Loading…
Loading…
2,434 results • Best match
Name of Work AR and MO building in BMPK division during 2022 23 SH Misc repair and maintenance work in GI pipe line and overflow system in various complexes under Aliganj Service Centre
Repair of flooring, damaged SCI pipe line and repair of wood work, toilet bathroom fittings and finishing work at vacant flat No. C-24 and C-37 Reids Line Colony, University of Delhi.
Online permission for road cutting at permission for laying of IGL gas pipe line at sunlight Colony-2 in Ward No. 143, CNZ SH Restoration of cut by pdg. CC 1-1.5-3
Restoration of road cut by JIO DIGITAL and IGL for laying of cables/pipe line on Anuvrat Marg under Sub Division-III of Division South Road-II, PWD New Delhi during 2022-23.
Truss painting work at Badli depot including of all MS structure of Workshop and IBLs, IHCS, PWL, Watch towers, Workshop, IBLs and HICS roof access platform, Fire pipe line and other steel structures.
Restoraton of road cut by IGL in C-Block 45-E Restoration of road cutting for Laying Natural Gas Pipe line in C-Block Bhajanpura in Ward No. 45-E, Shah (N) Zone
PROVN OF 02 NOS BOREWELL ALONGWITH ALLIED PIPE LINE WORKS AND 50000 GLN SUMP FOR SFC IN THE AREA OF AGE (U) WS NO II UNDER GE (U) WATER SUPPLY DELHI CANTT-10
ARMO of all E and M Services at Indira Gandhi Hospital, Sector-9, Dwarka, New Delhi (SH Electrostatic type Scale Preventer in the Heat Exchanger Pipe Line of DG Set of 2000 KVA)
Providing and laying additional M.S. Pipe line from Sanjay Enclave Jahangirpuri to Supplementary Najafgarh drain near Captain Vikram Batra Chowk under Sub Division NR-12, North Roads Division, PWD, Delhi during 2023-24
Restoration of cut made by IGL to lay Natural Gas Pipe line in vicinity of Bhajanpura Block-C part 2 in Ward 232 Yamuna Vihar ID No. 202310211548248 Division M-II Shan.(N).
Construction of washable aprons, OH tank , UG tank, RO, pump room , water supply pipe line Automatic Waste Water Recycle Plant (AWWRP) and other allied works in c/w Coaching Terminal MG area Shakurbasti
Coach watering arrangements by laying new pipe line ,construction of Overhead RCC Tank of 225000 Lts capacity ,installation of new tube well, drainage arrangements and other allied works at KKDE under ADEN/KUN.
Maintenance of various Electrical and Mechanical Services at Thyagraj Sports Complex, Thyagraj Nagar, New Delhi. (SH- Providing paint on various poles and pipelines of fire, HVAC etc.).
Rate Contract for the Work of Laying, Replacement, Repair and Maintenance of Pipelines for Ahmedabad Asset, Tripura Asset And CBM Asset for a Period of Three Years
Proposal for carrying out EIA and RA study for Bijwasan-Delhi Airport ATF Pipeline
ALL RISK COMPREHENSIVE PROJECT INSURANCE FOR UPCOMING PIPELINE PROJECTS IN INDIAN OIL CORPORATION LIMITED
Comprehensive Project Insurance for Oxo Alcoholic project at Dumad and Kandla- Gorakhpur LPG Pipeline
Water proofing of various facilities blocks, Providing Laying peripheral G.I. pipe line, Providing and Fixing signage board, painting and other Misc. work at Rashtriya Swabhiman Khel Parisar, Pitampura.
Providing water pipeline from Booster pump of Delhi Jal Board Pankha road flyover to Old Nangal Village out of MLA LAD Fund at Delhi Cantt. Assembly (AC-38)
Providing/Laying water pipeline in Left out portion of A-1 and A-2 Block Utsav Vihar an unauthorize colony in Mundka AC-08 under AEE(M)8.
Dredging/Desilting of Khusak Nallah from DJB water pipeline to DJB Manhole near Steel Truss Bridge(of cables) behind Silver Oak Park in Ward no. 145, Central Zone
ARMO of International Boys Hostel of 500 capacity and food court including water supply, sanitary installation, internal electrical installation, Fire Fighting System, Fire alarm System, sub Station, Lift , DG Sets, CCTV, RO Plants, Access Control ... Defective Rising Main etc.
R/R charges for digging of IGL gas pipe line at Model Basti KBZ in W.No.92N. SH- R/R cut by pdg. C.C. in Model Basti in W.No.92N/KBZ. 21/66/66-1076/NP-036
Replacement of damaged Sewer rising main at Mother Teresa Home Pulia emanating from Leprosy colony SPS.
Supply of Portable MS Road Barricades for safety measures for Rising main Sub Division under HPI
Repairing of 04 Nos expansion Joints in South Delhi Rising main emanating from Sonia Vihar WTP
Re-routing of 900 mm dia Rising Main Feeding to PPCL inside Rithala STP Phase-1.
Painting of 800 mm dia rising main emanating from Jeevan Park SPS along with allied work.
Replacement of damaged existing burnt out old rising main in Girls Hostel and Other misc work
Replacement of damaged existing burnt out old rising main in Boys Hostel and Other misc work
Improvement and maintenance of STP water rising main line of Sector-24 and 25 in Dwarka
Replacement of defective air valve installed at Drain on Rising main of Rohini Sector 17 SPS.
Improvement and maintenance of STP water rising main line of Sector-24 and 25 in Dwarka
P/L water line from Recycling plant to Rising Main office HP-I at Haiderpur WW.
Improvement And Servicing of different size sluice valves of rising main No. 1 of Kilokri SPS
Repairing of 04 Nos. Expansion Joints in South Delhi Rising main emanating from Sonia Vihar WTP.
Renovation of 900 mm dia sluice valve required for rising main network for CT-2 Dwarka
Construction of 18 MGD SPS at Mori Gate Drain including 1000mm Dia Rising Main. (Re Invite)
Hiring of TATA-407 Vehicle for Rising Main Work under Bhagirathi Water Treatment Plant (Re-Invited)
Fire pipe line Maintenance work from Udhyog Bhawan to Huda City Centre, Sultanpur Depot and Gurugram Staff Quarter and PTM line Maintenance work from CTST to Saket in L-2 South (For 3 Years).
Fire pipe line Maintenance work from Udyog Bhawan to Millennium City Centre, Sultanpur Depot and Gurugram Staff Quarter and PTM line Maintenance work from CTST to Saket in L-2 South (For 3 Years).
Replacement of Header pipe line and valves of Oxygen Gas plant at DDU Hospital, Hari Nagar, New Delhi (SH Providing Bed Had Panel and Oxygen, Vacuum out let in Emergency Casualty etc. as reqd.)
Providing and Laying 450 mm dia D.I. Pipe Line from ITO pump station near Indraprastha police station to drain no. 12A under Sub Division-3 of Division C and ND- Roads, New Delhi. (RECALL)
Design and Laying of water supply Pipe Line System (PTM Line) from Yamuna River Bridge (near RSS, KG side) to Kashmere Gate and Utilization of Seeping water at Kashmere Gate (L-6) dead end.
REPAIR/ REPLACEMENT OF WATER SUPPLY PIPE LINE, PUMPS/ MOTORS, SLUICE VALVES AND CONNECTED FITTINGS/ FIXTURES/ ACCESSORIES, CLEANING OF UNDERGROUND SUMP AND CLEANING OF SWIMMING POOL AND REPAIR/ MAINT OF SUMMER APPLIANCES AT TAG LOCATION
REPAIR MAINT OF WATER SUPPLY DISTRIBUTION SYSTEM INCLUDING PIPE LINE NETWORK CONTROL SYSTEM, VALVE PIT REPAIR WK, FIRE FIGHTING WET RISER INCL SPRINKLE SYSTEM AT AHRR UNDER GE EM RR HOSPITAL, DELHI CANTT 10
Repair of damaged SCI pipe line, uprooting stay unwanted vegetation/ peepal tree in shaft of Block B, D, F, G, H and providing and fixing manhole cover of T.T.H. Dhaka Complex, University of Delhi
EOR to Children Home I and II Alipur Delhi 110036 (SH (A) Construction of new septic tank (B) Providing and laying horticulture pipe line and sewer line for toilets in CH I and II.
Fabrication, Erection and Fixing of M.S Jaal at Sumpwell with inspection platform i/c Supplying and Laying of 900mm dia pipes on existing delivery pipe line etc. at Sonia Vihar Pump House 2nd call.
Restoration of road cut made by IGL for laying natural gas pipe line in DDA flats (748 Janta Flats) Shivaji Enclave at Ward No. 003-S/WZ by pdg. CC from in Raja Garden.