Loading…
Loading…
2,215 results • Best match
DETAILED PROJECT REPORT FOR PROVIDING OUTFALL SEWER AND SEWERAGE NETWORK, SEWAGE TREATMENT PLANT FOR HARI NAGAR, POLICE LINE, PIPLI, VASHISHT COLONY, MOHAN NAGAR, KAILASH NAGAR, SUNDERPUR AND VILLAGE KHERI MARKANDA ETC. IN THANESAR TOWN DISTT. KURUKS
R/W Pumping Station , R/W Rising Main lines, Exist. 1st. W/W Dhanana, C/W Rising main lines, Internal distribution and Acquisition of Land. DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT
Custom Bid for Services - RPRC256341 Rate Contract for Operation of OWS Sump, CRWS sump, Oil catchers, CRWS Pond, CRWTP and Storm water pond in P25 Block Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Operation and maintenance of 50KLD capacity mobile waste/sewage treatment unit at Baba Bhishm Mandir in Manesar village, Ward no-12 under MC, Manesar
Construction of Faecal Sludge TreatmentPlant in existing campus of (15 x2) 30.00 MLD
For works relating to water supply, sewerage, storms, sewage treatment plant, common effluent treatment plant, reuse of treated waste water etc in towns namely Narnaul, Mohindergarh, Ateli, Kanina a Nangal Chaudharyin Haryana state complete in all re
detailed project report and bid document for the work of Construction of 5 MLD Sewage Treatment Plant On SBR technology with tertiary Treatment complete in all respect for Sector 32 33 and 34 Urban Estate Ambala Cantt
Construction of Fecal Sludge Treatment Plant in existing campus of 7 MLD Sewerage Treatment Plant
DNIT for Construction of 60 MLD Sewage Treatment Plant at Devi Nagar Ambala City on SBR Technology consisting of Main Pumping Station Inlet chamber Fine screen channel Grit chambers SBR basins Fibre Disc Filters Chlorine Contact Tank Chlo
ETP AND STP OPERATION
ETP AND STP OPERATION
Construction of Faecal sludge Treatment plant in existing campus of 3.00 MLD sewerage treatment plant
Construction of Faecal Sludge Treatment Plant in existing campus of 1.50 MLD Sewerage Treatment Plant.
Construction of Faecal sludge treatment plan in existing campus of 4.5 MLD sewerage treatment plant.
operation and Maintenance for 30 KLD STP at Bio Diversity Park Zone III Gurugram
CONSTRUCTION OF SEWAGE TREATMENT PLANT OF 0.5 MLD CAPACITY (SBR TECHNOLOGY) AND USING THE TREATED WASTE WATER (AS PER NORMS OF CPCB) FOR CREATING WATER BODY INCLUDING OPERATION AND MAINTENANCE FOR 5 YEARS WITH DEFECT LIABILITY PERIOD OF TWO YEAR etc.
DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT MUNAK DPR FOR AUGMENTATION OF W/S SCHEME MUNAK BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE MUNAK DISTRICT KARNAL UNDER SWARAN JAYANTI MAH
Operation and Maintenance for 12 Months during Defect Liability Period after trial run of 3 Months and 4 years thereafter in Place of safety for Boys at Madhuban Distt., Karnal
Operation of 30 MLD STP in Sector-19, Panipat Operation of STP based on SBR tech. with av. discharge 8-10 MLD STP
Naraingarh Town, construction of Faecal Sludge Treatment Plant in existing campus of 3 MLD seweage treatment plant Naraingarh town Distt. Ambala. Naraingarh Town, construction of Faecal Sludge Treatment Plant in existing campus of 3 MLD seweage trea
AMC OF 50 KLD STP
Internal clearance of STP Channel
STP 0.75 HP 125 INCH, STP 1.5 HP 125 INCH, STP 1.5 HP 150 INCH Bidder Turnover (Last 3 Years) 759 Lakh (s) Experience Criteria 3 Year (s)
Muana STP Design Construction Erection Testing Commissioning of Main Pumping Station of 3 MLD STP MUANA
Up gradation and commissioning after conversion of existing 4.5 MLD capacity sewage treatment based on Moving Bag Biological Reactor Technology (Attached Growth Process) to combined activated sludge process in conjunction with MBBR BIO film etc.
Construction of Faecal Sludge Treatment Plant in existing campus of6.50 MLD STP, Dulana Road, Mohindergarh,Construction of ScreeningChamber.,Construction of Decanting Tank of with sludge cutter pump, Electrical and Mechanical Installation for the
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF FLOWMETER AT KAROI ROAD STP AND RATHDHANA STP IN MC SONIPAT
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF FLOWMETER AT KAKROI ROAD STP AND RATHDHANA STP IN MC SONIPAT
Construction of 5 MLD STP at Narnaul Prov and fixing of NP3 RCC pipe near STP Narnaul
STP work
Tauru Town STP-Construction of Effluent Channel
Construction of Faecal Sludge Treatment plant in existing campus of 14 MLD Sewerage Treatment Plant Rohtak Town
TELECAB Cat-6 STP for CCTV
Reconstruction of bridges on STP Channel
ETENDER OF STP AT KCGMC KARNAL
Poviding treated effluent rising main lines
Poviding of sewerage scheme estimate
Estimate for upgradation of STP Involving installation of Solar Power Plant at STP 4.50 MLD Pataudi under Jal Hi Amrit initiative of Amrut 2.0
Construction of Faecal Sludge Treatment Plant in existing campus of 3.00 MLD Sewerage Treatment Plant Bawal, Distt. Rewar
Construction of 5 MLD STP at Narnaul Repairing of damaged Barhkhoda Minor near STP Narnaul complete in all respect
Mtc. Sewerage Scheme Rohtak Town, Treatment of effluent of 40 MLD STP upto NGT presccribed parameter of 40 MLD STP.
Annual Mtc of 5 MLD STP Dharuhera