Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
Formation cutting, C/O Passing places, Breast wall, Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets , Crash Barrier, Road sign Board, Bio Engineering works, Cell Filled Cement concrete Pavement and Tarring work etc.
SH Widening of road, Extension of curve, Cross Drainage work, Providing and laying GSB, WMM, 50mm thick Dense Graded Bitumen Macadam and 30 mm thick Bitumen concrete, PF Thire metall crash barrier and road furniture
SH ROFD, R/walls, B/walls, Gabion walls, M/T, Cross Drainage work, Drain, Parapets, Crash Barrier, Citizen information Board, Logo Board, KM stones in Km. 0/00 to 4/850 Package No.HP-06-206.
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
C/O Passing places, Missing CD, Side Drain, Parapets, Crash Barrier, C.C. Pavement and Tarring work including five year maintenance after completion of work) under PMGSY Batch-II 2018-19 Package No. HP-04-386
Periodical Renewal coat with 25 mm thick bituminous concrete with paver thermoplastic line zebra crossing on NH-70 to village Dukki Km 4000 to 6000 HP1202 VR 0045 under PMGSY for the year 202425
C.O Karchham Sangla Chhitkul road Km. 0.0 to 41.500 under SCA to TSP SH. Providing and fixing W Metal Beam Crash Barriers Railing at Km. 27.0 to 27.015 28.210 to 28.300 29.090 to 29.150 34.225 to 34.300 and 34.700 to 34.770 Phase.VI
ROFD, C/O wire crates/gabion walls, R/walls, M/T, cement concrete pavement, C/O road side parapets, providing crash barriers, C/O V-shape and U- shape drains, X-drainage work including 5 year routine maintenance after completion of work
C /O ROFD, R/walls, B/walls Gabion walls, Metalling and Tarring, Cross Drainage works, Drain, Parapets, Crash Barriers and Citizen information Board, Logo Board, KM stone and 200 Metre stones in Km 0/0 to 6/375 and five years routine maintena
Thermoplastic Paint line of Giri Ganga link Road km 0/00 to 6/00 SH Thermoplastic Paint
STRENGTHENING INCLUDING IMPROVEMENT WITH ROAD SAFETY WORK ON NH503A IN KM NEW CHAINAGE 42 000 TO 70 000 OLD CHAINAGE KM 39 700 TO 67 250 IN THE STATE OF HP
Periodical Renewal coat with 25 mm thick bituminous concrete with paver, thermoplastic line zebra crossing on T04 to upper Behar Jaswan Km. 2000 to 2930 HP1202 VR 0032 under PMGSY for the year 202425
Periodical renewal coat 30mm thick bituminous concrete with paver thermoplastic center line and zebra crossing on link road Pangian to Repoh Muchhlian Deom km 000 to 3390 HP1202VR0073 under PMGSY for the year 202324
Periodical renewal coat 30mm thick bituminous concrete with paver thermoplastic center line Zebra crossing on link road from Bharia to Hamboli km 2200 t0 4000 HP1202VR0037 financial incentive under PMGSY for the year 202324
Periodical maintenance of Shilla to Tatiyana road under Annual Maintenance plan for the year 2021-22 for rural road (Non PMGSY)(SH- Repair of pot holes and providing 10cm wide road marking and 30mm thick bituminous concrete in km. 0/0 to 3/0 and
PROVIDING LAYING AND COMPACTION OF 50 MM THICK DBM AND 40 MM THICK BC APPLYING PRIME TACK COAT AND ROAD MARKING ALL AS PER PARTICULAR OR MORTH SPECIFICATION FOR SURFACING WORKS BETWEEN KM 11pt500 TO KM 17pt500 ON MAR ROAD OF PROJECT DEEPAK IN HP
Periodical Maintenance of Drabil to Jhakando road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (SH-Repair of pot holes and providing 10cm wide road marking and 30mm thick bituminous concrete in km 6/0 to 7/0
PROVIDING LAYING AND COMPACTION OF 40 MM THICK BC INCLUDING CLEANING OF ROAD SURFACE AND APPLYING TACK COAT AND ROAD MARKING ALL AS PER PS MORTH SPEC AT VARIOUS LOCATION ON M S RD UNDER 70 RCC 38 BRTF RD SECTOR OF PROJECT DEEPAK
Financial Incentive for Periodical Maintenance for the year 2023-24 from Bhajond to Gatlog Road Km.0/00 to 10/500 under PMGSY Package No. HP-10-163 (SH Repair of pot holes and providing 10cm wide road marking and 30 mm thick bituminous concrete
Periodical Maintenance of Millah to Gundah road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (sh- Repair of pot holes and providing 10cm wide road marking and 30m thick bituminous concrete in km 0/0 to 2/0
Periodic maintenance of Nore to Neethar Km. 0/00 to 44/765. (SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km. 32/00 to 36/00 against revalidati
Periodical Maintenance of Koffota Kando Cheyog road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (sh- Repair of pot holes and providing 10cm wide road marking and 30m thick bituminous concrete in km 6/0 to 7/0
Providing and fixing crash barrier at RD 0/350 to 0/450 and Construction of Breast wall at RD 2/765 to 2/775 and R/wall at RD 2/645 to 2/660) Deposit work
SH FC Rwall in PCC R.R masonry in wire crate parapets unlined drain essential soling RCC hume pipe culvert crash barrier road furniture solid causeway and dumping site etc at km 0.0 to 3.0 slice I.
Metalling and Tarring, ROFD for improvement of narrow curves, missing R/wall, B/wall, Missing CD works, V-shape drain, parapets, crash barrier, logo boards and five year routine maintenance etc. Package No. HP-08-520.
Metalling and Tarring, ROFD for improvement of narrow curves, missing R/wall, B/wall, Missing CD works, V-shape drain, parapets, crash barrier, logo boards and five year routine maintenance etc. Package No. HP-08-540.
SH Improvement of formation deficiencies, Retaining structure ,C/O Cross-drainage works, Road side drain, parapets, Road furniture, Paver Block, Essential edges, ,6.00 mtr span slab culverts, Box Culverts , W Metal crash barrier and Providing Met
P/L hot thermoplastic centre line
A/R and M/O on NH503 Extn Km. 0.0 to 44.700 (SH Strengthening and improvement of road safety Audits and Rectification of blackspot at Rotary Chowk Rakkar Colony and Bhatoli Chowk
Construction of link road from Bhella to Klatha km 0/00 to 3/400 ( SH- Removal of Formation Deficiency, C/o Retaining structure, P/L cross drainage works, Metalling Tarring, Side drainC/o essential parapets and P/L Road signage etc. in km 0/0to3/400
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/00 to 1/00 and 1/00 to 2/00) (year 2024-25 Village road
Providing and Laying Tack coat, 25 mm thick Bituminous Concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 20/00 to 21/00,21/00 to 22/00 and 22/00 to 23/00) (year 2025-2
P/L built-up-spray grout, Tack coat, Bituminous concrete 25mm thick and thermoplastic strip const.of earthen shoulders, unlined surface drains, 600mm dia pipe, road marking in Km 0/0 to 11/510 and five year routine maintenance in Km 0/0 to 11/510
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 6/00 to 7/00 and 7/00 to 8/0) (year 2024-25 Village road
P/L 30 mm thick Bituminous Concrete, Thermoplastic Road marking and C/o Essential PCC Road Side Drain on Nahan Dadahu Haripurdhar Kupvi Road in Km 24/0 to 26/0 and Banethi Bagthan Rajgarh Chandol Road in Km 0/0 to 4/0
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/00 to 2/00 and 2/00 to 2/770) (year 2024-25 Village road
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/00 to 1/00 and 1/00 to 2/00) (year 2024-25 Village road
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 12/00 to 13/00 and 14/00 to 15/00) (year 2024-25 Village ro
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/00 to 1/00 and 1/00 to 2/0) (year 2024-25 Village road
A/R and M/O on various roads under HP PWD Division Tanda at Nagrota Bagwan in Distt Kangra (HP) (SH Providing hot applied thermoplastic paint both side edge line and Zebra crossing line etc)
Periodical renewal coat with 30mm Bituminous concrete with paver on link road Kalu Di Bar to Godri Sidh km 2000 to 2540 HP1202VR0085 including thermoplastic paint edge line Vshape drain at essential RDs under PMGSY
A.M.P. for the year 2026-27 on Chanaun to Kot Road DRRP No HP0805VR0108 Km 2/500 to 5/00, (SH Providing and laying 30 mm thick bituminous concrete and thermoplastic paint only curve portion)
A.M.P. for the year 2026-27 on Chanaun to Kot Road DRRP No HP0805VR0108 Km 0/00 to 2/500, (SH Providing and laying 30 mm thick bituminous concrete and thermoplastic paint only curve portion)
Improvement,Passing places, R/walls,C.D. work, GSB, WBM-II, WBM-III, Tarring work, Side Drain, Metal crash Barrier, CC Pavement, Interlocking paver Block and parapets including routine maintenance for five years after completion of construction work
Formation cutting, Construction of passing places, Missing CD, side drain, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY-II (Batch-I for, 2019-2020)Package No HP-02-06
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM,Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-705
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-701