Electrical work for provision of concealed wiring with accessories at different administrative buildings and Central Hospital to implement fire safety recommendation and augmentation of power supply arrangement at sub station no 6 and 8 GRC S.E ... S.E Railway .
Complete track renewal (P) 60 Kg = 31.475 TKm and Through Sleeper Renewal(P)=11.444 TKm. Total=43.019 TKm by using any Track Laying Equipment (TLE) in SDAH Division of Eastern Railway
South Central Railway (Construction Organization)- Engineering, Procurement and Construction (EPC) Contract for Doubling of Track between Bommaipalli station & Valigonda station including Electrification & Signaling works in connection with Doubling of Guntur-Bibinagar section and provision of Auto Fault Locator at TSS/SP/SSPs between Kukkadam-Valigonda section in the State of Telangana.
Additional Laying Distribution system of pipe line and its allied works due to construction of ROB near Haur Railway Station for Haur Water Supply Scheme in Panskura Block within Tamluk Sub-Division under Tamluk Division, PHE Dte, Purba Medinipur.
Railway track crossing by pipe pushing method at KM/TP-66/27-29 and KM/TP-66/28-30 between stations MXY and DXN of East Central Railway BOMB MINOR at Km. 2.925 and KM/TP-64/29-31 and KM/TP-64/30-32 between stations MXY and WDM of East Central Railway
... M.S. pipe of 800mm dia for Railway crossing by push through ...
Design, Supply, Erection, Testing and Commissioning for OHE upgradation ofexisting 1x25kV system to 2x25kV AT feeding system with feeder and earthing works in Mahbubnagar(MBNR)(excl)- Dhone(DHNE)(excl) section of Hyderabad Division under South ... Central Railway . ...
Supply, installation and commissioning of solar panel system including light & fan along with other electrical works in BVCM wagon as per RDSO drawing no. WD- 24050-S-07/sheet II with alt-3 or latest at Northern Railway Mechanical Workshop Amritsar.
Supplying and Stacking of Stone Ballast Required for Annual Need Based Maintenance and Restoration of Track After Derailment / Breakdown at HDCs Railway Network for the Year 2026-27at Haldia Dock Complex, Haldia.
Annual maintenance work of MPPGCLs private railway siding for power house at ATPS Chachai.
Disposal of slided earth from cutting portion of railway track from side drain i/c all lead & lift ensuring proper drainge and cess slope etc complete as per direction of engineer in charge
Supply of Electrical Materials and Equipment within area of Municipal council Chandur Railway.