Loading…
Loading…
2,867 results • Best match
Periodical repair of road from Pecharthal market to Laljuri road to Pecharthal Railway station via ShantinagarAnganwadi centre from Ch 0 point 30km to 0 point 60km under PWD R and BPencharthal Sub Division during the year 2022 23 SH GSB WBM Carpeting
Periodical repair of road from Pecharthal Kanchanpur road to Pecharthal Kanchanpur road via Machmara bazar Total length 0 point 820 Km during the year 2022 23 SH Patch soling Patch metalling Carpeting Seal coat etc from Ch 0 Km to 0 point 820
Urgent Flood Damage Repair of road from TD Road to Khedacherra via Cremationghat from CH.0.00KM to CH.1.00KM Total Length 1.00KM under Damcherra Sub Division, PWD R and B during the year 2024 2025 SH Patch metalling, re carpeting, Seal coating, Surf
Maintenance of road under AMC ward No_3 during the year 2023_2024_SH_Periodical Repair of road starting from Nutannagar VIP road to Madhya Bhubanban School, Ch. 1.98 Km to Ch 3.30 Km(Length is 1.32Km)_ SH_ Grouting , PMC ,sand seal coat and other all
Periodical repair of road starts from GB to SDO chowmuhani (79 tilla) to By pass road via Vallokia tilla road to Jyotirmoy colony road via Memorial clud under AMC ward No_5 during the year 2020_21 _SH_Grouting, carpeting, seal coat, tack coat, brick
Periodical repair of road starts from 79 tilla Opposite to Electric office to GB to Indranagar road (near Indranagar Dairy) (Upto MSME) under AMC ward No. 7 during the year 2020_21 _ SH_ WBM, Grouting, carpeting, seal coat, tack coat, and other al
Periodical Repair of road from near P S to F C I Godown and NH 08 near Naydrone School to Ratiabari via Biplab Deb house during the year 2021 22 SH Patch metalling Grouting Carpeting Sand seal coat etc Length 810 mtr
Periodical repair of road from Agartala Simna road (Nanda Das para) to Bijoy Munda Para (Mantala colony) during the year 2022-23/ SH Repair of pot Holes, Patch WBM , Re carpeting,Tack Coat, Seal Coat, Mtc. of earthen shoulder etc.(L- 5.068 km).
Periodical Repair of road during the year 2021_2022_ Mtc. Of road starting from Radhanagar Bridge near Radhamadhav Unnyayan club via old 12 No AMC Ward office via Abhoynagar School upto Pragati Bridge from ch.0.00 mtr to Ch.530.00 mtr_SH_ WBM, Carpet
Periodical Repair of road from Tapas Kar godown to Rajnagar SB school L equals to 0 point 70Km JKm under the jurisdiction of Ganganagar Sub Division during the year 2023 24 SH Stripping Katcha Drain WBM Tack Coat Carpeting and Seal coat
Periodical repair of road starts from High court to Lichu bagan AMC centre road to Puran Lal Ghosh house at Lichubagan under AMC ward No 4 during the year 2020_21 _SH_ WBM,Grouting, carpeting, seal coat, tack coat, brickwork and other allied works (
Patch Metaling, Bituminous Grouting,Carpeting, Seal coating i/c road side drain
Earth cutting, G.S.B., W.M.M., Carpeting, including C.C. drain and other allied works
Laying
Patch metalling, bituminous grouting, carpeting, seal coating, road side drain
Metalling, Bituminous Penetration Macadam, Carpeting, seal coat etc.
CONSTRUCTION WORK
Construction
Grouting,metalling,carpeting,sand seal coat etc.
Earthwork GSB WBM II WBM III BM BC road side Pucca drain Protection Work etc. Length 4.00 Km under Scheme for Special Assistance to States for Capital Investment for 2024 25
SH Grouting, WBM, Laying of BC drainage work including road furniture.
Works
under PWD (RandB) Boxanagar Sub Division during the FY 2022-23 / SH- Patch Soling, Patch Metalling, Grouting, Re-carpeting, sand seal coat and other allied works.
Construction of road side pucca drain from Abhinash Biswas land to Dasu Sarkar house via Saraswati Sarkar house (W-5) at Tulakuna GP under Old Agartala RD Block (100 M)
Mtc. of road from Gandhigram- Bamutia road to Gandhigram-Narsingarh road via Sharma para, during the year 2025-26/ SH Construction of road side RCC and Brick work Drain etc.
Mtc of road from Chirakuti to Goldherpur H.S school/SH Construction of road side pucca drain from Shrilo Bhubaneswar Sadhuthakur Sanskritik Bikash Kendra to Kukinala during the year 2021-22
Maintenance of road during the year 2021_22_ Maintenance of road Side drain at different spots from Nandan Nagar School Chowmuhani to Debram Thakur para _SH_ Construction of road side drain.
Construction of road from NH 08 Peratia to Garjee-Tulamura Road near Kalaban Market via Holakhet High School, Joalikhamar GP and Simsima Bazar Length 9.00 km under Gomati District, Tripura
Construction of road from NH-08 to Labra Sardar Para to Harinama Para Swadesh Nagar GP under Jolaibari Assembly Constituency (Length- 2.50 Km)SH- GSB, WBM, Carpeting and allied works under Scheme for Special Assistance to States for Capital Investmen
Road work
Road work
Road work
ROAD WORK
Road work
ROAD WORK
Road work
Road work.
ROAD WORK
Road work
ROAD WORK
Road Work
ROAD WORK
ROAD WORK
ROAD WORK
ROAD WORK