Loading…
Loading…
2,867 results • Best match
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
WBM-III, Carpeting and Re-carpeting, Repairs of Potholes, Seal coat etc.
Repair of pot holes, Re-carpeting etc.
WBM- 3, Carpeting and Re-carpeting, repairs of potholes, seal coat etc.
WBM- 3, Carpeting and Re-carpeting, repairs of potholes, seal coat etc.
Periodical Repair of road i Geetanjali Lane L 150 00 mtr ii Shibsakti Lane L 150 00 mtr iii Old AA road to Bhabatarini Mandir L 150 00 mtr under Kumarghat Municipal Council iv NH 208 to NH 208 via Nikhil Namasudra house L 450 00 mtr
Periodical Repair of road from Teshil Office to Pecharthal Railway Station Road via Srikanta House L 0 point 250 km from Cl 0 point 00 km to Ch point 0 point 250 km under PWD R B Pecharthal Sub Division during the year 2023 24 SH Patc
Development of Agartala town road during the year 2025-26.within the juridiction of AMC Ward no 09, i Ichamua main road to kajol Mazumdar house, ii NH 08 to Das para road kashipur, SH Repair of road By providing Grouting, WBM 3 and Patch carpeting e
Periodical repair of road from Machmara kumarghat KN road to Krishnatilla Bazar via Laxmanpur Total length 7 point 041 Km during the year 2021 22 SH Patch soling patch metalling carpeting re carpeting seal coat etc from Ch 3 point 60 Km to 4 point 8
Periodical repair of road from Kumarghat fatikroy road to Kumarghat fatikroy road via Harimohan sinha house Total Length 1 point 30 km during the year 2021 22 SH Grouting carpeting seal coat etc CH From 0 point 90 km to 1 point 30 km Gr II
Periodical Repair of road from NH 08 to Kalamjoy para via Sonarampara community Hall L 3 50 Km from Ch 0 00 Km to Ch 0 400 KM under PWD RandB Pecharthal Sub Division during the year 2024 25 SH Patch soling WBM 3 Carpeting Seal Coat
Periodical Repair of road from Fatikroy Bridge to Fatikroy School road via Hospital road L 1 point 50 Km during the year 2021 22 SH Stripping Patch repairing Soling Carpeting and Seal coat etc from Ch 0 point 700 Km to 1 50 Km Gr II
Urgent Flood Damage Repair of Road from TD Road to Chowkidar Para from CH.0.90KM to CH.1.12 KM under Damcherra Sub Division, PWD R and B during the year 2024 2025 SH WBM III, Carpeting, Seal coating, Surface Drain,Pucca drain, Box Culvert, Return Wa
Maintenance of road from i T.D road to Damcherra H.S School road from CH.0.05 km to CH.0.25 km Length 0.20 km SH Pucca Drains, Cement Concrete Pipe NP2 etc ii Periodical Repair of road from Khedacherra Duganga road to Kalagang Sarkhi J.B school roa
Periodical Repair of road from T K road to Prafula House via Shiv Mandir L 0 260 Km from Ch 0 00 Km to Ch 0 260 KM during the year 2025 26 SH Patch Soling WBM 3 Carpeting Seal Coat Surface Drain and Toe Wall
Periodical Repair of road starting from (i) Barjala Main road near Ramnagar out post to H_O Abbash Mia connecting with Das para Road (Ch.0.00 Km to Ch 1.20 Km) (ii) Bazar india to Pragati bridge via Radhamadhab Unnayan Sangha to AMC ward no.12(Ch.0
Jampuijala PHC,Sepahijala District.
Metalling, Re-carpeting, Seal coat, Protection work and other allied works
Maintenance of Ichabpur road during the year 2019 20 SH Construction of road sde pucca drain in Ward No. 2 of Ichabpur Gram Panchayet nea the house of Sarajit Sinha L 150.0 mtr
Construction of road (Green Corridor) from Shyamali Bazar (Near Sainik Board Office) to the Trauma Centre of GBP Hospital, Agartala (Length is 286.60m) for plying of critical patients vehicles to the Trauma Centre.
Mtc. of road from Barman Bari to Krishna Das house at end point of Panchayet Para road including construction of road side drain of UMC ward No-16 during the year 2022-23
Protection work, drain etc. during the year 2024-25 under PWD(RnB), Chawmanu Sub-division
Retaining wall, drain, bats filling etc. during the year 2024-25 under PWD(RnB),Chawmanu sub-division.
Patch WBM, pot holes correction, carpeting, seal coat etc.
122/BLG-MC/eDNIT/2020-21
Metalling,carpeting,seal coat etc.
Earth work, Drainage work, CD work Granular base course and sub-base, Bases and surface course and Traffic signs.
GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.50 KM)
Jolaibari-Kowaifung road to Gandifa Reang via Nath para (L-1.35 Km) and Kalashi Bazar to Patichari via Lichubagan (L-1.75 Km) under RIDF-XXIX of NABARD. (Job No.TP/COM/205/2023-24)(2nd Call).
GSB, WBM and PMC etc.
SH. Earth Cutting for widening, Missing soling, Metalling, Carpeting seal coat and construction of pucca drain etc. (Portion from 2.00 km to 3.050km)
GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.20 KM)
Patch grouting and carpeting etc
Patch grouting and carpeting etc
Patch Soling, Patch Metalling, Grouting, Re-carpeting, Sand seal coat, pucca drain and other allied works./ 3rd Call.
Stone grouting, Tack coat using hot bitumen, Carpeting, Seal coat etc
Construction of Road from NH-08 (Jalefa Bazar) to Ramji Para in rural area (L-0.850km) under Satchand R.D. Block SH. Construction of CD, brick soling, protection wall etc. during the year 2022-23
Improvement and Construction of Road from Ashwani Market Road at Ishanchandra Nagar Kismat Kuri to the House of Sudhan Roy L_720mtr under AMC Ward No 50 SH Patch Soling WBM Carpeting RCC drain etc
Widening / Repair / Maintenance of stretch of Road to New Super speciality Block of AGMC and GBP Hospital / SH Drain work, Road work with other ancillary work etc. under FY 2021-22
Urgent Flood Damage Repair of Road from i TD Road to Paiza Basti via Forest Range Office from CH.0.00KM to CH.1.60 KM ii Damcherra Khedacherra road to Kohila SB School from CH.0.00KM to CH.0.50 KM under Damcherra Sub Division, PWD R and B during the
Periodical Repair of road from Nalkata Panchayat Office road to Dipak Debnath House Via Nalkata Sub Centre L 1 160 Km from Ch 0 00 Km to Ch 0 500 KM during the year 2025 26 SH Patch Soling WBM 3 Carpeting Seal Coat Surface Drain 2nd call
Periodical Repair of road from KK road to Rabindra sarani L 1300 point 00 mtr during the year 2023 24 SH E Cutting comma Soling comma WBM III comma Carpeting and Seal Coat etc point from Ch point 300 point 00 mtr to Ch point 800 point 00 m
Periodical Repair of road from KK road to Rabindra Sarani Total Length 1300 pt 00 mtr during the year 2023 24 SH Earth Filling Soling WBM-II WBM-III Carpeting Seal Coat and protection work etc from Ch 0 pt 00 mtr to Ch 300 pt 00 mtr
Mtc. and repair of road including pucca drain from the house of Sunil Debnath to Madhu Shil house at Gunjaria tilla, under jurisdiction of Central-VIII Sub division PWD R and B under AMC Ward no.37 for the year 2024-25 SH Patch Soling, Patch WBM, car
WBM- 3, Carpeting and Re-carpeting, repairs of potholes, seal coat etc.
Patch metalling, grouting, patch carpeting, sand seal coat etc.
Repair of potholes, Re-carpeting etc
SH- WBM Gr-3, Grouting, Re-carpeting, Tack Coat, Seal coat etc. during the year 2024-25.