U P Irrigation Department (Civil)
Chief Engineer-Gandak, Gorakhpur/Gandak Flood Circle, Basti
Lost
Supply and stacking of Mirzapur Stone Boulder at the stockyard for AR Work during flood period for the Protection of Kalwari-Rampur embankment constructed on the Left Bank of River Ghaghra, Tehsil-Basti Sadar in Distt.-Basti.
Basti, Uttar PradeshAOC Updated 12 Aug 2026
UP
AOC
UP
AOC
EstNot disclosedL1
M/S ARPNA CONSTRUCTION
₹11.9 L
This company