a) Maintenance of Mylara (SH02) connectng Hyarada road via Dombrahalli thanda from 0.00 to 11.67 km,b) Maintenance of road from Mylara (SH-02) connecting Mylara Tungabadra river road from ch. 0.00 to 1.01 km, c) Maintenance of road from Budanur Govt.High School (on SH-40) connecting Budanuru (on SH40) road from ch.0.00 to 0.77km, d) Maintenance of road from Haravi Basapura cross (on SH225) connecting Linganayakanahalli thanda (on SH02) road via Siddapura from ch. 0.00 to 4.61 km, e) Maintenance of Makarabbi-Garbhagudi via Kanthebennur, Giriyapura mata , Veerapura road from ch 0.00 km to 7.24km, ch.7.28 to 14.92 km and ch. 15.05 to 24.95km, f) Maintenance of Holalu - Kuruvatti plot road from ch.0.00 to 3.33km and ch. 4.41 to 6.65km, g) Maintenance of road from Beerabbi cross(on SH-40) connecting Kotihal(on SH-219) road from ch. 0.00 to 1.00 km
Loading…