Loading…
Loading…
4,194 results • Best match
REPAIR, MAINTENANCE, CALIBRATION AND REPLACEMENT OF UNSERVICEABLE SPARES OF 11 KV VCB, PANELS, RELAYS, BUSBARS ETC. AND OTHER ALLIED WORKS AT CDS-II AND NEAR BY SUBSTATIONS AND OTHER MISC WORKS AT NAVAL DOCKYARD VISAKHAPATNAM
AME for IEI and EEI street lights, yard lights, LTOH lines, Transformer substations and purchase of materials to SKVS temple, Srivarimettu, Kalyani pumping scheme in ESD-SBH, Tirupati for the year 2023-24(Part-B)
Carrying out operation and maintenance including watch and ward, housekeeping, gardening at all 132KV Substations and other Sub divisions in O and M Circle Anantapuramu (Work-II General Category) for a period of 36 months.
Engaging Electricians for Operation and Maintenance of Secretariat Buildings 1 to 6 and Electrical Substations:1 and 2 at AP Secretariat IGC Velagapudi for 24 Months for the financial year 2026 27 and 2027 28
Carrying out operation and maintenance including watch and ward, housekeeping, gardening at all 132KV Substations and other Sub divisions in O and M Circle Anantapuramu (Work-II General Category) for a period of 36 months.
APSPCL- Supply of mandatory spares for 220/33 KV pooling substations at Kurnool Ultra Mega Solar Park (1000 MW), Ananthapuramu Ultra Mega Solar Park (1500 MW) & Ananthapuramu Ultra Mega Solar Park -II (500 MW), A.P.
Monsoon Action Plan-2026] Removal of Wet Silt in Outfall Drain at Amaravathi Road from Vishal Mart to Inner Ring Road( Electrical Sub Station) (along East Side) and Seethaiah Donka from JKC College Main Road to Neelampati Sri Lakshami Ammavari Temple in Div. No. 46.
ANNUAL MAINTENANCE CONTRACT FOR MANNING AND OPERATION ALONGWITH MAINTENANCE OF 145KV GAS INSULATED SWITCH GEAR AND 132KV MRSS SUBSTATION
MANNING AND OPERATION, OF 11KV SUBSTATION, DAY TO DAY COMPLAINTS AND REPAIR/REPLACEMENT OF INTERNAL WIRING, FITTING AND FIXTURES AT AOB RAMBILLI
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HT SUBSTATION, LT SWITCH GEARS, CABLING, LIGHTING, EARTHING AND ALLIED WORKS AT VIJAYAWADA TERMINAL, ANDHRA PRADESH
Custom Bid for Services - PROVISION OF MURAL ART WORK AT SMRITI STHAL AT MO(V) Similar Category Operation And Maintenance Of Substation
Repair of 01 no. 1600KVA, 11KV/433V, 3 Phase, 50Hz transformer located at Substation-03 of Outfit jetty as per technical specifications
Repair/Replacement of burnt out Vaccum Interrupter, HVX-LR insulating enclosure and alongwith misc items at TP area substation at INS Kalinga
Supply, Installation, Testing & Commissioning of 2 Nos. of 500 KVA Distribution Transformer substation to Vakulamatha Rest House at Tirumala (Part-B Portion)
Providing 110mm dia HDPE Pipe line from D.No. 25-6-7 to D5 Electrical Substation beside arts College road in 5th division.
Providing Air Cooling System to the Indoor Substation located in stilt floor of the new HoD office Building at MG Road, Vijayawada
: Construction of check dam across Chinnaperigalla gundu near Substation of Nagulakuntapalli (V) H/o Surabhi (V) in Chakrayapeta (M) of YSR District.
Retrieving of existing loop UG cables and laying of new cables from SLP substation to SRV building in SLP complex, SDSC SHAR.
Construction of CC Culverts at RCM Church and Power Substation in Yanamalakuduru-1 Sachivalayam of YSR Tadigadapa Municipality(1552-172/2023-E1).
Construction of CC Culverts at RCM Church and Power Substation in Yanamalakuduru-1 Sachivalayam of YSR Tadigadapa Municipality(1552-172/2023-E1)
Construction of 450mm new CC Drain at Substation back side 6-5-982 in 52 Secretarait 35th Division under Anantapuramu Municipal Corporation
AME for Service Contract of Transformer Substation pertaining in Dy.EE-West section, Tirupati for Three(3) years 2024-25 to 2026-27
Enhancement of Power Transformer capacity from (31.5MVA and 2 nos50MVA) to 3 nos50MVA at 220/132/33KV Substation Kondapalli in Krishna District.
Annual Maintenance of 11KV Substation and other electrical works in KGH, Visakhapatnam for the year of 2018-19 from (01.04.2018 to 30.06.2018).
Providing CC Road from D No 15-9-69 to Substation road opposite to RR Township in 20th ward of Kovvur Municipality
Name of the Package:-APAM//NLR/Kovur/12, Total Estimate Cost Rs.379.00 Lakhs 1) Urgent repairs to the road from Pothireddypalem Branch road in Kovur Mandal of SPSR Nellore District Estimate Cost. 45.00 Lakhs 2) Urgent repairs to the road from ... Damaramadugu Sub -station ... Sub- station in ...
Name of the Package:-APAM//NLR/Kovur/12, Total Estimate Cost Rs.379.00 Lakhs 1) Urgent repairs to the road from Pothireddypalem Branch road in Kovur Mandal of SPSR Nellore District Estimate Cost. 45.00 Lakhs 2) Urgent repairs to the road from ... Damaramadugu Sub -station ... Sub- station in ...
B.R.R. Vamsadhara Project Phase-II of Stage-II - Hiramandalam Lift Irrigation Scheme- Detailed Investigation, Designs and construction of Lift Irrigation Scheme for drawl and lifting of water from Gotta Barrage Right Main Canal at Km 2.400 near ... Electrical sub station , ...
Construction of precast compound wall for 132KV SS TBvara, quarters-I site attached to the switchyard area and quarters-II area other side of the main road near 132KV SS TBVara premises in Vizianagaram Dt
Providing Painting to the Control Room Renovation of Toilet Water Supply Arrangements to Earth Pits and Laying of switchyard Cable duct Cover Slabs at Existing 132 33 KV SS Thumkunta in Sri Sathya Sai District
Supply, erection,testing and commissioning of balance works of 220kV DC line from 220kV Gunadala Substation to 220kV Nunna Substation with Monopoles and on Multi-circuit towers in the same corridor of existing old SC line and dismantling of existing 220kV Single Circuit line in Krishna District on turnkey basis.
Construction of various buildings under phase-I for Central University campus Ananthapuramu, Andhra Pradesh. Subwork/Packages: SH: Construction of Central Administrative Building G & 2 floors, Academic Building Block -I & II G & 2 Floors, Boys Hostel ... II, Sub Station I, ... Pumps Sub Stations etc.
Annual Maintenance Contract for Operation and Maintenance of 11KV substations and distribution system and other miscellaneous electrical works as and when required basis for a period of 01 years at BARC Main site, Atchutapuram Visakhapatnam, A.P.
REPAIR MAINTENANCE OF LT ELECTRICAL PANEL BOARDS AND ALL ACCESSORIES INCLUDING REPLACEMENT OF UNSV ITEMS GALLERY EARTHINGS EARTHING STRIPS AND ALLIED WORKS AT NEW DOCKYARD JETTY SUBSTATIONS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAP
REPAIR MAINTENANCE OF LT ELECTRICAL PANEL BOARDS AND ALL ACCESSORIES INCLUDING REPLACEMENT OF UNSV ITEMS GALLERY EARTHINGS EARTHING STRIPS AND ALLIED WORKS AT OLD DOCKYARD JETTY SUBSTATIONS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAP
Supply and Erection of 12Nos. new 33 by 11KV Outdoor Substations with SCADA automation along with connected 33KV lines on 100 percent Turnkey basis in Srikakulam and Eluru Circles of APEPDCL under Navaratnalu PedalandarikiIllu Flagship Programme
Design, Manufacturing, Testing and Supply of 18 Nos. 80 MVA 220/33kV PTRs in 2 LoTs (Lot-1-: 9 Nos. and Lot-2-9 Nos.) for utilization in various substations of APTRANSCO under BESS Phase-II
Carrying out operation and maintenance including watch & ward, housekeeping & gardening, MRT Assistance at various 132KV EHT substations , MRT ,Hotlines and lines in O&M circle Vizianagaram for a period of 36 months(work-II-General Category)
Supply and Erection of 12Nos. new 33 by 11KV Outdoor Substations with SCADA automation along with connected 33KV lines on 100 percent Turnkey basis in Srikakulam and Eluru Circles of APEPDCL under Navaratnalu PedalandarikiIllu Flagship Programme.
Supply, Erection, Testing and Commissioning of various ratings of 48V VRLA Battery sets and 25Sq.mm Battery cable under PSD funding phase II for renovation and upgradation of Protection and control system of EHT substations in APTRANSCO
Engaging of 138 Nos. Qualified personnel as Shift Operators for Carrying out Manning of 37 Nos. 33/11 KV Sub Stations round the clock on Work Contract basis as per scope of work in Operation division, AMALAPURAM of Operation Circle, Rajamahendravaram for a period of 10 months i.e., 01-06-2020 to 31-03-2021
Engaging of 102 Nos. Qualified personnel as Shift Operators for Carrying out Manning of 29 Nos. 33/11 KV Sub Stations round the clock on Work Contract basis as per scope of work in Operation division, RAMACHANDRAPURAM of Operation Circle, Rajamahendravaram for a period of 10 months i.e., 01-06-2020 to 31-03-2021
Engaging of 92 Nos. Qualified personnel as Shift Operators for Carrying out Manning of 26 Nos. 33/11 KV Sub Stations round the clock on Work Contract basis as per scope of work in Operation division, JAGGAMPETA of Operation Circle, Rajamahendravaram for a period of 10 months i.e., 01-06-2020 to 31-03-2021
Carrying out Operation and Maintenance of 5 Nos.33/11 KV Sub Stations at 1.GanguduPalle,2.Agarala,3.Panapakam,4.Rangampeta ,5.Bheemavaram SS round the clock on Work Contract Basis as per scope of work in Rural Chandragiri Section in (O) Sub-Division Chandragiri of (R) Division Tirupati in (O) Circle Tirupati
Carrying out Operation and Maintenance of 5 Nos.33/11 KV Sub Stations at 1)Mittakandriga 2.Netteri 3.Iruguvai 4.Elakatur 5.Oroorpeta SS round the clock on Work Contract Basis as per scope of work in (O) Nindra Section in (O) Sub-Division Nagari of (O ) Division Puttur in (O) Circle Tirupati
Carrying out Operation and Maintenance of 5 Nos.33/11 KV Sub Stations at 1) Gudibanda 2.Enugundapallem 3.Errakotta Palle 4.Kadirecheruvu 5.Gangapuram SS round the clock on Work Contract Basis as per scope of work in (O) Kalakada Section in (O) Sub-Division Kalikiri of (O)Division Piler in (O) Circle Tirupati
Carrying out Operation and Maintenance of 5 Nos.33/11 KV Sub Stations at 1) G.B.Palli 2.Kuraparthy 3.Chinthaparthy 4.Manchuru 5.Nagirimadugu SS round the clock on Work Contract Basis as per scope of work in (O) Vayalpad Section in (O) Sub-Division Kalikiri of (O)Division Piler in (O) Circle Tirupati
Engaging of 141 Nos. Qualified personnel as Shift Operators for Carrying out Manning of 37 Nos. 33/11 KV Sub Stations round the clock on Work Contract basis as per scope of work in Operation division, KAKINADA of Operation Circle, Rajamahendravaram for a period of 10 months i.e., 01-06-2020 to 31-03-2021
Engaging of 31 Nos Qualified personnel as Shift Operators for Carrying out Manning of 8 Nos 33/11 KV Sub Stations round the clock on Work Contract basis as per scope of work in Operation division, RAMPACHODAVARAM of Operation Circle Rajamahendravaram for a period of 10 months from 01-06-2020 to 31-09-2021
Carrying out Operation and Maintenance of 5 Nos.33/11 KV Sub Stations at 1.Kotagadda 2.Rampalle 3.Sugalimitta 4.Vanamaladinne 5.Yetavakili SS round the clock on Work Contract Basis as per scope of work in ( R )Punganu Section in (O) Sub-Division Punganur of (O) Division Madanapalle in (O) Circle Tirupati