Loading…
Loading…
2,419 results • Best match
Electrical work of Redevelopment of Pali-Marwar Railway Station of North Western Railway.
trench across crossing pole with transportation from main depot to required site. Note: - Cable will be supplied by Railways.
Construction of Pathway on Both Side of Railway Track near Wagon Tippler at BRBCL Nabinagar
Repairs to road from Kolad RUB to Kundalika II bridge parallel to the track at km10/3-10/8 in between Roha - Kolad section under SSE/Works/CHI Section in Ratnagiri Region of Konkan Railway in the State of Maharashtra
4.3Centering and shuttering including strutting, propping etc. and removal of form work for: 4.3.2Retaining walls, return walls, walls (any thickness) including attached pilasters, butresses, plinths and string courses fillets curbs and steps etc.
Annual Maintenance Contract for year 2026-27 and 2027-28 for carrying out, checking, maintenance and repair of Caterpillar make two engines model C 9 & C18 mounted on track machine High Output Dynamic and Stabilizing Machine (DTE) & Shoulder Cleaning ... (FRM) working in ... N.E. Railway with ... with supply of ... the Railway .
Provision of Two additional looplines with R&D facilities and associated works at Vijayanagar Railway station along with associated Electrical General, Electrical Traction and Signal & Telecommunication works (Composite work).
Provision of DC Single/ Double rail track Numbers circuiting Point zone to suit RE/Non-RE areas as per approved signaling plan using Plug-in type track relays. This work includes provision of double bonding, and parallel jumpers, provision of bond wire clips, provision of track lead connections using 2c X 2.5 sq.mm cable, provision of TLJB boxes 2 Nos. at Relay end, 2 Nos. at Feed end and 2 Nos for parallel jumpers as necessary to suit layouts, for each Track Circuit, and termination of jumpers and tail cables in track lead junction boxes, installation of relays, track feed battery chargers to charge up to 4 cells, track feed resistance, B type choke and secondary cells - 80 AH capacity in apparatus cases and wiring with wire PVC 3/0.75mm copper. The work also includes painting of track Circuit No. with Feed end/ Relay end details on the TLJB boxes. The work also includes provision of insulations for gauge tie p l a t e s and nose crossing plates wherever required. (Provision of rail joint insulation is not covered in this item) (Uninsulated gauge type plate and nose crossing plate will be supplied by Railways. Supply of track feed battery charger, B type choke, track relays, uncharged secondary cells (2V - 80AH), TLJB boxes with stumps, 2cX2.5 sq.mm cable, is not covered in this item). [track feed resistance, Gauge tie plate and nose crossing plate insulations, PVC/Nylon bushes for TLJB boxes, PVC sleeves, all types of fixing bolts and nuts with spring and flat washers, teakwood stand for fixing track feed resistance, GI bond wire 8 SWG, Channel bond pins, bond wire clips, paints and all other miscellaneous materials shall be supplied by the contractor. Secondary cells-80 AH capacity shall be charged by the contractor through reputed charging agencies]. HUBLI DIVISION-GATI SHAKTI/SOUTH WESTERN RLY
Request for Proposal for Construction of the Km: 400.169 to Km: 391.898 for 3rd line i.e. the 8.271 Km and the Km: 403.005 to Km: 392.300 for 4th line i.e. the 10.705 Km, total 18.976 Km between Sini and Kandra Junction, complete gauge conversion of ... existing track over ... Engineering works : ... new track alignment, ... way works including ... including track linking ... alignment, supply and ... per railway specifications, ... and track works ... track works at ... S&T works in ... civil works for ... electrical works , ... power supply of ... E. Railway on ...
1 Description :- For works consisting of civil works, signaling and telecom works with railway electrification