Loading…
Loading…
47,955 results • Best match
Provision of indications On-board of UREBC in the Switch Board Cabinet of LHB Non-AC Coaches in Mechanical Workshop, Gorakhpur.
Fabrication and supply of SS 304 indicator support bracket as per site requirement.
Repairs work of series check dams gate near Tenguti village in Kushtagi taluk of Koppal district.
Design, fabrication,supply,erection, testingandcommissioningof ...
Construction of Compound wall and Three Storied Rajagopuram to Sri Lakshmi Narasimha swamy Temple, Balasinganapalli(V), Chennuru(M), Kadapa District
... but excluding the cost of steel and its fabrication charges.a) plinth beam
Proposal for maintenance work of pumping machinery (monoblock and HSC to maintain water supply under various RWSS Sub division Tibbi
Providing, Fabrication of Mild Steel Plane Ended/ Flanged Specials ...
Realignment of Existing 700MM Dia PSC Water Pumping Main by Supply, lowering, laying, jointing and testing of 700MM Dia MS Pumping main at Devuni Kadapa Road from Electric Sub Station (Ch 0/0 to Ch 0/165) towards Devuni Kadapa in Kadapa Municipal Corporation
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Excavation, recharge borewell, wire fencing and beutification work at sadulai talai.
... strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or ...
For Attending 33/11 KV and LT, underground Cable/Outdoor/Indoor in area of UEDD-Chetmani, Varanasi
... size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 ...
T-13/EUDCB/2026-27
Fabrication of 33 KV bus Isolator Structure including supply of all materials with grouting and fixing etc.
Modification in LT panel room and other allied works at Nilothi SPS under ISP Package-2
... Installation and testing of Site Fabricated sheet metal ducts in accordance with ...
Construction of 33/11 KV GSS Bacher alongwith associated 33 and 11 KV lines works under Jhadol Sub-Division of Udaipur circle under Ajmer Discom on Labour Rate Basis
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling as per design and drawing.
Construction of 33/11 KV GSS Katanwara alongwith associated 33 and 11 KV lines under sarada Sub-Division of Salumber circle under Ajmer Discom
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling as per design and drawing.
COLRD/7117/2025-H7/ VP 26-27/CONSTRUCTION OF NEW ANGANWADI BUILDING AT NORTH STREET IN KALANKULAM VILLAGE AND PANCHAYAT
Supplying and fabrication of Steel Fe 415/500 grade required... works involved including fabrication and labour charges for Cutting, ...
Providing shaded accommodation for new RFID gate at B Ramp including providing grill gates for all new RFID gates in Port area
Structural steel Fabricating, riveted, bolted or welded ...
Construction of 2-Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 33 (Km 30/1-3) (Railway and approach portion) on the Anand-Godhra section; 2-Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 44 (Km 39/15-40/1) (Railway and approach portion) on the Anand-Godhra section; and 4-Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 220 (Km 377/9-378/0) (Railway and approach portion) on the Surat-Vadodara section, including foundation, substructure, superstructure, composite/PSC/RCC girder works, viaduct, return walls, earthwork, road works and all other ancillary civil works under the jurisdiction of CE/C-II/CCG, Vadodara Division, Western Railway.
... complete assembly to be of cast steel / fabricated structural steel, metal and elastomer elements complete ...
Establishing 2 x 20 MVA, 66/11KV Sub-Station at Puttaianapalya (Kurubarahalli Village) along with Running of 66KV, 1000Sqmm copper single core XLPE UG cable LILO line from existing 66 kV Byadarahalli - Tavarekere SC line to proposed 66/11 kV Puttaianapalya (Kurubarahalli Village) sub-station for a route length of 3.655 Kms in Bengaluru South Taluk, Bengaluru Urban District on Partial Turn Key basis including design, testing, supply of UG Cable and supply of all matching materials/equipments (Excluding supply of 11 kV Switchgears) and erection (including civil works) of all materials/equipments, testing and commissioning.
c)Construction such as Metal Clad, Fabrication Steel, aluminium house air Insulated etc.,
Providing 66kV SC Link line between existing 66/11kV Sub-station Haradanahalli to the existing 66/11kV Sub-station Vaderahalli for a distance of 12.785kms with Panther conductor and construction of 1 no. of 66kV Terminal Bay at 66/11kV Haradanahalli Sub-station & 1 no. of 66kV Terminal Bay at 66/11kV Vaderahalli Sub-station in Nagamangala Taluk, Mandya District on Total Turnkey basis including supply of all matching materials/equipments and erection (including civil works) of all materials/equipments, testing and commissioning.
c)Construction such as Metal Clad, Fabrication Steel, aluminium house air Insulated etc.,
Supply, installation, testing and commissioning of Air Conditioning of HVAC, Electrical and sound system (with speaker control) of Palliative care at 3rd floor of Hospital Building in AIIMS Bhopal.
Outdoor stand fabrication :- Supply, fabrication and erection of angle/channel/flat... required size, making holes, fabrication, welding, cutting, etc. ...
CONSTRUCTION OF CHECK DAM AND PROTECTION WALL TO HALLA NEAR KOLAGATTA IN HUNSURU TALUK MYSURU DISTRICT
6 Steel Fabrication - Supplying, fitting and ...
Increasing Capacity work of Power T/F (No. 02) from 8 MVA to 12.5 MVA under 33/11 KV S/S Amritpur Patti, EDSD(First), Jaspur under the Head of Capital (SI).
Fabrication of Structure
ELECTRICAL WORKS
FABRICATION OF STRUCTURE
Providing Repairs and Basic Amenities to MJPAPBCWR School for Girls at North Amulur (V) of Alluru (M) in SPSR Nellore District - Estimate Cost of Rs.83.00 Lakhs
... excluding cost and conveyance of steel and its fabrication charges complete for finished ...
Construction of compound wall for front side of Parveti Mandapam at Srivarimettu
... etc., and excluding cost of steel and its fabrication charges for finished item ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Removal of hot insulation Refer BOQ; As per Scope of work and ATC, and Installation of Plant/Systems/Equipments (Version 2) - ... Tray/bracket Fabrication work ...
... Operation/PSD: Tray/bracket Fabrication work (All area) Refer BOQ; ...
Construction of Shed to AGHS Khammam (A) Gollagudem (V) of Khammam Rural (M) in Khammam District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
CREATION OF 250 KVA HT TRANSFORMER ALUMINUM WOUND (LEVEL-II) SUB-STATION INCLUDING MS TUBULAR POLES and TRANSMISSION LINES AT DW STATION JUMANDUB CHANDERGEER OF MISD HAJIN.
... specifications , process of fabrication and involvement of material ...
Replacement of Existing Damaged MS Tank by way of Installation of Make-up Water Storage Tanks with MS Platform , Cross Bracing ,MS Ladder and Pipeline System of Chiller Plant of Capacity 225TRx03 nos. at Government Super Specaility Hospital Jamm
Fabrication and installation of a structural... exposure.The complete job include fabrication, erection, welding, anchoring, ...
Construction of additional class rooms in the existing GOVT. PS First Lancer, First Lancer under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of additional class rooms in the existing GOVT. HS (G) 2nd Lancer, Ward No.9, Langer House under Core Urban Region Economy in Hyderabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of box culvert at Km 5.82 of Mahalingapur-Betageri SH-286 in Rabakavi-Banahatti taluka of Bagalkote district under 5054-80-190-0-01-132 KRDCL capital expenditure for the year 2025-26
8 Item Description : Steel Fabrication Supplying, fitting and placing ...
GENERAL-Mokery Grama panchayat Construction of Water Tank and appurtenant works-Electrical work-Project No-SO146/26 General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Supply and Installation of 12 Mtr High Mast system with 6 x 200W LED Flood Lights at Parappuram Junction, Mullankunnu, ward-12 in Vazhakulam GP under MPLADS 2024-25 of Sri. Haris Beeran MP
90.14.1.2 Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Tender for providing 11 kV Single Circuit from 33 11kV SubStn Thalout to 132 kV Pot Head Yard of 126 MW Larji Power House under the Resident Engineer, Larji Power House Division HPSEBL, Thalout Mandi.
... 50x50x6 mm Length 1800 mm: Fabrication and supply of members made ...
Supply and Installation of 6 Nos. of 8 Mtr Mini Mast systems with 6 x 120W LED Flood Lights at various locations in Mala Block Panchayath, Thrissur District under MPLADS 2024-25 of Sri. Benny Behanan MP
90.14.1.2 Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
GENERAL-RCB at PATHALAM ( LOCK SHUTTER STARTER )-Shifting of starter unit for lock shutter to nearest side of control room and allied electrical work in Pathalam RCB. General Electrical Work
90.14.1.1:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
BID FROM EMPANELLED AGENCIES FOR EVENT MANAGEMENT SERVICES FOR THE INAUGURATION EVENT AT BHUBANESWAR
Entrance & Fabrication
Construction of Faecal Sludge Treatment Plant FSTP 10 KLD in Kovilur Panchayat in at Vedasandur Block in Dindigul District Swatch Bharath Mission Rural Phase II SBM G 2025- 2026
Supply and fabrication of steel for all RCC item of works including all cost and conveyance and all lbour charges etc complete .
State Plan-2023-24-Energy efficiency improvement, Optimisation of electromechanical items, Safety audit and ensuring safety in the operation of WTPs and PumphousesWSS to Anjarakandy, Perlassery and adjoining Pts- Supply and Erection of VT Pump set at
OD109526/2024-2025:In situ fabrication of M.S. pipes of size 900mm... charges of M.S. plate, all fabrication charges, charges of painting ...
Supply and Installation of 2 Nos. of 7 Mtr Mini Mast system with 3 x 70W LED Flood Lights at Vattaparambu Alinchuvadu and Paruthipra K. P Kunnu in Division 14 of Wadakkanchery Municipality, Thrissur District under Annual Project 2025-26, Project No 2
90.14.1.2 Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Supply and Installation of 1 No. of 12 Mtr High Mast system with 6 x 200W LED Flood Lights and 9 Nos. of 8 Mtr Mini Mast systems with 4 x 150W LED Flood Lights at Vorkadi, Kumbala, Meenja and Puthige GPs in Manjeshwar LAC under MLA ADS 2023-24
90.14.1.2 : Fabrication, supply, conveyance, installation... complying to IS 8623.br> Fabrication of fully partitioned, dust ...
Please Refer BOQ
90.14.1.1:Fabrication, supply, conveyance, installation... complying to IS 8623.<br> Fabrication of fully partitioned, dust ...
265/26 Electrification for Establishment of Watertank Perumkoor 4 Cent Colony
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Annual Plan-Ponnani BP-Electrification works to Drinking Water Project in Edappal GHSS supply and installation of pump set -General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Supply and Installation of 4 Nos. of 7 Mtr Mini Mast system with 3 x 70W LED Flood Lights at various locations of Division 23 in Wadakkanchery Municipality, Thrissur District -Annual Project 2025-26, Project No 254/25
90.14.1.2 Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
SITC of 12 Mtr High Mast with 6 X 200W LED Flood lights at Pottanakad , Bisonvalley Grama Panchayat in Devikkulam Constituency under MLA SDF 2022-23 of Sri A Raja MLA
90.14.1.2 Fabrication, supply, conveyance, installation... complying to IS 8623.br>Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
06/SE/EWC/AYO/2026-27
... dump site to pit site and Fabrication & erection of Single Pole ...
DEPOSIT Firefighting-Vazhoor Press Installation of firefighting arrangements in Govt Press Vazhoor Kottayam Electrical Fire Fighting Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
GENERAL-General-Budget work-2024-25 -SITC of street lights to Adoor palam town.-General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
GENERAL-General-Budget work-2024-25 -SITC of street lights to Keezhara town-General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
Supply and Installation of 4 Nos. of 7 Mtr Mini Mast system with 3 x 70W LED Flood Lights at various locations in Wadakkanchery Municipality, Thrissur District under Annual Project 2025-26, Project No 201/25
90.14.1.2 Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
DEPOSIT-Govt. Medical College Pariyaram - Additional Electrical work in Connection with Tariff Change-Electrical Works in Connection with Segregating Power Connections of Residential and Commercial Buildings at GMC Pariyaram
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...