sudhir Biswas to the H.O Ashu pal Under ward No 37,AMC.
Construction of road with drain from the H.O Nikhil datta to H.O Debnath at ONGC bank Chowmuhani under ward No 48 AMC.
Construction of road by paver block from the H.O Khokan Paul to Hiralal Das at S.D Mission under Ward No-38, AMC
Periodic repair of Road from Fari Bari to amagashy ( L-1.8 km) during the year 2023-24/ SHWBM-3, Carpeting, unlined surface drains etc. complete Ch. From 0.00 Km to1.80 Km./2nd Call.
FDR/ Urgent Repair of Road from Niran para to Jagat pur ( L 6.41 Km) during the year 2024-25/ SH Paver block, WBM-3, Carpeting, Toe wall etc. complete./ Gr-I 2nd call
Periodical repair of road from Gopalnagar to Maharani road (L-7.484 km) portion from 2.00 km to 7.40 km during the year 2024-25./SH- Pucca drain, Patch metalling, carpeting etc.(2nd call
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Banamalipuir Area SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc
Periodical repair of road from Lankamura Malakarpara to Lankamura high school under AMC Ward no_1 Under Construction Sub-Division_II PWD(RandB) during the year 2024_25_SH_ Grouting, Carpeting, Seal coat etc.(Length is1.20 km).
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Shivnagar Area SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc
Periodical mtc. of handed over PMGSY road from Kalamkhet to Jharjaria (L-044, Length-7.68 km) under Mohanbhog RD block/SH- GSB, Patch WBM, grouting, recarpetting, CD, CC drain, protection work etc and allied works
Periodical Renewal of completed PMGSY road from US road to Hawaibari (Length 3.60km) Link No. L062 under Sabroom Division during the year 2022-23 SH Repair of pot holes Re-carpeting, and seat coat etc
Maintenance of PMGSY handed over road from Old Agartala to Chandrapur via Baldakhal (L 3.50 km)(Link No-L067) under the PWD (R and B) Khayerpur Sub-Division during the year 2024-25..Group-I
Maintenance of PMGSY handed over road from Old Agartala to Chandrapur via Baldakhal (L 3.50 km)(Link No-L061) under the PWD (R and B) Khayerpur Sub-Division during the year 2024-25..Group-II
Periodical renewal of completed PMGSY Road (Link -34 ) from Balghanti to Abhiram para, (L- 2.049) under SJTNY (SL No-195)/ SH WBM-3, Carpeting, unlined surface drains etc. complete. Ch 0.0 Km to 2.049 Km.
FDR to PMGSY handed over road from Sarkar tila to Champamura Bazar (L_ 4 point 30 Km) during the year 2024_25_SH_Patch repairing, patch metalling, carpeting, recarpeting, soling, protection work, pucca drain and other ancillary works
Maintenance of road from Ratannagar PMGSY road via Kabarkhola to near Ratannagar J.B.School(L 1.00 KM) during the year 2021-2022 SH Patch grouting, Re-carpeting , Sand Seal coating and stripping of excess soil etc.
Mtc.of Road from Link Road of Sonai Bazar-Mahamuni ST Colony to Rupaichari RD Block (L-0.50km) in between Ch.0.00 km to Ch.0.50 km during the year 2022-23 SH. Patch metalling, Carpeting, Sand seal coat etc.
Mtc. of Agartala town road during the year 2022 23 Road Portion from i Link Road of Santipara ii Madhya para road iii Paradise chowmuhani Quarter complex road SH Recarpetting etc. under the jurisdiction of Central III sub Division
Repairing and Imp.of the road by road side wall and paver block in the north side of Kali bari Srinagar Under AMC Ward No 45,from Stadium link road ( Vacant Plot of Mrs. AparnaDatta towards west direction PWD Road.
Improvement of road from Santirbazar to Kurma via Devipur (L- 28.876 Km)
Improvement of road from NH 08 to AndharcherraPanchayet office via Andharcherra Health Sub Centre Total length 0 point 75 km from Ch 0 point 45 km to 0 point 75km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH GSB WBM Carpetin
Improvement of road from Narayanbari Ration Shop to Office Tilla under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting and other allied works. (L 0.40 Km, Ch 0.00 to 0.40 Km) Gr-I.
Improvement. of road from Narayanbari Ration Shop to Office Tilla under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting and other allied works. (L 0.38 Km, Ch 0.80 to 1.18 Km) Gr-III.
Improvement. of road from Narayanbari Ration Shop to Office Tilla under PWD (R and B) Jirania Sub-Division, during the year 2025-26 SH Patch brick soling, WBM-2, WBM-3, Carpeting and other allied works. (L 0.40 Km, Ch 0.40 to 0.80 Km) Gr-II.
Improvement of road starting from Radhanagar bus stand near new AMC Ward Office12 to Abasan Quarter Complex upto RCC box cell at Radhanagar from ch 0 Km to Ch zero 182 Km under AMC Ward No 12 during the year 2019 2020 SH GSB Brick Work
Construction of approach road by Soling, Metalling, Paver block, C.D. structure, Protection wall and other allied works.
SH Construction of approach road SH Retaining Wall Earth filling Metalling Carpetting Block pitching Pucca Drain Etc
Construction of approach road on west side (Vitorgul end) including 1 (one) no CD and protection work.
Providing yard illumination in the premises and approach road of Amarpur Sub Divisional Hospital Amarpur Gomati Tripura
S.H Construction of approach road by Earth filling, CC block, brick soling and Turfing, etc. (Gr I)
Earthwork, CC work, RCC work, Brick work, Wood and PVC work, Flooring, Finishing work etc
Construction
Periodical repair of Road fromNH-108-B to Hezamara PHC (L-0.450 Km) during the year 2025-26/ SH Unlined surface drains granular sub Base,WBM-2, WBM-3, patch repair, Carpeting, etc. complete.
Periodical repair of road from Lankamura (Goshpara to Nathpara under AMC Ward no_15 Under Construction Sub_Division_II PWD(RandB) during the year 2025_26_SH_ Road Side drain ,Grouting, Carpeting, Seal coat etc.(Length is 0.900 km)
Maintenance of Agartala town road under the Jurisdiction of Central V Sub division SH Repair of road by providing Bituminous Macadam and Bituminous Concrete, GSB, Paver block inc Maintenance of road side drain GR_II
Maintenance of Agartala town road under the Jurisdiction of Central V Sub division SH Repair of road by providing Bituminous Macadam and Bituminous Concrete, GSB, Paver block inc Maintenance of road side drain GR_I
Maintenance and Development of Agartala town road during the year 2025 26 SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc. at Nutan Palli, Banamalipur, Agartala
Maintenance of Agartala town road under the Jurisdiction of Central V Sub division SH Repair of road by providing Bituminous Macadam and Bituminous Concrete, GSB, Paver block inc Maintenance of road side drain GR_III
Periodical repair of road starts from West Narayanpur BOP to Narayanpur market under AMC ward No 1 during the year 2021_22_SH_ Re carpeting, grouting, WBM, seal coating and other allied works. (Length is1.0 km)
Periodical Renewal of completed PMGSY road from L023 to Changra Para (Length 2.168 km) Link No. L025 under Sabroom Division during the year 2022-23 SH. Repair of pot holes, Re-carpeting, and seat coat etc
Periodical renewal of PMGSY road from Gournagar to Sonamukhi during the year 2020 2021 Link No. L 026, Package No. TR 03 46 R SH Bituminous Grouting, Re carpetting and Sand Seal Coat Length 1.144 km.
Renewal of handed over PMGSY road from Sonamura Taxapara Road to Landless Colony (L068) (L-2.41 km) within Nalchar RD Block Sepahijala Tripura during the year 2025 26 SH Patch WBM Grouting Recarpeting and allied works
Urgent Mtc. Of road from US road to Madhya Para (L-12.995 km) PMGSY Road during the year 2025-26/SH- WBM-III, Carpeting, Seal Coat and protection work etc. (Job. No.TP/COM/112/2025-26)