Loading…
Loading…
1,409 results • Latest
Comprehensive annual maintenance of Hitachi make Electronics interlocking at LSC-28, 29, 30, 31, 32, 34, 35, 36, 37, 37A, Babina Auto block MLK II(1), Matatila Auto Block MLK II (1) & Talbehat MLK II (1) of Jhansi division for a period of three year.
Annual Maintenance Contract of EI Systems of Medha Make at 02 stations (Purna and Chudawa) for a Period of Four years in Nanded Division
Provision of Video Recording System in 85 Relay Rooms, 71 Station Master Rooms over Nanded Division
Provision of data entry devices for Signalling Maintenance Management System (SMMS) over Firozpur division.
S&T works in c/w compliance of RDSO TAN for Automatic Fire detection and alarm system and earthing and bonding arrangement over Jodhpur Division.
Ajmer Division: Provision for reliability improvement and upkeep/sustaining of various components/parts of IPS at various stations over Ajmer division.
REPLACEMENT OF EXISTING IPS BATTERY BANK ON CODAL LIFE CUM CONDITION BASIS OVER CHENNAI DIVISION
S&T work in connection with Provision of E-1 communication channel through OFC from RCC to Remote Terminal Unit (RTU) at 09 nos. of switching posts (NOB/SSP, BZC/SSP, SIMR/SSP, SONA/SP, PSF/SSP, KYB/SSP, RNGR/SSP, MTIP/SSP & MSAE/SP) over ADRA Division for installation of High speed TCP/IP based SCADA system.
Repair & maintenance of outdoor and Indoor Telecom gears and Periodical cleaning of Passenger amenities & related items in Churchgate-Virar suburban section for One year.
Proposed Interlocking of LC 155 between Bolda - Sirli Stations, LC 33 between Adilabad - Pimpalkhuti Stations and LC 74 between Dinagaon - Jalna Stations over Nanded Division
Reliability improvement of Medha make Electronic Interlocking system installed at MNDP station of RNY division.
Provision of Railnet facility at Barhni,Balrampur stations for SSE/Works & SSE/P Way offices in the LJN Division.
Provision of redundancy in power supply for BPAC in BG-IV section of Alipurduar division.
Request for Proposal (RFP) for Appointment of General Consultant for Signal & Telecommunication Construction unit Central Railway.
S&T works in c/w (A) Prayagraj Division-Provision of stabling lines at Subedarganj station. (B) Construction of a new island platform at Subedarganj (SFG) by dismantling at line No. 2 & 3 along with retaining of existing PF No. 6.
Provision of Aspiration type Automatic Fire Detection & Alarm System (AFDAS) for signaling installation in Khurda Road Division.
Replacement of defective quad cable patch along with Emergency Control circuit, TSS/SP/SSP communication and cable joints in Daund - Wadi section of Solapur division in Central Railway.
Segregation of Separate Power Supply from IPS for SSDAC Installation over HWH Division.
Howrah Division-Signalling work in connection with- Schedule A1-Signalling Cost for construction of LHS at Gate No. 40 at Km. No. 88/26-28 between station RSLR- PLAE under Jurisdiction of AEN/BDC. Schedule A2-Telecommunication Cost for construction of LHS at Gate No. 40 at Km. No. 88/26-28 between station RSLR- PLAE under Jurisdiction of AEN/BDC.
Upgradation & Interlocking of LC Gates 05 Gate with TVU > 20000 of HWH Division.
Upgradation & Interlocking of LC Gates 06 Gates with TVU > 10000 of HWH Division.
Howrah Division-Signalling work in connection with- Schedule A1-Signalling Cost for construction of LHS at Gate No. 18/6/C/E at Km. No. 89/21-23 between station PTAE-AGAE in liew of Un Authorized Trespass location under Jurisdiction of AEN/KWAE Schedule A2-Telecom Cost for construction of LHS at Gate No. 18/6/C/E at Km. No. 89/21-23 between station PTAE-AGAE in liew of Un Authorized Trespass location under Jurisdiction of AEN/KWAE
(1)'PATHAKOTHA CHERUVU' station- S&T arrangements in connection with Common loop facilities for Up & Down Loop Lines at PLU.(2)'KONDAPURAM' station-S&T arrangements in connection with the provision of new cross over for Common loop facility to the existing Down loop line. (3) 'Tiruchanuru' station - S&T arrangements in connection with provision of New Trip shed.(4) ONTIMITTA (VNM) station: Signalling & Telecom arrangements in connection with proposed PQRS Siding.
Telecom Facilities for new class room ,model room ,principal office mess at MDDTI of Kota Division WCR
S&T arrangements in connection with Provision of (1) 03 lifts for 12m FoB at ATP station. (2)03 lifts for old FoB at AD station.(3)3 lifts for New 12m FoB and 3 lifts for existing FOB at DHNE station.(4)two lifts for New 12m FoB at MALM station. (5)two lifts for existing FoB at RC station.(6)2 lifts for New 6m FoB and 2 lifts for existing FOB at RJP station.(7)2 lifts for New 12m FoB and 2 lifts for existing FOB at TU station.(8)two lifts for existing FoB at YG station.(9)one lift for existing FoB at Gooty Jn. (GY) station.(10)two lifts for existing FoB at KRY station.(11)two lifts for existing FoB at MPL station.(12)two lifts for new 6m FoB & Two no of Lifts for existing FOB at PAK station.(13)two lifts for existing FoB at PIL station.(14)06 Escalotors for New 12m FoB at DHNE station.(15)04 Escalators for 12m FoB at KHT station.(16)04 Escalators for New 12m FoB at MALM station.(17)04 Escalators for New 12m FoB at RC station.(18)04 Escalators for New 12m FoB at TU station. (19)04 Escalators for New 12m FoB at YG station.(20)06 Escalators for 12m FoB at ATP station.(21)03 No of Escalators for new 12m FoB at HX station.(22)f 02 lifts at Yerraguntla (YA) station.(23) Telecom arrangements in connection with the construction of new Trip shed at Renigunta station.(24)existing pipe culverts(4x0.90) with RCC boxes (5x1.50x1.50m) at Bridge No.154 @ Km.93/22-24 in KPD-TPTY section of Guntakal division.(25)replacement of steel girder bridge with PSC slab in Guntakal - Kalluru section (Bridge No. 25 UP)(26)new office building for RPF outpost at Mantralayam Road station.(27)Upgradation of Raichur goods shed duly dismantling existing HL platform at RC station.(28)GY-DMM section: S&T arrangements for Ancillary work to improve existing drainage arrangement at RUB No.109A (LC No:117) & 103A (LC No:118).(29) 03 lifts for 12m FoB and 1 lift for Existing FOB atDMM station.(30)06 Escalators for 12m FoB at DMM station and(31)two lifts for 12m FoB at KHT station.
Telecom work in connection with provision of Machine and Plant facility for IOH/POH at STMD/NJP.
Signalling work in connection with USD-UDN - TFR - 123.31 Tkm, TBR - 13.393 Tkm & P&C - 37 nos, TBSR - 225 nos. of Udhna -Jalgaon Section of Mumbai Division.
Construction of S&T service buildings (LSC) in KAA-ALJN section in connection with the work of "Reliability improvements of track circuits by provision of MSDAC in parallel of existing DCTC at 14 stations in KAA-ALJN section of Prayagraj Divn. of NCR
Provision of Warning alarm of failure of track feed charger at 42 stations alongwith switching between critical track circuits over sonpur Division.
Comprehensive Annual Maintenance Contract (CAMC) of Integrated Power Supply System (IPS) (Statcon Energiaa make) for a period of 05 (Five) years installed at different stations in Kharagpur Division of South Eastern Railway.
Comprehensive Annual Maintenance Contract of STATCON ENERGIA make IPS (24 nos.) installed over Lucknow Division of Northern Railways for 36 (Thirty-Six) months
Appointment of General Consultant Under jurisdiction of Chief Signal & Telecom Engineer /Construction/ Eastern Railway.
Vadodara Division: Provision of CCTV System at Station yard area to monitor Main Line Points and Crossings, especially.
Provision of digital sign language information system for persons with disabilities (Divyangjan) at Ludhiana & Amritsar stations over Firozpur Division.
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Bondamunda Yard (Km. EN/ 44-45).
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra (Km. 409/ 6-8).
Provision of RDSO approved CCTV Camera in & outside of lifts at various locations over JU division.
Augmentation of CCTV at various locations of DRM office & Campus, Railway Hospital, RPF Barrack and Railway Staff colony of Jhansi division and monitoring of Crowd in disaster management room
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Rourkela-Kuarmunda (Km. 419/ 13B-14B).
Comprehensive Annual Maintenance Contract (CAMC)for Electronic Interlocking Systems of M/s. Hitachi make at 7 stations [STE, HAH,KRNR, AKK,MGF,HLN & MVC] in MYS division for a period of the three years.
TELECOM PORTION OF WORKS CONNECTION WITH RENOVATION OFCONFERENCE ROOM AT PCMD/SR CONFERENCE HALL
Comprehensive annual maintenance contract of M/S Statcon make integrated power supply (IPS) system installed at MACLS/PI/SSI station, Cabin, LSC, interlocked LC gates and IBH over Jhansi division for the period of three years.
Alteration Work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Rourkela-Kuarmunda Section.
Augmentation of Block Working Arrangements by Provision of Solid State Block Instruments in lieu of Existing FM Block Instruments in POY-CNV and VNB-NIL Single Line Block Sections of Palakkad Division, along with Associated EI Alterations and Other Signalling Works at POY and CNV Stations.
Alteration Work for Interlocking of 01 Nos. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra Section.
Provision of 07 Nos. Electronic In-Motion Weighbridges(EIMWBs) over Chakradharpur Division.
Alipurduar Division: S&T Balance work for Utility shifting in connection with development of Stations under Amrit Bharat Station Scheme at GOGH station.
Provision of replacement of batteries, antenna etc of 5W walkie talkie; battery and surge arrester for 25 W VHF set in Kharagpur Division.
Hyderabad Division: 1: Provision of CCTV Surveillance System at 17 Goods Sheds - Telecom arrangements.
Upgradation and Provision of RDSO-based VSS (Video Surveillance System) at SVDK Station under Jammu Division.