Loading…
Loading…
1,409 results • Latest
Annual maintenance contract of Web and Android Based Cable Protection Management System in Jaipur Division for 3 Years.
Signalling interlocking works in connection with modification in interlocking at MNUR and Track Machine siding at OTP station and Signalling Modifications, Assets Renewal & system improvements in stations over Palakkad Division.
S&T work in c/w 1) Provision of Boundary Wall at CRO locations between Kurali- Mianpur stations.2) Provision of Boundary Wall at CRO locations between Ghanauli-Bharatgarh stations .3)Provision of Boundary Wall at CRO locations between Rup Nagar-Ganauli stations SIR-DLPC sections. 4)Provision of Boundary Wall at locations prone to encroachments in the approach of NLDM & KART Yard. 5)Provision of Boundary Wall along the track for safe running of trains on vulnerable CRO locations near Abohar Juncation.
S&T works in connection with elimination of LC 3 & 59 in Rewari yard with construction of ROB and RUB at same location in Jaipur Division.
Supply, installation, testing and commissioning of Telecom material in connection with Provision of CCTV System at Station yard area to monitor main line points and crossings, especially in Ratlam Division.(Phase-I 38 Stns)
Telecom Works for Extension of PP shelter of PF No. 8/9 and 9A with kota stone flooring including utility shifting and development of adjoining area with proper ramp, cattle guard, fencing along track approach etc. of Charbagh station, Northern Railway
Telecom work for strengthening of telecommunication infrastructure in LKO-SLN- ZBD section of Lucknow Division of Northern Railway in view of upcoming Inspection.
Telecom works for Provisioning of CCTV & railnet at Running room Sultanpur (SLN) Station of Lucknow Division, Northern Railway
Proposed Replacement of Existing VDU and Embedded PC at 4 stations (SCT, AYVN, EDN, PUU) on codal life basis and Replacement of VRLA Battery on codal life basis over MDU division.
Bhavnagar Division: Supply installation testing & commissioning of Signal &Telecom materials in connection with Junagadh-Relocation of MG Station from existing place to Grofed Area.
1. Provision of Electronic Interlocking at Martyr Captain Tushar Mahajan (MCTM) station alongwith Telecom work including Block Working in c/w "UDHAMPUR-now Shaheed Captain Tushar Mahajan Nagar- Provision of R&D facility on Goods loading line to curtail arrival to placement time" over Northern Railway". 2. Provision of signalling arrangements in c/w "Setting up of additional trip shed at Shri Mata Vaisho Devi Katra (SVDK) over Firozpur division for inspection and maintenance activities of Electric Locomotives" over Northern Railway
Sectional Signal Maintenance Contract (SSMC) for the sections of DSTE/FZR for one year.
S&T work in c/w (1) Repl. of steel girder with RCC slab of Bridge No.102 UP&DN, 111 UP&DN, 119 UP on JUC-ASR sec., B.no.180 on ASR-ATT & br. no.103 on VKA- DBNK section. (ii) Construction of LHS of internal size 5 m X 3.5 m LHS in lieu of LC C-7 at KM 4/13-14 on JUC-NRO section under ADEN-JUC over firozpur division. (iii) Construction of LHS of internal size 5.0 X 5.0m at manned L-xings No.A-5 on VKA- DBNK section by pushing method in the section under ADEN-I/ASR. (iv) Construction of RCC box (2 nos. twin boxes) bridge in lieu of steel trough bridge no.158 in PHR-LNK section.
Comprehensive Annual Maintenance Contract (CAMC) of CO2 type Fire Extinguishers installed at Jabalpur division including repairing & servicing (refilling and change of spare parts as per the requirement) of CO2 type Fire Extinguishers complete for Three Year on Jabalpur division of West Central Railway.
Comprehensive Annual Maintenance Contract of Integrated Power Supply (IPS) System of M/s Statcon Electronics installed in CTP-14 Section (DERN-REJN) under jurisdiction of DFCCIL/Noida for a period of 36 months.
Provision of train indicator, Coach indicator and other passenger amenities in connection with the work of "Provision of minimum essential amenities and Divyangjan Facilities at Valivade, Bhilawadi and Rukadi stations of Pune division".
Replacement of over aged Earth Leakage Detector (ELD) on age cum conditional basis over Firozpur division.
Annual maintenance contract of Matrix Exchange at Lumding in Lumding Division for a period of Three years.
Provision of Test Zig (Relay tester), local PC for Datalogger, SPDs and Class-A protection.
Appointment of Project Supervision services Agency for providing Project Supervision Services for various signaling projects of S&T Department in Rajkot Division, Western Railway
Annual Maintenance Contract of sectional OFC in section JRBM-KGBP (54.26 KM), BHRB-SANG (50.5 KM) , LMG-FKG ex NLN-DPU (129.2 KM) and other block section (86.89 KM) of Lumding Division
(i)Improving reliability of Mid section Interlocked LC gates through casual renewal and directed maintenance. (ii) Maintaining of Boom Height upto 01 mtrs from road surface at most busy gates.
S&T work in connection with Construction of Passenger Platform in DN Grid at Dangoaposi.
S&T works in connection with Extension of Line No-4 at Barbil Station.
S&T work in connection with Construction of a Loop Line for 3rd Line and one sick siding of length 70 M. at Talaburu.
Comprehensive annual maintenance contract (CAMC) of M/S Amararaja make integrated power supply (IPS) system installed at MACLS/PI/SSI station, interlocked LC gates and IBH over Jhansi division for the period of three years.
Provision of Television in connection with Integrated Passenger Information system (IPIS) at various stations of Nagpur division.
Enhancement of Integrated Passenger Information System at 6 locations of Nagpur division Central Railway.
Comprehensive Annual Maintenance Contract of Multi Section Digital Axle Counter of Siemens- Make in the section of Sr.DSTE/ALJN of Prayagraj Division for 24 Months
Asansol Division: Shifting of Gate Lodge by construction of New gate lodge to avoid SOD infringement including replacement of old, dilapidated gate lodge along with improvement of level crossing road surface in STN-JAJ Main line MDP-GRD & JSME-BDME branch Line.
Rehabilitation of relay room,location box etc and strengthening of Axle Counter system over Sealdah Division.
Provision of CCTV Cameras at 12 Non-Interlocked Manned LC Gates at different locations over Dhanbad Division.
S&T work in connection with the interlocking of 4 nos. of LC gates in the section of SSE/Signal/BQA in Adra Division.
S&T work in connection with the Interlocking of LC Gate RC-5 and DK-2 in the section of SSE/Signal/ADA in Adra Division.
S&T work in connection with the construction of RHS between Km 283/5 - Km 283/7 towards JOC end at Adra in Adra Division.
Ajmer Division: Provision of Dual VDU by replacing operating panel at 07 Nos. EI stations in (NANA-IQG) section under the jurisdiction of ADSTE/ABR in Ajmer division."
Kota division: Replacement of defective signalling cables for enhancing safety of signalling system.:Replacement of Old & Outlived Batteries at 24 Stations and 2 IBH on Kota Division
Comprehensive Annual maintenance contract (AMC) of Integrated Power Supply (IPS) System of STATCON Make. 20 Sets of Station (Major) IPS at 17 stations and 18 Sets of Gate/IBS (Mini) IPS at 02 IBS, 01 Auto Hut and 15 LC Gates over Lucknow Division for 03 years.
Bhavnagar Division: Supply installation, Testing, Commissioning of Signalling gears and alteration in Medha make Electronics Interlocking system in connection of Bhimnath- Provision of Additional Loop Line.
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
Danauli Phulwaria - Yard remodeling work for extension of CSL of lines at DPL station.
S&T portion of work in connection to (1) Replacement of Integrated passenger information system (IPIS) at HIJ (PF No-1 &2) & KGP ( PF No- 7 & 8). (2) Comprehensive Annual Maintenance Contract (CAMC) of Double faced CGDB, Single line double faced Platform display board, Single faced Monocolor (MLDB) Three Line Train Arrival/Departure display board, Platform Data Controller (PDC) & Central Data Controller Unit (CDC) at HIJ (PF No-1 &2) & KGP (PF No- 7 & 8) in KGP Division of S.E.Railway.
Monigram - Provision of 2nd detection at MANIGRAM (MGLE) for reliability improvement
Replacement of Datacom Equipment's of PRS/UTS at Tier 2,3 & 4 and down locations over Hubballi Division
Provision of CCTV Cameras for Escalators at MYS, DVG and Lifts at, HAS, ASK, DRU, RRB, SMET, KRNR, TTR & SBHR Stations of Mysuru Division
Provision of CCTV network, Railnet/LAN network and Telephone connection at Construction of new RPF Out Post building at Pandavapura (PANP).
S&T Works in connection with the Elimination of LC Nos. 102, 103 and 104 between SBHR-KBPR station by Construction of Low Cost ROBs.
Ajmer Division-"Provision of 72 CCTV cameras with monitoring and recording system at all Major Booking office & PRS counters, 22 Stations (29 Locations)."
Ajmer Division: Comprehensive Repair Maintenance Contract of Window/Split Air Conditioners (Capacity-1.5 & 2 Ton) at various stations/IBH over Ajmer Division for 03 years
Ajmer Division:- Provision of S&T Associated work in C/W Chittaurgarh-Udaipur- TTR(FS+TWS+ WCMSC)-45 set in Ajmer Division NWR