Loading…
Loading…
2,867 results • Best match
ROAD WORK
ROAD WORK
Road work
Road work
ROAD WORK
ROAD WORK
ROAD WORK
ROAD WORK
Road work
ROAD WORK
ROAD WORK
ROAD WORK
ROAD WORK
ROAD WORK
ROAD WORK
Road work
SH- Grouting, widening and laying of BC, drainage work including road furniture.
Soling, WBM-II, WBM-III, carpeting, drain, CD, protection wall, traffic sign etc
earthwork,GSB,WMM,PMC,protection work,road side drain,CD etc.
Brick soled road to be converted to all weather road by carpeting road Harinath sardar para PMGSY road to Joy Krishna para L 0.25 km SH Construction of WBM 2 WBM 3 FBS,Carpeting, seal coat, side edging and earth filling etc. under Belbari RD block.
Mtc of road from Boim Cherra to Jhulan Tilla (Ch. 0.00 to 1.00 Km, Length 1.00 Km) and PMGSY road from Kayachanbari to Kathal bagan(Ch. 0.00 to 2.80 Km, Length 2.80 Km) under PWD (R and B) Jirania Sub Division during the year 2025-2026..
Periodical Renewal of PMGSY handed over road from AA road (Sadhu Para) to Sinai Kami (Link No 028) (L 2.900 Km) under SJTNY under PWD(R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM 3,Patch Grouting, re carpeting Seal coat..
PR of road from Prokashjoy to Mahanta Para (L039) PMGSY road taken over by PWD(RnB) under SJTNY of DNR Block during the year 2023-24 (L- 5.72 km)/SH- WBM-3,re-carpeting,side shoulder leveling, surface drains etc. portion from ch. 0.00 to 5.72 km.
Mtc of PMGSY road from Mandwi Tilla to Doctor Tilla (L 1.28km) under PWD(R and B) Jirania Sub Division during the year 2022 23 SH Patch soling, WBM III, Re carpeting, and allied works (Re carpeting ch 0.92 to 1.28 km) Group II(2nd Call).
FDR Maintenance of road from Nishan chandra para to Noabadi PMGSY road (Length 2.15 Km) under Mandwi PWD(R and B) Sub-Division during the year 2024-25SH Patch WBM-3..(Length to be repaired from Ch 0.00 Km to 0.85 Km 0.85 Km) (Group No-I)
Periodical mtc of road from JB para-Bhagirath para(P-II)(L022) PMGSY road taken over by PWD(RnB) under SJTNY of Dumburnagar block during the year 23-24(L-8.04 km)/SH- Patch WBM-2n3, re-carpeting, side shoulder levelling, surface drains, r-walls etc.
Repair of potholes, Re-carpeting etc.
WBM- 3, Carpeting, Recarpeting, Repairs of potholes, seal coat etc.
WBM-2 WBM-3, Carpeting, Seal coat, Brick Masonry drain,Road Marking and surface drain etc.
Churaibari to Dharmanagar TR0301UG, Jalabasa to Kanchanpur TR0308UG
Barendra Roja to Sarat KB TR-04-130
Chawmanu to Joy Ch. Para
Chawmanu to Sikaribaribari Road, Manikpur to Hazira, Chawmanu to Arunda, Balbuncherra to Alendra Para
Chandidebpara to Gayaram
Patch Metalling, Grouting, Re-Carpetting, protection work etc. under Kalyanpur RD Block during the year 2021-22.
Patch metaling, Bituminous Grouting, Carpeting, Seal Coating, including road side drain both kutcha and pucca etc.
Earth cutting, Flat and edge soling etc.
SH- Construction of RCC return wall for protection of road side erosion, WBM3, Patch Carpeting, seal coat etc. under PWD(RandB) Rupaichari Sub-Division during the year 2024-25.
Patch metalling, patch carpeting and seal coat etc complete.
Mtc of PWD road from K F Road to NH 208 via Ghosh Para during the year 2021 22 SH. Construction of road side pucca drain near proposed old age home
Mtc. of Kailashahar Town road SH Construction of road side pucca drain from Sri Amia Roy Choudhury house to Sri Jagadish Mahalanbish house in KMC Ward No 2 L 180.00 mtr.
Construction of road from Hrankhal bazar(Rangamura) to Taidu Ampi border area under Teliamura RD block (L - 3.02 km) under RIDF - XXIX of NABARD. (Job no. TP/COM/191/2023-24).