Loading…
Loading…
1,377 results • Latest
Sujnipara - Provision of 2nd detection at SUJNIPARA (SPLE) for reliability improvement
Upgradation of Railnet Server to cater the continuously increasing requirements of telecom network over Bilaspur division
Ajmer Division: Provision of Dual VDU by replacing operating panel at 07 Nos. EI stations in (JAL-MOI) section under the jurisdiction of ADSTE/ABR in Ajmer division
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Signaling Work in connection with fencing work in KALYAN - IGATPURI section of Mumbai division.
Replacement of Low Insulation/ defective Signaling cables under the jurisdiction of Sr.DSTE/LMG.
Supply, Installation, Testing and Commissioning of Signalling material in connection with Ranayala Jasniya Station: Provision of EI system at Left Over PI station in Dewas-Maksi Section.
Provision of Dedicated OFC for in-built block in EI between MED-AKE & IDL-BSX Sections in connection with Mudkhed-Medchal Doubling Work of Hyderabad Division of S.C.Railway.
Signal and Telecommunication work in connection with proposed construction of ROB in lieu of LC gate no.09 at Km. 224/4-5, LC gate no.10 at Km.229/7-8 and LC gate no.10A at Km. 239/0-1 in Pune-Daund section and LC gate no.38 at km 137/9-10 in Pune-Lonavala section.
Asansol Division: Replacement of equipment of interlocked LC Gates on age cum condition basis & reliability improvement.
Howrah Division-Signalling work in connection with- Schedule A1-Signalling Cost for Construction of new LHS in lieu of LC Gate No. 26 by Railway's relieving girder under AEN BDC. Schedule A2-Telecommunication Cost for Construction of new LHS in lieu of LC Gate No. 26 by Railway's relieving girder under AEN BDC.
Howrah Division-Signalling work in connection with- Schedule A1-Signalling cost for construction of new LHS in lieu of LC Gate No. 24A/4(E) by Railway's relieving girder under AEN/AZ. Schedule A2-Telecom cost for construction of new LHS in lieu of LC Gate No. 24A/4(E) by Railway's relieving girder under AEN/AZ.
Strengthening and Augmentation of Signalling Assets at LC gates for reliability improvement, enhancing safety and improving punctuality in Train operations along with alteration in EI for the closure of LC gates at various interlocked LC gates under Danapur division.
Interlocking of L.C. gates TUV>20000 in the section of ADSTE/MB of Moradabad Division.
Signaling work in connection with Fencing work in KALYAN - KARJAT - LONAVALA and KARJAT - KHOPOLI section in Mumbai division.
Signalling work in connection with Replacement of steel girder by PSC girder of bridge no 66/1, 72/1, 79/3 (6 spans) (1 x 12.20m) on UPRD & DNRD Br. No. 79/2 (4 spans) (2 x 12.20m) UPRD & DNRD of DW-BSR section and Panvel-Roha section Br.No. 85/3 (1 x 12.20m) (1 span) (Total = 11 Span).
Asansol Division: Telecom work i/c/w the work (1) Asansol Division: Regirdering & strengthening of embankment & other ancill. work of Br.No.9 & 9A on UP & DN DSP line between KAN-ASN sec. under AEN/BRL/ASN (2) Replacement & renovation of PSC girder for Br.No-20, protection & other ancillary works at UDL under DEN/4/ASN. (3) Replacement of BGML girder, jacketing & protection work along with other ancil. works of br. no.3 in between SCN1-TOP in sec. AEN/BRL/ASN
Asansol Division: Replacement defective Quad Cable in ASN Division.
(i) Reliability improvement work with Replacement And Rehabilitation of telecom gears and Telecom cables, OFCs in Bangaon-Barasat-Hasnabad-Dumdum Jn.-Rajchandrapur, Sealdah-Ballygunge-Sonarpur-Canning-Baruipur-Namkhana-Diamond Harbour-Budge Budge-Majerhat section of Sealdah division. (ii) Telecom work in connection with replacement of existing Panel Interlocking System with new Electronic Interlocking System at Nischindapur(NCP) Station.
Provision of Track Feed Battery Charger & Failure alarm System and replacement of Track Battery over Sealdah Division.
Replacement of defective S&T cables, Decayed/worn-out Location Boxes, overaged track relays and other equipments in the section of ASTE/DHN, DHN DIV
Provision of MSDAC in parallel to DC track circuit at newly commissioned ANH & NBG station of DDU Division.
Provision of centralised IP based gate phone recording monitoring system in control room over SEE division.
Annual Repairing Contract (ARC) of PUNCOM V-100 MUX Cards & Mother Board through OEM in HWH-PKU-KGP & TMZ-DGHA section for the period of 02 year in Kharagpur division
Execution of S&T work in connection with 1) Supply, Installation, Testing and Commissioning of Yard Closed Circuit Television System at 9 stations in Ranchi division, 2) Provision of Closed Circuit Television System at 11 nos LC gates (Non- interlocked) over Ranchi division along with comprehensive AMC for the period of 5 years.
Provision of CCTV Surveillance System including recording, storage and retrieval of video footages along with Telecom related works for smooth management of train and passenger movement at Puri Railway Station during Rath Yatra 2026."
S&T works in connection with development of Goods Sheds at Tajsultanpur and Dharashiv stations of Solapur Division.
Replacement of outlived Digital Electronic Telephone exchanges with IP Based Digital Electronic Telephone exchanges at Saharanpur, Jagadhari Workshop, Dhuri, Patiala, Rajpura, Sirhind, Roopnagar, Nangal Dam, Chandigarh, Kalka, Bathinda, Shimla & Ambala Cantt Railway stations over UMB Division.
Augmentation of existing ISS CCTV system in Churchgate-Virar section of Mumbai Division and installation of additional 335 cameras.
Comprehensive Annual Maintenance Contract (AMC) of Kyosan Make Electronic Interlocking systems installed at Ladowal (LDW) & Malshian Shahkot (MQS) stations of Firozpur division for Three (03) years.
Improving Reliability of Power supply by augmenting existing Power Supply with additional IPS along with Automatic changeovers in BSL-BD section) on BSL division
Replacement of old & Overaged IPS at 36 Location over HWH.
Telecom work for provision of CCTV system at 3 LC gate (LC-12 in SGF-GSW, LC-64 in BWK-BBP and LC-54 in BNW-BBP sections) of Bikaner division.
1. Signaling arrangements at proposed development of PQRS siding at Yelgur (YGL) station 2. KZJ-KI: Telecom arrangements in connection with provision PQRS siding at YGL 3. Signaling arrangements at KZJ-KI section: Ancillary works for Ballast depot at PNDP station under ADEN/MDR sub-division. (PH 3100, IRPSM ID: 11.05.31.25.4.54.009) 4. Signaling arrangements for KZJ-KI section: Proposed extension of ballast siding line at PNDP station under ADEN/MDR sub-division. 5. Telecom arrangements for KZJ-KI section: Proposed extension of ballast siding line at PNDP station under ADEN/MDR sub-division.
Provision of handheld tablet to SSE/JE/Signal and Technician/Signal for timely updation of maintenance of S&T assets and other work in Katihar Division
Interlocking of LC gate No. 146, 131 & 136 along with associated signalling and telecom work in RTA-MKC Section over Bhopal division.
Provision of centralized Online Optical fiber Cables Monitoring System for Phillaur- Lohian Khas, Firozpur-Fazilka-Abohar, Kotkapura-Fazilka, Beas- Govindwal Sahib and Tarn Taran section of Firozpur division.
Provision of Stand by Power Cable from Auto Change Over panel to IPS and IPS to Relay Room by using 16 Sq. mm copper cables in ring arrangement over HWH Division.
Improvement in existing Earthing and Surge protection arrangement as per latest RDSO- TAN version 3.0 at S&T installation in KCA-JAJ section & Improvement of earthing arragnements at mid-section Interlocked LC gates under Danapur Division.
TELECOM WORKS In CONNECTION WITH "(1) Surat-Vadodara: Increasing CSR of Loop Line at Miyagam Karjan. (2) Increasing CSR of Lines at Kharsaliya and Ranoli Stations. (3) Vadodara Yard: Raising Speed of By-pass Line from 10 KMPH to 50 KMPH. (4) Vadodara Division: UTRAN - Development of Station for Terminating / Originating of Train. (5) Vadodara Division: Increasing CRS of Lines at Bajwa, Adas Road, Uttarsanda & Mahemdavad. (6) Palej: Provision of Foot-Over-Bridge 6.10M wide at. (7) Vadodara Division: Anand - Provision of Ballastless Track on Platform No. 5 for development. (8) Bharuch: Extension of PF-1. (9) Vishwamitri: Proposed 6.10M wide FOB on replacement account. (10) Vadodara Division: Utran BG - Extension of High Level Platform and widening of DN Platform for making Passenger fit at Utran Railway Station".
TELECOM WORKS IN CONNECTION WITH "(1) Provision of fencing along the track to prevent Trespassing/CRO in DB-EKNR section. (2) Vadodara Division - Replacement of existing steel girders by PSC slab upto 12.20m of Br. No. 88, 100 of DB-ARPR section (02 No.)".
Provision of CCTV at 20 nos. of Non interlocking LC Gates and monitoring at 12 nos. of connected station and Engineering control over Kota Division
Provision and shifting/ relocation of telecom assets for traffic facility work under SSE/Tele/Kurudwadi on Solapur division of Central Railway.
Provision of Electronic Interlocking at ADF (Adina), AZR (Azamnagar Road), KWE (Khurial), MXJ (Mangurjan), TMH (Tinmilehat), CAT (Chatterhat), SUD (Sudhani), TETA (Telta), PJP (Panjipara), and GIL (Gaisal) stations on HDN/HUN route of Katihar Division
Comprehensive Annual Maintenance Contract (CAMC) of HBL make Integrated Power Supply System (IPS) for a period of 05 years in KGP Division of South Eastern Railway.
Sectional Signalling Maintenance Contract in section of SSE/Sig/RRI/CNB for period of Twenty Four Months.
Provision of Dedicated OFC for in-built block in EI between PRLI-PBN section in connection with PRLI-PBN Doubling Work of S C Railway.
Networking of CCTV at stations and control room for monitoring of LC gate over JHS division.
Provision of additional stabling lines for handling Kumbh Mela traffic in 2027 at Kherwadi, Kasbe Sukene, Nashik Road and Development of examination and maintenance facilities for NMG/ NMGH/ NMGHS rakes at Devlali Station on Bhusawal Division of Central Railway.
Comprehensive annual maintenance charges of 110V IPS and 48V SMPS of M/s Statcon Electronics India Ltd. Replacement service of various cards/modules of 110V IPS and 48V SMPS supplied by M/s Statcon Electronics India Ltd. This includes preventive maintenance attending and rectification of failure during the emergency. This AMC is for replacement / repairing of all types of defective card/modules/NMS modem-gateway etc during AMC period as per terms and condition of AMC in DGON-KWDN section for a period of 36 month.