Loading…
Loading…
Found 19 active tenders
19 results • Latest
Balance Works of Widening-Improvement to 4 Lane with Paved Shoulder from Km 146.246 to Km 157.460 of Dillai to Lahorijan (Package-7) of NH-29 in the State of Assam on Item Rate Basis in FY-25-26 (3rd Call)
As per APWD-NH SOR 2020-21: Item No.: 3.15: Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.) *Note- Only Milling Machine is allowed for scarifying the existing bituminious surface
Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH 210 in the state of Sikkim
Remuneration for Local Staff (inclusive of per Diem allowance)
Special repair through Short Term Maintenance Contract on Mungiakami Champaknagar road section in various stretches from km 422.000 to km 423.000, km 436.700 to km 437.500, km 437.750 to km 438.000, km 438.340 to km 443.000, km 444.000
Clearing Grass and Removal of Rubbish : Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRT&H Technical Specification Clause 201.
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of Jammu and Kashmir on EPC mode
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode.
Road reconstruction and Slope protection work at 39.50 km near Mahanadi and Valley side restoration work at 37.00 km near Daragaon Devi Mandir of NH 110 old NH 55 during the FY 25 to 26 under NHIDCL on EPC Mode in the state of West Bengal
Road reconstruction & Slope protection work at 39.50 km near Mahanadi and Valley side restoration work at 37.00 km near Daragaon Devi Mandir of NH-55 (New NH-110) on EPC Mode in the state of West Bengal
STMC for widening to 2LPS from km 22.6 to km 24.9 at Sepahijala Total length 2.300 km on road Agartala to Udaipur NH 08 in the State of Tripura in FY 2025-26 on percentage basis and work order basis
Item Sl. No. 1 Clearing and Grubbing Road Land: Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.