Loading…
Loading…
10,614 results • Best match
Supply Laying jointing teriminating testing and commissioning of 33 KV 1X630 sqmm Aluminium XLPE Cable from 110 KV Thirumudivakkam SS to the proposed 33 11 kV indoor SS Kundrathur Amarprakash under Turn Key Basis
Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road)
NABARD FUNDED MODERNIZATION OFF CH. CHARAN SINGH GOLA PUMP CANAL GORAKHPUR. SUPPLY, INSTALLATION AND TESTING WITH PROPER LAYING OF 3Cx240 mm2 11 KV HT XLPE CABLE AT GOLA PUMMP CANAL, GORAKHPUR.
NABARD FUNDED MODERNIZATION OF CH. CHARAN SINGH GOLA PUMP CANAL GORAKHPUR. SUPPLY, INSTALLATION AND TESTING WITH PROPER LAYING OF 3Cx240 mm2 11 KV HT XLPE CABLE AT GOLA PUMMP CANAL, GORAKHPUR.
Supply, Laying OFC cable including Installation and making connection of 3 nos IP Cameras (Cam-4,5,6) beside Pre-settling pond no-1,3 including making connection from Admin building to pond area.
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, Providing earth bore, earth mat and earth electrode, cable laying and termination etc., for establishment of 110kV SS at Elur
Labour for laying of cable in duct/trunch including the cost of Alu.tag for identification Up to 8 Core
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT HL SARKAR ROAD FROM PRE NO. 157 TO 173 HL SARKAR RD. IN WARD NO. 113 UNDER BR XI
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT GOSTOTALA NEW SCHEME PRE NO. 303 TO T-136 GOSTOTALA NEW SCHEME IN WARD NO. 111 UNDER BR XI
Bituminous Macadam using Hot Mix Plant(HMP) (Using bitumen VG-40) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired -compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). A. For Grading 2(19.0 mm nominal size, 50-75mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 251&252(item 5.03). 7th Addenda & Corrigenda SOR 2018)