Loading…
Loading…
26 results • Latest
Balance work of strengthening of Ukhrul to Choithar section of NH-202 from existing km 50.520 to km 59.236 (design chainage km 45.600 to km 54.212) in the State of Manipur on EPC mode under NH(O)-NE (package-4, length-8.612 km).
BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM)
Restoration and Periodical repairs by way of clearance of landslides surfaceboulders including construction of Rwalls Bwalls and laying of WMM and Bituminous Carpeting on ChatrooSingpora link road from km 000 to 19600 in the JK
SH: 1. WMM & Bituminious Macadam & Bituminous Concrete.
Development,Maintenance,Management and Operation of Greenfield HSC from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on HAM. (Pkg-4 From Km 133.32 to Km 164.35,Design Length -31.035km
Appointment of Safety Consultant for Widening/Improvement to 4 Lane with Paved Shoulder for Package-7 of Silchar- Churaibari Road in the state of Assam on HAM mode (Length- 14.38 km)-3rd Call
KEY PERSONNEL Senior Road Safety Auditor cum Team Leader (1 no)
Appointment of Safety Consultant for Improvement to 4 Lane with Paved Shoulder for Package-1 of Silchar- Jiribam Road in the state of Assam on HAM mode (Length- 20.00 km)-3rd Call
KEY PERSONNEL Senior Road Safety Auditor cum Team Leader (1 no)
Short Term Maintenance works between Km. 211.050 to Km. 225.150 (Kandigram Malua to existing Karimganj Bypass) on NH 37 and 8 (New) at the Risk and Cost of the Concessionaire in the State of Assam in FY-25-26
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means (Bituminous course)