Loading…
Loading…
2,867 results • Best match
Construction of road with paver Block at Beripara Madhuban Sonamura under MLA Development Fund During the year 2026 2027 SH laying of paver block and other allied works
Extension/Construction of Road side RCC pucca drain from PWD road to Boarder road via Jaju Miah house at Ashabari GP under Boxanagar RD Block (PWD SoR 2023).
Maintenance of Agartala Town Road During The Year 2024 25 SH Construction of Road side Pucca Drain adjacent to Ramkrishna Vivekananda Vidyamandir HS 2 School at Dhaleswar, Agartala
Construction of segregation centre shed and re-construction of road with cover drain near New Boys Club and Gym Shed near Pragati School under Ward No-18, AMC
PROVIDING EI FOR PROVIDING STREET LIGHT IN THE APPROACH ROAD IN FRONT OF DEIC AND ASSOCIATED PLACES IN DISTRICT HOSPITAL GOMATI TRIPURA
Construction
Bituminous grouting, Tack coat, Carpeting, re-carpeting, sand seal coating etc.
SH-Protection from erosion by placing of wire crates near Jampuijala P.S during the year 2021-22.
Construction
BM,PMC,seal coat etc.
Establishment of 50 bedded Drug-De-Addiction Centre at Unakoti District Hospital,Kls,Unakoti Dist Tripura SH Bld portion G4storied in internal water supply,sanitary installation,sewage drainage works,Boundary wall,retaining wall and Road Works
Mtc. of road from Paijabari road to Sundarban under Ambassa Municipal Council area (L-0.200 Km) /SH-Construction of road by brick soling, WBM-III, Carpeting, seal coat etc.
Construction of Road Site Retaning Wall at BRU Re-settlement site at Kali Lawgang ADC Village under Bokafa RD Block during the financial year 2023-24 (PWD-SOR-2020)
Construction of road along with its allied works starting from main road to main road to H.O Khokan Sarkar and Ranjit Shil at Shyamapally under ward No 47 AMC.
soling,carpeting and seal coat.
Repairs to road by WBM-3, Re-carpeting, Repairs of Potholes, etc. portion from Ch. 0.00 k.m to 2.430 k.m.
WBM- 3, Carpeting and Recarpeting, Repairs of potholes, seal coat etc.
Patch WBM-III, Carpetting, Recarpetting, Sealcoat,construction
Metalling, grouting, carpeting, sand seal coat, side berm lowering construction of katcha drain etc.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
WBM-2 WBM-3, Carpeting, Seal coat, 1 no. CD
Development of approach road, Raw Water Pump House, Electrical and Mechanical works with rising Main, Providing and laying Pipe Line etc./ Gr-II
SH- Patch metalling, grouting, carpeting, seal coating, clearing of land slide, restoration of damaged road formation, bamboo palasiding, constn. of unlined surface drain, placing of gunny bags etc. (2nd Call)
Periodical renewal of completed PMGSY road from Agunlal to Twidudepa(Ch 0.0 km to 5.96 km Length-5.96) km Link No L-057 under Ampi Sub-Division/SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, WBM-3, PMC, Sand seal coat etc.(Job-noTP/
Periodical renewal of PMGSY handed over road from Gurucharan para to Puniram sardar para (Link No 038) under SJTNY under PWD(R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM 3, Patch Grouting, Re carpeting, Seal coat, Road side..
Periodical renewal of PMGSY handed over road from Sona Kobra Para to Maheshmara (Link No 037) under SJTNY under PWD (R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM 3, Patch Grouting, Re carpeting, Seal coat, Road side drain...
Periodical renewal of PMGSY road from Ompi to Raban Para (Length-18.78 km) (Package No-TR02153) under Ompi RD Block during the year 2025-26/SH- Site clearance, Patch GSB, WBM-II and WBM-III, Grouting, Re-Carpeting, Sand seal coat, Pucca Drain, Protec
Periodical renewal of PMGSY handed over road from Nandan nagar to Senpara (L066) (L 2.50 km) under SJTNY under PWD(R and B) Sub Division, Khayerpur during the year 2023 24 SH patch grouting, WBM III, Re carpeting,sand seal coat, Road side pucca..
PR of roads from (1) Gariadafadar para TSR camp to PMGSY road Link No. L035 (L-1.00 Km), (2) Maiman Sing para to Maragang para (L027) (L-1.095 KM) under jurisdiction of Kalyanpur PWD(RandB) Sub-Division. / SH- Patch metaling, re-carpeting etc. durin
Mtc of rd over Laxmicherra embankment start frm Kinarchar PMGSY rd to Sukanta Colony L 0.35km and pucca drain at KLS-Murticherra rd start frm house of Lt Dr.S Das during the yr 24 25.SH soling,metalling, grouting,carpeting,sand seal coat,pucca drain,
Periodical renewal of PMGSY handed over road from Old Mandwi Patni road to Khengrai (Link no L022) (L 6.600 km) under SJTNY under PWD(R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM3, patch grouting, re carpetting, seal coat..
Up-gradation of road from (1) MRI.09-Jamjuri Gangacherra Rd to NH-08via Baskhet JB Schl. (2) MRI-01 Dhuptli Tulamura Rd to Gangacherra Bazar/SH- Utility Shiftng of DI/CI/PVC pipelne along with PMGSY road within DWS SD KBN durng 2025-26.
Periodical renewal of PMGSY road from Ompi to Raban Para (length-5.50 km) (Package No TR02180U) under Ompi RD Block during the year 2025-26/ SH- Site clearance, Patch WBM-II and WBM-III, Grouting, Re-Carpeting, Sand seal coat, Protection work etc. (J
Renewal of PMGSY handed over road from NEC road to Madhya Chaintail during the yr 2025 26 L1.995 km Pckage No. TR03183, Link No. L043 SH GSB, WBM II, WBM III, premix carpet, pucca drain, river protect work through wire crates, block pitching, etc.
Urgent FDR of road from JB para Bhagirath para-II PMGSY road to Girachandra para(L-1.00km) under Gandacherra Sub-Division PWD(RandB) during the year 2018-19/SH- WBM-3,Carpeting, seal coating etc.(Portion from ch. 0.00 km to 1.00km). (3rd Call)
Periodical maintenance of PMGSY road from Babul Chowmuhani to 19 Card Rail way Bridge Link No L-066 under Amtali PWD RnB Sub-Division during the year 2023-24/ SH Patch WBM Patch repairing Carpeting Premix seal coat CC Drain and other necessary works
Flood Damage and restroration of PMGSY handed over road from Sonamura-Boxanagar Road to tilla no 7 Link No 048 L 0.631 km under PWD RandB Boxanagar Sub Division during the FY 2024 25 SH WBM Carpeting Seal coat pucca drain and other allied works
Periodical Renewal of PMGSY handed over road from Borakha ADC Colony to Abhicharan (Link No 043) (L 3.75 Km) under SJTNY under PWD(R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM 3,Patch Grouting, re carpeting Seal coat and..
Mtc. of PMGSY road from Harina Ailmara road to Sonai Jalefa road (T02) (L-10.29km) SH. Construction of RCC retaining wall for protection of road side erosion at Ch. 7.50 km under PWD (R and B) Rupaichari Sub-Division during the year 2024-25
Periodical renewal of PMGSY Handed Over road from Borakha ADC Colony to Salgaria (Link No 042) under SJTNY under PWD(R and B) Mandwi Sub Division during the year 2023 24 SH Patch WBM 3,Patch Grouting, re carpeting Seal coat and other allied...
Periodical renewal of completed PMGSY road from KBK-JTB road to Sija Mog Para L-033 (Length-4.40 km) (Package No. TR02250-13) during the year 2025-26/ SH- GSB, WBM, Re-Carpeting, Sand seal coating, CC and Surface Drains and road protection works etc.
Periodical renewal of completed PMGSY road from AT road to Nagarai Link No L-052 under Ompi Sub-DivisionSH-Dulongbari to Mandwi road L-034Length-3.350 km) SH- Surface Drain ,Road side pucca Drains,Landslipe Clearance, WBM-3, PMC,Sand seal coat etc du
Urgent FDR of road from JB para Bhagirath para-II PMGSY road to Bhagirath para(L-5.50km) under Gandacherra Sub-Division,PWD(RandB) during the year 2018-19/SH-WBM-2, WBM-3,Seal coating etc.(Portion from ch. 0.00km to 5.50km).(6th Call)
Periodical renewal of PMGSY handed over road from Old Mandwi Patni road to Nalbagla (Link no 023) (L 6.646 km) under SJTNY under PWD(R and B) Mandwi Sub division during the year 2023 24 SH Patch WBM 3, patch grouting, re carpetting, Seal coat..
SH. Missing Soling, WBM-III, carpeting and unlined surface drain etc. during the year 2022-23. (Portion From 0.00km to 0.800 km)
SH- Patch soling, metalling, carpeting, side drain in/c 2 nos CD portion from Noagaon up to Bamutia-Fatikcherra road (Length-2.15 Km) Under RIDF-XXV (Job No.TP/COM/13/2019-20)
GSB, WBM-III, Paver block, etc
Periodical repair of road from Agartala Simna Road(Noagoan) to Tilla Basti under Tripura Nirman Subarna Jayanti Yojana (L-027) during the year 2023-24/SH Repair of pot Holes, Patch WBM , Re-Carpeting,Tack Coat, Seal Coat, Mtc. of earthen shoulder e